Mod 11 - paras 2.41 to 2.53

Showing comments and forms 1 to 30 of 31

Object

Proposed Modifications January 2016

Representation ID: 68775

Received: 14/04/2016

Respondent: Christine Kinsella

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

Object to proposals: -
- loss of green belt
- low-lying land susceptible to flooding
- sewage works has adverse impacts on residential amenity
- impact of construction traffic over many years
- lack of research on the part of the council

Full text:

I am very worried about the proposed massive development of 4000 houses to be built on King's Hill. This is low-lying green belt land and the major concern for me is the fact that, as the lowest part of Coventry, it is already susceptible to flooding around Finham Brook. So many houses on that land, will cover the earth where drainage would occur, and water draining off houses, paved drives and roads will have nowhere to go. With climate change and increased rainfall, this can only get worse.

Finham Sewage Works treats sewage from Kenilworth and Stoneleigh, as well as the whole of Coventry. As someone who lives in the area, I can tell you that it is not dealing adequately with it now. Certainly, when you walk past, the smell is quite overpowering, and on hot Summer days, the smell reaches the houses in Finham. How is it going to cope with another community of so many extra houses?

There is no convenient access to King's Hill, unless the enclosing roads are widened dramatically. This would destroy ancient protected hedgerows and oak trees. The old Leamington Road already carries a lot of traffic and is completely congested if any of the surrounding trunk roads and motorways are closed, and they frequently are!

The development will take years to be carried out, involving bulldozers and lorries driving up and down narrow roads - a danger to children - while the extra sewage, gas, electricity, telephone, and water services are installed. Then the bricks, slates, insulation etc. necessary to build the houses themselves will need to be ferried in.

A lot of research has been done by the Finham Resident's Association, which I know you have received - in depth, careful research. Can you honestly say that your modifications cover all their objections adequately? I don't want Finham sinking under sea of flood water and sewage in ten years time, when it is too late to do anything about it.

Object

Proposed Modifications January 2016

Representation ID: 68781

Received: 14/04/2016

Respondent: MR ROBERT DONNELLY

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

Objects to allocation: -
- impact on natural environment
- impact on historic environment
- flooding
- additional traffic
- adverse impact on existing facilities and services
- threat to Alvis sports club
- loss of landscape and visual amenity
- should look to other sites and promote regeneration

Full text:

King hill is home Badgers,Muntjac deer,Newts that populate the ponds on kings hill and numerous varieties of birds plus a bat colony .
The land contains the sites of a least two ancient Saxon settlements.
The land is prone to high levels of water in parts .
Why would Warwickshire build a stand alone development next door to Coventry AND Coventry allow this to happen if it were not to receive any benefit from it ie council tax. As i see it Finham would be over whelmed with the extra traffic, noise ,schools and medical services unable to cope. Green lane south in particular is no more than a country lane with its protected ancient hedgerow (mentioned in the Doomsday book) running down the road marking the border between the West Midlands and Warwickshire.Why not build onto existing Towns and Villages !!!!!.

The Alvis sports and social club is under threat from housing. The club is home to football teams of all ages young and older. There is a Netball team ,cricket teams and a bowling team plus a dominoes team and pool team.What would happen to this facility which supports the local community. Does health not matter anymore ?.
Kings hill is an area of beauty and should not be lost. It forms a natural screen of Coventry from Warwickshire as you travel along the A46. Houses would destroy this.Other areas should be considered first and foremost before green fields. Regeneration might cost more but would have less impact on the environment in the long term.

Object

Proposed Modifications January 2016

Representation ID: 68848

Received: 21/04/2016

Respondent: Mrs. Elizabeth Rowley

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Object to allocations: -
- adverse impact on character of village
- poor / unsafe access into village
- traffic congestion and parking
-road safety adversely affected by increase in traffic
- adverse impact on existing services and facilities
- lack of capacity at train station

Full text:

See attached

Attachments:

Object

Proposed Modifications January 2016

Representation ID: 68894

Received: 15/04/2016

Respondent: mr Charles McDonald

Legally compliant? Yes

Sound? No

Duty to co-operate? No

Representation Summary:

Object to proposals: -
- lack of suitable infrastructure will be exacerbated by additional traffic
- Coventry Local Plan proposing additional housing in area
- significant congestion already occurs
- HS2 works will last for a number of years and will generate large numbers of HGV movements
- overall infrastructure provision for both Coventry and Warwick should be planned and co-ordinated
- any housing development should not commence until after HS2 has finished construction in 2026

Full text:

Comments concerning WDC plan modifications
Modification 20 Paragraph 2.54
Policies Map 35

With reference to the above proposals in the WDC plan modifications, I am a resident of Cromwell Lane and have already responded to the Coventry local plan but since the building of 425 homes South of Westwood Heath road as proposed in the WDC plan will have a very serious impact on the wider area I would like to make the following comments and objections.
* I do not believe the proposal for these homes is sound as it does not take account of the traffic and infrastructure difficulties which already exist in this area and which will be made infinitely worse with the addition of 425 homes and around 800 extra cars.
* The Coventry Plan is already proposing 240 homes to the West of Cromwell lane with no suggestion of any infrastructure improvements in the area apart from 'considering resident's parking schemes in adjacent roads.'
* The general area of Tile Hill, Cromwell Lane and Westwood Heath is already badly congested for large parts of the day due to the opening of the flyover in 2005, the construction in recent years of approximately 2000 new homes in the wider area, the extra traffic and parking problems caused by the Centro operation of the park and ride facility at Tile Hill station which is oversubscribed every working day, the large number of HGV vehicles which use these minor roads on a daily basis from Logistic facilities with no direct access to major roads and the large amount of traffic which uses Cromwell Lane/Westwood Heath roads as a through route to the A46, the University of Warwick and beyond.
* The proposed HS2 works at Burton Green are scheduled to last from 2016 to 2026 and will involve major works in the area around the A46/Stoneleigh Rd junction, the construction of a compound east of the A46, major works at Bockendon Rd. and the actual construction works at Burton Green. The published vehicle movement schedules show a large amount of HGV and general traffic in the area for the next 10 years which must have an impact on local minor roads.
* To make the plans of both Coventry and Warwick sound for this area the issues above have to be addressed and an overall infrastructure scheme for the area formulated which will mitigate if not completely solve these problems. Otherwise the proposals for both these developments are not sustainable and therefore not sound.
* In the event of these proposals going ahead, I believe that no building works should commence until the HS2 project is completed in 2026 to prevent the area being swamped with construction and other traffic

Object

Proposed Modifications January 2016

Representation ID: 68930

Received: 04/04/2016

Respondent: Highways England

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? No

Representation Summary:

We have reviewed the proposed main modifications and have no specific comments on the document other than that Highways England should be included in those bodies with which Warwick District Council propose to co-operate on the delivery of the development proposals south of Coventry (see last paragraph on page 18 relating to Policy DS New 1).

Full text:

See attached

Object

Proposed Modifications January 2016

Representation ID: 68953

Received: 20/04/2016

Respondent: Peter Langley

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

New paragraphs 2.1 to 2.43 talk about taking land out of the Green Belt so that it can be safeguarded for possible future development. In relation to government policy, there is even less of a case for this than where development is claimed to be needed during the plan period, and I have already shown that the latter is contrary to government policy.

Full text:

Even though it purports to follow government guidance, the Strategic Housing Market Assessment (SHMA) is not independent and is seriously defective. It has considered only one side of the equation and only those with a vested interest in growth have influenced its findings. Population and household projections have been wrongly used as if they were forecasts. The assumption on headship rates is questionable and the study fails to get to grips adequately with economic issues, commuting, international migration, student needs and affordable housing. Above all, the SHMA acknowledges the high degree of uncertainty about the future but then plumps for a single figure of so-called Objectively Assessed Need (OAN) which is poorly justified. This figure is seriously lacking in credibility. [section 3]

The local authorities in their Memorandum of Understanding have misused the SHMA by adopting the so-called OAN uncritically and indeed adding to it. They have failed to consider whether environmental and other policy factors limit the ability of the area to meet its housing needs. The decisions they have reached about the distribution of housing provision within the housing market area are arbitrary, opaque and extreme, making the proposed plan unsound and unsustainable. The proposal that Warwick District should take the largest share of Coventry's overspill is reckless and wholly unjustified given the Green Belt status of a large part of the district. [section 4]

The Council have failed to demonstrate that nearly 17,000 dwellings can be built in the district by 2029. All the evidence suggests otherwise. Their response to the low level of dwelling completions in the first four years of the plan period is to allocate even more housing, without considering what (if anything) can be done to improve building rates within the existing allocation. As a result, the proposed plan would have a range of undesirable consequences for urban regeneration, vacancy rates and dereliction, commuting, service and infrastructure costs, housing opportunities and loss of Green Belt which neither the Council nor the Sustainability Appraisal have adequately considered. Those negative effects which the Sustainability Appraisal does recognise have played no apparent part in the development of the strategy. Almost half the dwellings to be built on allocated sites are in the Green Belt. The proposed plan is unsustainable and is directly at odds with policy in the National Planning Policy Framework. [sections 5 and 6]

The proposed plan and the cumulative impact of its development proposals would exacerbate problems which the district already faces such as loss of character and environmental quality, traffic congestion and inadequate public transport. Many of the individual housing proposals - particularly those involving substantial loss of Green Belt - cannot be justified and will do great damage. Nearly half of housing development on allocated sites would be in the Green Belt and the proposed plan does not comply with government policy on housing development in the Green Belt. Insufficient consideration has been given to the infrastructure implications of development on such a large scale. [section 7]

The plan is unsound, unsustainable and unworkable. It stems from a deluded view of the growth potential of Coventry and Warwickshire and is contrary to government policy. The plan needs to be fundamentally re-thought and housing provision of between 10,000 and 10,500 dwellings would be much more appropriate and potentially achievable. [section 8]

3. Defects in the Strategic Housing Market Assessment (SHMA)
The SHMA prepared by G L Hearn was intended to be an objective assessment of housing need in Coventry and Warwickshire. While it purports to follow government guidance, it has the following serious defects which fatally undermine its credibility:
* As a general rule, only organisations with a vested interest in increasing housing provision from its already very high level have been consulted. Those able to take a more detached and balanced view were conspicuously excluded. The local authorities themselves have a strong incentive to push house building rates higher and higher thanks to the New Homes Bonus.
* While the terms of reference for the study are reasonably objective, a wealth of e-mail correspondence between the local authorities and the consultants (released under the Freedom of Information Act ) suggests that there was a good deal of manipulation behind the scenes.
* The study rightly uses ONS population and household projections as the baseline for its work, but treats them as if they were forecasts. On the contrary, ONS say ''The population projections have limitations. They are not forecasts (my italics) and do not attempt to predict the impact that future government policies, changing economic circumstances or other factors (for example, government policies on immigration or student fees) might have on demographic behaviour...... As a forecast of the future population they would inevitably be proved wrong, to a greater or lesser extent..... Projections become increasingly uncertain the further they are carried forward into the future'. Hearns have fundamentally erred in treating the projections as forecasts and failing to consider how the policies or other factors that underlie them may change in future. They assume (paragraph 3.34) that uncertainty is mainly attributable to inadequacies in base data, but the effects of future changes in societal trends and public policy are likely to be far more influential. The SHMA never faces up to these issues.
* There is an unexplained anomaly in the use of the projections. The difference from the 2011-based to the 2012-based projections for the HMA is a decrease of 127 dwellings per annum. However, in Hearns' work this results in an increase of between 472 and 572 dwellings per annum . The consultants do not adequately explain this apparent conflict.
* The approach is based on the implicit assumption that new dwellings will meet existing and future housing needs, but this is not the case. Almost 90% of the private housing market involves existing, not new, housing stock. With the exception of starter homes, the great majority of new dwellings are bought by existing home owners. Except in the very long term, prices are insensitive to the volume of new house building and the market is not particularly effective in ensuring that newly arising housing needs are met.
* The study rightly explores a very wide range of scenarios in its attempts to quantify Objectively Assessed Need but fails to critique the underlying methodologies of the different models in which it places its faith. The study plumps for single figures within the range of possible outcomes (often towards the upper end of the range) that are arbitrary or poorly justified. The eventual recommendation that 4,272 dwellings per annum should be built in Coventry and Warwickshire seems to be a black-box generated number instead of being backed up by credible analysis at each step in the process.
* The 'part return to trend' on headship rates is poorly explained and justified. It is far from certain yet whether the cessation of the fall in average household size in recent years is just a 'blip' or the 'new normal' . The factors likely to influence this lead in different directions and give different outcomes. The consultants assume that a reduction in average household size will resume, but there is very little evidence for this;
* The economic forecasts used by Hearns give widely divergent results. The fact that they are based on past development trends is a major weakness, particularly as only a short, probably unrepresentative period has been considered. They also lack explicit assumptions about the productivity relationship between GVA and job growth. Yet the Local Enterprise Partnership is trying to attract high tech and high value added jobs, which would result in a lower number of jobs for a given level of GVA;
* The Strategic Employment Land Study is based on very arbitrary assumptions and data and has not been subjected to critical analysis. The 'talking up' of Coventry's employment prospects in section 4 of the study is very speculative, verging on wishful thinking, and the whole OAN is consistent with a rose-tinted view of economic prospects in Coventry and Warwickshire, bearing in mind past lower than national growth rates and skills shortages . Hearns have suggested upward adjustments to OAN in some areas in relation to economic prospects, but do not seem to have considered downward adjustments in other areas so the analysis is all one way. The equation made between jobs and people is over-simplistic;
* The assumptions about commuting are unrealistic. Commuting patterns change over time and it should be one of the objectives of a plan to reduce longer distance commuting in the interests of sustainability. Conversely however this plan is likely to lead to significant increases in commuting (see Section 6 below). The assumption that the commuting rate will remain as in 2011 is therefore naive and lacks any credibility;
* Much of the increase in population in Coventry over the past ten years or so appears to be related to the growth in student numbers in the city. A huge amount of development of student accommodation has taken place. The SHMA never properly addresses this issue. It fails to consider whether and to what extent these trends are likely to continue into the future; or the extent to which students require separate housing provision (as opposed to living in halls of residence or shared accommodation). Why should there not be a 'partial return to trend' on this issue, as on headship rates?
* International migration is mentioned in section 3, but there is no discussion of whether past trends are likely to continue. The Government is under intense political pressure on this issue and has maintained its target of lowering net in-migration by more than half. The outcome of the EU referendum is also likely to have a bearing on international migration. In recent years, Coventry has taken more than its fair share of in-migrants. There is no reason to think that in-migration to the city can or will continue at anything like recent levels. In Warwick District, net migration (including international migration) has varied greatly from year to year since 1995 and is inherently unpredictable. Also, net migration is influenced by housing and employment provision so there is an element of circularity in any forecast which is based on past trends;
* The relationship between affordable housing and overall housing need is never convincingly established by the study. Affordable housing should be a sub-set of overall need, not an 'add-on', so Hearns' upwards adjustment of OAN to take account of affordability appears unjustified. It is also debatable whether 'affordable housing' is affordable in practice to many new households. There is no evidence that Hearns have taken sufficient account of recent changes in government policy.
To sum up, the SHMA is a seriously flawed piece of work that should not have been used without critical analysis. At best the resultant so-called Objectively Assessed Need is subject to great uncertainty; at worst it is not credible at all.
4. Defects in the Way the SHMA Has Been Interpreted and Used
Government guidance is that Objectively Assessed Need should be a starting point for assessing what housing provision should be. The National Planning Policy Framework (NPPF) recognises that there may be circumstances in which development requirements cannot be met because of the demonstrable lack of environmental capacity.
In a letter in December 2014 , the then minister said 'A Strategic Housing Market Assessment is just the first stage in developing a Local Plan and councils can take account of constraints that indicate that development should be restricted.... The outcome of a Strategic Housing Market Assessment is untested and should not automatically be seen as a proxy for a final housing requirement in Local Plans......Councils will need to consider Strategic Housing Market Assessment evidence carefully and take adequate time to consider whether there are environmental and policy constraints, such as Green Belt, which will impact on their overall final housing requirement.' Unmet needs from neighbouring authorities should be met 'where it is reasonable to do so and consistent with achieving sustainable development' .
The Local Plans Expert Group have drawn attention to a common deficiency in local plans. They conclude that 'despite the clear test set by paragraph 14 of the NPPF, few authorities compile an assessment of the environmental capacity of their area' . They go on to propose that a proportionate Assessment of Environmental Capacity should be an important part of plan making. The local plan making authority should consider the extent to which the plan can meet OAN consistent with the policies of the NPPF.
This type of approach is conspicuously absent in Coventry and Warwickshire. The local authorities in their so-called Memorandum of Understanding and Warwick District Council in its plan have taken a lemming-like approach which is directly at odds with Government policy. They have decided without adequate explanation that Hearn's Objectively Assessed Need of 4,272 dwellings per annum (already an artificially high figure) should be increased still further to a housing target of 4,408. They have then failed to consider whether environmental constraints prevent this new figure being met in its entirety. The Hearn approach and its results have not been subjected to any critical analysis whatsoever and the uncertainty that runs right through the study has simply been ignored. It is sheer folly to pick out a single figure and stick to it come what may. Such an inflexible approach is certain to be found wanting as the implementation of the plan unfolds. Meanwhile a great deal of damage will have been done. The position is even more serious in Warwick because the modification to policy DS20 opens the door for even further housing development in future to meet unspecified housing needs in other areas.
The housing proposals for individual authorities are unjustified, to say the least. Coventry is deemed (without supporting evidence or argument) to be able to accept only 1230 (64%) of its OAN of 1930 per annum. The remaining 700 is distributed (without explanation) between three Warwickshire districts - Nuneaton and Bedworth, Rugby and Warwick. In Warwick's case, this results in proposed housing provision of 18,640 over the full twenty year period to 2031, which is over 55% higher than its own OAN. This is a fundamentally unsustainable and unjustified outcome.
The Warwick Plan gives no explanation of -
a. Why Coventry cannot meet more of its OAN;
b. How the allocation of the excess to other authorities has been decided. The 'redistribution methodology' has not been explained or justified;
c. The account taken of Green Belt, environmental and other policy constraints, both in Coventry and in the surrounding Warwickshire districts, in making this judgement;
d. The wider effects of 'transferring' housing need originating in Coventry to Warwick and other authorities.
The plan also fails to consider the density of new housing development or whether intensification of use of the existing housing stock could be achieved without loss of quality in the urban environment. On most development sites, a density of 35 dwellings per hectare has been automatically assumed, ignoring the variability between sites and their settings and the potential for higher density. By leaving this vital issue unconsidered, the plan fails to provide adequate justification for the link between the vast quantum of new housing development proposed and the huge land area involved.
The Warwick Local Plan is therefore fundamentally unsound and unsustainable, quite apart from its unquestioning reliance on a deeply flawed Strategic Housing Market Assessment. The approach taken is, quite simply, indefensible.
5. Implementation Problems
Government guidance requires the Council to demonstrate the deliverability of the plan . The Council do not seem to have asked themselves whether it is realistic to expect 16,776 dwellings to be built in Warwick District between 2011 and 2029.
The Council claim that 1,483 dwellings were completed in the district during the first four years of the plan period - 2011 to 2015: an average of 371 dwellings per annum. The plan requires an average of 932 dwellings per annum to be built over the full plan period, including those first four years. If dwellings built in the first four years are discounted, the average for the remaining fourteen years rises to 1,092 dwellings per annum, nearly three times the rate achieved in the first four years (during which the economy was growing). It simply cannot be done.
The Housing Trajectory in Appendix A shows very clearly the unreality of what the Council are proposing. Average completions per annum between 2018 and 2022 are assumed to be some 1,730 per annum, nearly five times the rate achieved in the first four years of the plan. The beginning of this period is a mere two years away and the assumption seems to ignore the lead time required to assemble skilled workers on a very large scale.
The plan states that at April 2016 there will be sites with planning permission for 5,161dwellings. It is very difficult to believe that all these permissions will actually be implemented during the plan period, though that is apparently what the plan assumes (in contrast, for example, to the Rugby Local Plan which assumes low take-up of existing permissions). In reality, allocating many more sites is likely to reduce the take-up rate on existing permissions still further. Over-allocation on this scale would effectively destroy the planning strategy because the Council would surrender control to house builders over where and when dwellings would be built. Adding an arbitrary 'element of flexibility' to housing provision , taking it up to a grand total of 17,557 , makes matters even worse.
A figure of 16,776 dwelling completions by 2029 therefore belongs in the realms of fantasy. National and regional studies have shown that the main factor limiting the scale of house building has been the sharp decline in public sector house building. Despite some recent policy announcements, there is little prospect of a significant revival in house building by this sector. Private sector building has been stuck at around 90,000 dwellings per annum nationally since 2008 and the latest RICS survey indicates that growth in private sector house building slowed considerably during the first quarter of 2016. Overall, housing permissions have exceeded starts by about 50,000 dwellings per annum nationally in recent years .
A recent study by The Guardian newspaper showed that the nine largest national house building companies were sitting on planning permissions for 615,000 dwellings. Either they were incapable of building more because of shortages of labour, materials and / or finance; or effective demand is so low that they had no confidence that they could sell houses if they were built, or they chose to limit their output in order to keep house prices artificially high. Some house builders may also see investment in land as an end in itself in view of rising land prices. The truth probably lies in some combination of these factors. House builders have recently been criticised for 'land banking' by the Local Government Association.
So the prospects of 16,776 dwellings being built in Warwick by 2029 are negligible. Even so, house builders continue to press for high levels of provision so that they will have even more scope to pick and choose the sites that will bring them the greatest profits. This is understandable from their point of view, but should never form part of a credible planning strategy.
6. Likely Effects of the Housing Policies
As a result of this serious over-provision, the plan's housing proposals will have a wide range of unintended consequences -
a. The sites that provide developers with the greatest potential profit will tend to be green field sites outside urban areas rather than brownfield sites within them. The momentum behind urban regeneration will therefore be weakened still further and it will become much more difficult to redevelop windfall sites becoming available within the urban area. The Local Plan is right to have made an allowance for windfalls, but the more green field sites they allocate for housing development, the more difficult it will become to benefit from windfall sites;
b. Over-provision of housing can be expected to accelerate vacancy rates, dereliction and decay in the existing stock, particularly in the more marginal housing areas;
c. The displacement of housing from Coventry into Warwickshire will increase longer-distance commuting and lead to greater car dependency. No proper analysis has been done of this vital aspect of the proposals, least of all by the Sustainability Appraisal. Can the road and public transport systems cope with the extra traffic and passengers? With many roads, particularly in the towns of Warwick, Leamington Spa and Kenilworth, close to or above capacity already, the strong suspicion must be that the Warwick plan is unsustainable in transport terms. Where new roads or improvements to existing roads are proposed, insufficient information is given to demonstrate their financial viability or effectiveness in dealing with congestion;
d. A more dispersed pattern of development will lead to higher service and infrastructure costs once existing capacity thresholds have been exceeded, and will divert severely limited public sector resources away from renewal of services and infrastructure within existing urban areas . Developer contributions are rarely sufficient to provide necessary supporting services and facilities in their entirety;
e. Provision at a level not supported by effective demand is particularly destructive of the housing opportunities available to newer, younger and less well-off households: those most likely to be in housing need. New housing will overwhelmingly not be purchased by newer households. It is not valid to assume that a glut of new housing will result in lower prices all round, making the existing stock more affordable to those in housing need. In practice new homes are generally such a small proportion of the total housing stock that they do not have a significant lowering effect on prices;
f. Very substantial areas of Green Belt will be lost, compounded by losses for other purposes such as the sub-regional employment site. Proposed housing development in the plan accounts for some 500 hectares of Green Belt land and much of this is in strategically significant areas where the Green Belt performs vital functions, meeting all or most of the five purposes of Green Belt. It is very revealing that the plan does not make clear that meeting housing needs is not sufficient on its own to constitute the very special circumstances needed to justify inappropriate development in the Green Belt (see below) and that it generally ignores the recommendations of the Joint Green Belt Study;
g. Rigid adherence to forecasts gives only the illusion of certainty, inhibiting necessary adaptations to new problems and unforeseen opportunities . Warwick and the other Coventry and Warwickshire authorities have chosen to adopt a particularly rigid and unresponsive interpretation of present government policy and their proposals are therefore doomed to fail in practice.
These potential impacts of the Warwick Plan's housing proposals render the plan unsustainable and therefore not in compliance with government policy in the National Planning Policy Framework.
In particular, the plan fails to give sufficient weight to two key aspects of government policy:
a. That the presumption in favour of sustainable development does not apply in the Green Belt ;
b. That need for housing will rarely be sufficient to constitute the very special circumstances required for inappropriate development in the Green Belt. In July 2013, Local Government Minister Brandon Lewis said that 'The single issue of unmet demand....is unlikely to outweigh harm to the green belt and other harm to constitute the 'very special circumstances' justifying inappropriate development in the green belt' This was followed by a DCLG policy statement in October 2014 - 'the local planning authority should prepare a strategic housing land availability assessment to establish realistic assumptions about the availability....of land...and take account of any constraints such as green belt which indicate that development should be restricted and which may restrain the ability of an authority to meet its need . This was in turn reflected in Planning Practice Guidance . Yet Warwick District Council, along with the other Coventry and Warwickshire authorities, seems to have ignored this very important element of government policy .
The Sustainability Appraisal has been updated to reflect the latest modifications to the plan and specifically the huge uplift in housing numbers. However it suffers from a major weakness: that it treats the Strategic Housing Market Assessment and the local authority Memorandum of Understanding as givens without subjecting them to sustainability appraisal in their own right. In general it does not apply sufficiently rigorous analysis and places exaggerated faith in mitigation measures. It plays down some negative effects because of uncertainty about the exact form development will take. It also makes some very questionable individual assessments - for example that the effect of high growth on public transport and community services and facilities will be positive, when experience suggests that provision of these facilities and services almost invariably lags well behind housing development, particularly when it takes place as rapidly as is envisaged in this plan. A positive assessment of the high growth options against 'reduce need to travel' also seems fundamentally misguided when such a high proportion of the proposed development involves meeting Coventry's housing needs in Warwick District.
Impact on the Green Belt should have featured as one of the sustainability criteria used to appraise the plan and its policies. Green Belt is simply subsumed within the much wider criterion of 'Prudent Use of Land and Natural Resources' and it tends to get lost in the process. The appraisal frequently pulls its punches, talking for example about the potential for the loss of Green Belt when the strategy entails certainty of massive Green Belt loss.
Nevertheless the Sustainability Appraisal finds that the two high growth options (900 and 1,000 houses per annum) would have negative effects in relation to six of the sustainability criteria used to assess options. This conclusion is effectively ignored in the plan itself and there is no evidence that it has played any part in the development of the strategy. The Council have wrongly assumed that they have no alternative but to meet so-called Objectively Assessed Need in full, plus the huge uplift to meet Coventry's excessive housing needs.
7. Comments on Specific Housing Policies and Proposals and their Justification
My calculations suggest that some 4,575 (49%) of the new dwellings on specifically allocated sites would be in the Green Belt. This is a staggering figure which cannot possibly be reconciled with Government policy as described above. It is difficult to imagine why Warwick District Council, given the large amount of its land area subject to Green Belt policy, agreed to accept by far the largest individual proportion of Coventry's overspill (6,640 dwellings). On the basis of conflict with government policy and the need to preserve a strong Green Belt to secure the continued separation of the towns in the district from each other and from Coventry, I object to all the locations for housing development listed in paragraph 2.81 as having been removed from the Green Belt.
My comments on selected proposals are as follows:
* Kings Hill (H43) - This development would be a huge and totally unwarranted projection of the built-up area of Coventry into the Green Belt and open countryside south of the city. It would doubtless be followed soon afterwards by an application for a boundary revision to extend the city's area. This is an area of good quality landscape which makes an important contribution to the role of the Green Belt in separating Coventry from Kenilworth. The proposal relies heavily on a new railway station and roads but given the long delay in securing reopening of Kenilworth station there can be no guarantee that a station at Kings Hill will be open before development takes place.
* East of Kenilworth (H40) - This long swathe of development would close the Green Belt gap which currently exists between the built-up area of the town and the A46. On rising ground, the development would be very visible from countryside to the east near Ashow and the National Agricultural Centre.
* North of Milverton (H44) - This would constitute a substantial northward extension of Leamington Spa into the Green Belt, bringing it significantly closer to coalescence with Kenilworth. The safeguarding of a large area of additional land for future development makes the present proposal just the thin end of the wedge. The explanation talks blithely about dualling the A452 but this is unlikely to be feasible within the existing built-up area of Leamington and may not be affordable in any case.
* Baginton (H19) - The Rosswood Farm site, almost in line with the airport runway, seems particularly ill chosen from the point of view of noise, air pollution and air safety.
* Barford (H48 et al) - The cumulative impact of these developments would be expected to have a substantial impact on the character of the village.
* Bishops Tachbrook (H49 and H23) - Taken together, development of these sites could be expected to have a profound effect on the character of the village and would involve projections into open countryside to the west and south.
* Cubbington (H50) - A substantial projection of development into pleasant open countryside east of the village.
* Hampton Magna (H51 and H27) - Taken together, these developments would represent a huge extension of the village into Green Belt and open countryside to the south and east, changing the character of the village in the process.
* Leek Wootton (DS NEW 3) - Although a minority of the site was already developed, this does not justify the proposal, which forms a very substantial westward extension of the village into open countryside and Green Belt.
* Whitnash (H-03) - Whitnash is already a peculiarly shaped and poorly accessed urban extension. This large development will add an extension to the extension, taking the village across the railway to the east and making it stick out even more like a sore thumb. It is noticeable that there is no proposal for a railway station to serve it.

Policy DS New 1 includes vague criteria for allocating land for housing south of Warwick. It is wrong in principle to consult without more clear-cut proposals, leaving local people and interest groups in a position of great uncertainty.
The plan is far too deferential towards the growth aspirations of Warwick University. The plan should not give the university carte blanche to do whatever it wishes to do, but that in effect is what is proposed.
A general problem is the heavy reliance on master planning for comprehensive development of the larger proposed housing sites. This will make it even less likely that the housing proposals will be implemented on anything like the timescale envisaged in the housing trajectory, particularly where land is in multiple ownership.
In new paragraph 1.09, the plan talks about new development enhancing the setting of natural and heritage assets. This is delusional and makes a mockery of what little remains of the plan's environmental credentials.
New paragraphs 2.1 to 2.43 talk about taking land out of the Green Belt so that it can be safeguarded for possible future development. In relation to government policy, there is even less of a case for this than where development is claimed to be needed during the plan period, and I have already shown that the latter is contrary to government policy.
I have not found a policy directed towards controlling or influencing the types and sizes of dwelling to be constructed in the district. This plan seems to treat planning for housing as no more than a numbers game and in doing so it ignores government policy that the nature of new housing is important .
8. Conclusions
The housing proposals in the emerging Warwick Local Plan are unworkable, unsustainable, contrary to key elements of Government policy and against the interests of residents of the borough. They are deluded and unsound. They stem from a fundamentally misconceived growth-orientated strategy that reflects wishful thinking about the economic prospects of the sub-region by the Local Enterprise Partnership and the Coventry and Warwickshire local authorities compounded by some far from independent technical work of questionable quality to support it. The proposals give minimal weight to the environment and character of the district, which have hitherto been cornerstones of successive plans. They will result in the Council effectively abandoning control over planning for housing and in a significant reduction in environmental quality.
Much of the problem with the housing strategy stems from Coventry's overweening growth aspirations, which result in dumping large quantities of housing and employment development on neighbouring local authorities. This is counter-productive, unsustainable and unachievable. If Coventry cannot live within its means, it should not simply decant large-scale development to neighbouring authorities with no thought for the consequences..
The question of what would be a realistic and achievable level of housing provision for Warwick between 2011 and 2029 is a matter of judgement rather than calculation. Taking into account all the factors discussed in this Critique, my view is that provision of between 10,000 and 10,500 dwellings would be appropriate. This would have a good prospect of being achieved and would meet the reasonable housing needs of the district, as opposed to the inflated figure assessed by G L Hearn and the huge additional uplift provided through overspill from Coventry. Provision at this level would allow a much higher proportion of development to be on brownfield sites within the urban area (including windfalls) and would require little or no release of Green Belt land for housing.

Object

Proposed Modifications January 2016

Representation ID: 68995

Received: 21/04/2016

Respondent: Environment Agency

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

Paragraph 2.41
We note that sites were assessed for their suitability against the SFRA Level 1. Warwick District Council's SFRA is dated April 2013 and we recommend that it is updated to take into account changes in Policy (NPPF) and the revised climate change allowances.

Full text:


Warwick Local Plan

Proposed Modifications

Thank you for consulting the Environment Agency in relation to Proposed modifications to the Local Plan published in February 2016.

We have carefully reviewed the modifications proposed within the document based on the Planning Inspectors Interim Report and we find the it meets the tests of soundness:

We agree that the plan is positively prepared, justified, effective and consistent with national policy with the proposed modifications.

We have the following comments to make:

Modification 15
We support the wording of the proposed modification.

Modification 21 - Section 1.8
The Finham Brook, a designated Main River flows through the King's Hill site H43 near the southern boundary. We would support proposals to create land for open space and this should be linked in to the provision of green and blue infrastructure. Every opportunity should be taken to create additional flood storage to reduce the risk of flooding elsewhere.

Ammendments to Policy DS11 Paragraph 2.4.1
We note that sites were assessed for their suitability against the SFRA Level 1. Warwick District Council's SFRA is dated April 2013 and we recommend that it is updated to take into account changes in Policy (NPPF) and the revised climate change allowances. The Environment Agency updated their guidance on how climate change could affect flood risk to new developments - 'Flood risk assessments: climate change allowances' published on gov.uk on 19th February and came into immediate effect.

The update is based new scientific evidence. The main changes are to the peak river flow allowances. We are currently preparing new guidance which can be appended to the SFRA before the examination of the Local Plan is resumed.

Object

Proposed Modifications January 2016

Representation ID: 69058

Received: 21/04/2016

Respondent: Warwickshire Police and West Mercia Police

Agent: Place Partnership Limited (PPL)

Legally compliant? Yes

Sound? No

Duty to co-operate? Not specified

Representation Summary:

This representation encloses examples of appeal judgements that substantiate that contributions towards police infrastructure in relation to housing development sites are CIL compliant and justifiable.
It is suggested that the text in the modifications (Mod 11 paragraph 2.49 in particular)is added with an explicit reference to police infrastructure requirements(see suggested change to plan below).

Full text:

See attached

Support

Proposed Modifications January 2016

Representation ID: 69165

Received: 22/04/2016

Respondent: Lioncourt Strategic Land - Andy Faizey

Agent: Savills

Representation Summary:

SUPPORT modification to the Plan and the inclusion of Kings Hill (Site Ref: H43) to provide up to 4,000 dwellings.
Lioncourt and the consortium that it represents confirms that at least 1,800 dwellings can be delivered within the Plan period.
The Illustrative Framework Plan (submitted alongside this representation) shows the proposed approach to delivering the urban extension and key infrastructure.

Full text:

see attached

Attachments:

Object

Proposed Modifications January 2016

Representation ID: 69245

Received: 22/04/2016

Respondent: Taylor Wimpey

Agent: Barton Willmore

Legally compliant? No

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Hampton Magna
We disagree with the proposed allocations made in Hampton Magna, as we consider that the land under the control of Taylor Wimpey at Old Budbrooke Road is superior and offers a more sustainable and logical extension to the settlement of Hampton Magna.

Full text:

We write on behalf of Taylor Wimpey UK Ltd in respect of their land interests on land at Old Budbrooke Road, Hampton Magna. A site location plan is enclosed with these representations at Appendix 1 alongside a leaflet detailing the development proposals for the Site at Appendix 2.


The site is not part of a proposed allocation, with sites H27 (130 dwellings) and H51 (115 dwellings) being proposed for allocation in Hampton Magna. However, for the reasons set out below, we consider that given its sustainable location and proximity to services and facilities within the village the land in the control of Taylor Wimpey UK Ltd provides a better option for sustainably meeting the needs of Hampton Magna in the future and is capable of delivering circa 140 dwellings.


The Site occupies a sustainable location situated to the north-east of Hampton Magna. It is bordered to the south by residential development, to the west by Old Budbrooke Road, to the north by a farm track and then the Warwick Parkway railway station and to the east by Stanks Farm building and a disused sewage works. The boundaries to the site form logical and defensible boundaries and the site offers the opportunity to add sensibly to the built form of the village. The site would offer good pedestrian linkages, particularly to the railway station to the north of the site, along with the provision of substantial areas of public open space and landscape buffers to the north and south of the site.

In comparison to the proposed allocations within Hampton Magna, the site offers logical access direct from the Old Budbrooke Road, whereas the proposed allocations offer little opportunity for direct access, particularly for construction other than through the centre of the village itself. Furthermore, we consider that the landscape impact of the proposals to the south of the village will be greater as they benefit from inferior boundaries and levels of containment.


In relation to this Site, we comment Main Modifications as follows:

Mod 4 - Policy DS6

Whilst we are generally supportive of the Council's approach to increasing the housing target, taking account of unmet needs to assist the HMA in meeting the requirements of


24707/A3/VL/RC/lfw 2 22nd April 2016




the NPPF and satisfying the Duty -to-Cooperate, we remain concerned that the level of uplift at the HMA and District levels is insufficient.

We enclose at Appendix 3 a critique of the Council's position on meeting housing needs across the HMA.

At this time, we are of the view that the housing requirement for the HMA over the period (2011-2031) should be a minimum of 100,200 dwellings (5,010 dpa), with our updated and preferred methodology increasing this to 126,000 (6,300 dpa).

For Warwick District we consider that the OAN is a minimum of 20,800 dwellings (1,040 dpa), with our updated and preferred methodology increasing this to 23,400 dwellings (1,170 dpa).


The figures for Warwick do not take account of any need to redistribute housing within the HMA based on the Duty-to-Cooperate and Local Authorities, such as Coventry City, being unable to meet their own housing needs.

Mod 6 - Policy DS7

Notwithstanding our response to Mod 4, and the contention that the housing requirement should be increased further to 23,400 dwellings (1,170 dpa) for Warwick District over the period 2011- 2031 (not accounting for unmet needs within the Coventry HMA), we wish to comment on the amended Policy DS7, which sets out how the housing requirement will be met.


The Council has proposed to allow for the delivery of an additional 811 dwellings over and above the proposed requirement of 16,766 dwellings for the Plan period (2011- 2029). Regardless of any changes to the housing requirement, we support the approach of the Council in seeking to allocate additional land; as such an approach adds significantly to the soundness of the Council's approach by providing a positively prepared Plan that will be more effective in delivering the minimum housing needs of the area, and is flexible to changing demands over the Plan period.


The inclusion of safeguarded land will also play a key role in achieving these outcomes, which is supported in the NPPF at paragraph 14 - where Councils are asked to provide sufficient flexibility to adapt to rapid change in meeting OAN.

The proposed approach to allocations and safeguarding land will also assist the Council in demonstrating that they have been both aspirational and realistic in progressing the Plan in accordance with paragraph 154 of the NPPF; with the slight overprovision allowing for any slippages in the delivery of the strategic sites within the District - which may be particularly helpful given the proximity of a number of allocations to the south of Warwick/Leamington Spa - and maximising the chance of a five year housing land supply being demonstrable over the Plan period.


Mod 7 - Para's 2.21 to 2.24

Further to our suggestion for the provision of appropriate flexibility in the Plan, we note the housing trajectory that sits behind Policy DS7, which depicts the timeline for the delivery of housing over the Plan period.

The trajectory is seeking a sharp increase, from circa 850 forecast completions in 2015/16 to a minimum of circa 1,400 dpa over the period 2017/18 - 2022/23.

Such an increase is considerable, and to maximise the chances of this being delivered then the Council will require as many deliverable sites as possible to come forward to help meet this need.

24707/A3/VL/RC/lfw 3 22nd April 2016




We would therefore be supportive of land being allocated at Old Budbrooke Road in Hampton Magna for housing development, which is capable of early delivery and would assist in meeting its OAHN.

Mod 9 - Para's 2.37 and 2.38

We have no specific comments to make, other than to agree with the justification for releasing sites from the Green Belt to meet the needs of the Housing Market Area.

Furthermore, we note that the NPPF requires at paragraph 47 for the needs of the HMA to be met, however, how this is distributed across the District is a matter of planning judgement for the Council taking account of a number of considerations. As an example, elsewhere in the HMA it can be seen that North Warwickshire has adopted a Sound Plan in accordance with the NPPF that includes within it 500 dwellings to meet the needs of Tamworth without any sites immediately adjacent to the urban area from which unmet needs are originating.


Consequently, we consider that paragraph 2.38 should be amended to simply state:
'In selecting sites on the edge of urban areas, non‐Green Belt sites are‐ favoured over Green Belt sites where possible. However, where there are no suitable non Green Belt alternatives to meet an identified need, sites are removed from the Green Belt to enable development to take place which will help to meet the needs of the Housing Market Area. This applies to land to meet the needs of Coventry, Leamington, Kenilworth, some of the villages and land on the edge of Lillington to assist in the regeneration of the area.' (added / deleted)

Mods 10 and 11 - Policy DS11 and Para's 2.41 to 2.53

We disagree with the proposed allocations made in Hampton Magna, as we consider that the land under the control of Taylor Wimpey at Old Budbrooke Road is superior and offers a more sustainable and logical extension to the settlement of Hampton Magna.

We have commented previously on the suitability of the Site to deliver residential dwellings and enclose a leaflet which demonstrates how the Site could sensible be delivered (Appendix 2), as well as technical notes updating the position in relation to ecology/archaeology/agriculture and highways/drainage at Appendix 4 and 5 respectively.

Given the above, we object to the Plan on the basis that this Site is not included within it, either instead of or alongside H27 and H51.

Indeed, we note that the update to the Landscape Sensitivity and Ecological & Geological Study (Landscape Assessment Update - 2014) upgraded the classification of part of Site H27 to a 'High-medium' landscape sensitivity to residential development as opposed to a 'High' sensitivity. We would however point out that there is no evidence or justification behind this alteration as the only focus was around land to the east of Hampton Magna under reference HM_05. Site H51 remains assessed as having 'High' landscape sensitivity.

In addition we would add that Taylor Wimpey's site is subject to 'High -medium' landscape sensitivity to residential development and the assessment set out that "...there is potential for a small amount [of development] between the existing settlement edge along Blandford Way/Arras Boulevard/Gould Road and Stanks Farm. However, this would need to include a substantial landscape buffer in order to strengthen the green corridor along the railway and prevent any physical or visual link to Warwick..." As can be seen in Appendix 2, we note are aware of the need to provide appropriate landscaping and have incorporated this in to the proposals for the Site from an early stage.

We therefore consider that the land in the control of Taylor Wimpey offers a suitable and preferable extension Hampton Magna.

24707/A3/VL/RC/lfw 4 22nd April 2016




Mod 16 - Para 2.81

As set out previously we consider that the site offers the opportunity for release of Green Belt to provide for additional sustainable housing growth throughout the Plan period.

In 2015, the Council undertook a review of the Joint Green Belt Study (Parcel WA2) which also includes the proposed allocations of Sites H27 and H51. The parcel scored 15/20 in this assessment.

However, the scale of the parcel did not allow for an accurate assessment of this Site and thus we have prepared our own Landscape and Visual Appraisal of the Site - which respects the boundaries of the Site. This is enclosed at Appendix 6 and summarises that the Site is "...well related to the existing housing area and benefit from robust boundaries, including Old Budbrooke Road, the railway line and the A46 Warwick Bypass... subject to the sensitive design, detailing and layout, development at the Site would not result in urban sprawl; nor represent an encroachment into the wider countryside; it would not impact on local heritage assets; nor would it materially contribute to the coalescence with the neighbouring settlement at Warwick. Accordingly, development could be accommodated without resulting in significant landscape and visual effects, or offending the objectives of Green Belt policy."


Mod 20 - Policy DS NEW 1 Directions for Growth South of Coventry

In relation to this Policy, we wish to support the Council in their approach to capping of the assumed delivery of the Westwood Heath and Kings Hill sites due to infrastructure and delivery rates respectively.

It is important in meeting the needs of the HMA that the Council are realistic in this regard in order to ensure that the Plan is effective and deliverable by 2029.

Given the timescales for adoption of the Plan and progressing a site of the scale of Kings Hill, 1,800 dwellings by 2029 should be considered aspirational - and in order to ensure that the Plan remains realistic, consider that no uplift to this figure is appropriate. Indeed, the Council should ensure that they are fully confident of the build rates suggested being delivered before progressing the Plan.


Conclusion

We trust that you will take these comments are helpful in progressing the Plan. Should you require any further information, do not hesitate to contact me as per the details on this letter.

Object

Proposed Modifications January 2016

Representation ID: 69249

Received: 22/04/2016

Respondent: CEG Steel/Pittaway

Agent: Nexus Planning

Legally compliant? No

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Council should allocate both H42 and S1 as a single strategic allocation, with a restriction on dwelling delivery in advance of the aforementioned highway interventions being delivered. It is considered that this is fully consistent with the NPPF and, as set out later in this submission, would provide a much more logical and robust framework for the comprehensive planning of the area.

Full text:

see attached

Attachments:

Object

Proposed Modifications January 2016

Representation ID: 69408

Received: 22/04/2016

Respondent: Old Milverton & Blackdown JPC

Agent: Hunter Page Planning

Legally compliant? Yes

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is the position of Old Milverton and Blackdown Joint Parish Council that the proposed strategic allocation at Old Milverton and the proposed safeguarded land will not meet the needs of Coventry and is not suitable for such purposes.

Full text:

See attached

Object

Proposed Modifications January 2016

Representation ID: 69492

Received: 21/04/2016

Respondent: Centaur Homes

Agent: McLoughlin Planning

Legally compliant? No

Sound? No

Duty to co-operate? Not specified

Representation Summary:

These modifications are unsound as they are inconsistent with national policy and not justified by the evidence base. As such, the allocation, as it is put forward within the modifications version of the Local Plan is not NPPF compliant.
Issues in particular around:
The Green Belt.
Landscape Impact.
Sustainability Appraisal.
More robust case for release of land on western side of village. Centaur site sits within natural depression and is visually contained. Not highly visible. Considered a suitable location for development on two grounds: partly brownfield and the contained nature of the site.

Full text:

1.0 Introduction
1.1. McLoughlin Planning are instructed by Centaur Homes to submit representations on the proposed modifications to the Warwick Local Plan 2011-2029. This document will take each relevant modification in turn and where necessary, refer to the Evidence Base, National Planning Policy Framework (NPPF), Planning Practice Guidance (PPG) and other material considerations.
1.2. By way of context, Centaur Homes has an interest in Land at Old Budbrooke Road, (also referred to as Maple Lodge or land north of) as shown on the enclosed site location plan and seek its allocation for residential development within the emerging Local Plan. These representations cover policies relevant to the allocated housing sites at Hampton Magna.
1.3. Centaur's site is adjacent to the settlement boundary on the western side of the village. Hampton Magna is identified within the Local Plan as a 'Growth Village' and suitable for development. It is ideally located to provide sustainable housing development in accordance with the Framework paragraph 55 and has excellent connectivity to Warwick and the wider area.
1.4. The Old Budbrooke site extends to 5.5 hectares in size. This consists of a mix of brownfield and greenfield land, with approximately 1.5 hectares of this being brownfield. The site already benefits from an access fronting onto Old Budbrooke Road and facing the existing village. the site is contained by the existing road network to the south, east and west, with mature field boundaries to the northern edge. The site sits within a valley that rises up to east and the village.
1.5. The existing uses on the site create a significant number of lorry movements and associated noise and disturbance. The allocation and redevelopment of the site will bring the land into a use that is more suitable to its village location.
2.0 Modifications 1 & 2, 4 & 5
2.1. Centaur Homes support the Council in meeting its Duty to Cooperate and the increase in housing need to accommodate the unmet need from outside of the District. However, this unmet need should not be separated out from the actual need for Warwick DC.
2.2. As acknowledged, the 2015 SHMA has a critical role to perform in helping the Council prepare a Local Plan, which is sound. However, it is noted that the SHMA covers a 20-year period, but the plan period is only 18 years. To allow for this, the Council has applied a pro-rata figure the to the plan period. Centaur's concern with this is that although the total need over the 20 year period is known, the breakdown of demand for housing during the period is not, it is not a constant perfect linear line, but dynamic.
2.3. Therefore, the Plan's target of 16,776 new dwellings is not justified and potentially could under deliver in the short term. Failure to provide the required level of housing will further compound supply problems as well as hinder economic growth and fail to address affordability concerns. This is further supported by the affordability of market housing data shown in table 46 in the SHMA, which identifies that Warwick District is less affordable, than the England average.
2.4. If the Council insist on using a figure different to that in the full OAN identified in the SHMA, This figure needs to be justified for the shorter period. It is also considered that in accordance with the need to "boost" housing supply that the housing target should be expressed as a minimum to provide for additional flexibility to make for any under-delivery on allocated site.
3.0 Modification 3
3.1. Centaur Homes supports the change to Policy DS4. This clarifies that allocations can occur to a wider range of settlements across the district.
4.0 Modifications 6 & 7
4.1. Following on from the Inspector having found the windfall figure as previously put forward unjustified, the Council have lowered the figure.
4.2. However according to the letter from the Council leader, Cllr Andrew Mobbs, to the Inspectorate dated 14th October 2015, work is still on going "regarding a justifiable level of windfalls" and the figure put forward is "just an estimate" and no further evidence has been provided within the proposed modifications to support this figure, even though it is lower than the previous allowance.
4.3. As a result, Centaur consider the Plan's approach towards windfalls to still be unsound as it is clearly contrary to national guidance and the fact that the Plan is supported by a robust SHLAA. Given the detail in the SHLAA, further housing allocations can be made to further reduce any risk of the housing target being met.
In addition, subject to other representations looking for the Plan's target to be
expressed as a minimum, it would provide the necessary flexibility for windfalls to come forward.
4.4. It is considered that the concerns about the windfall figure can be redressed (in part) through the allocation of additional land at Maple Lodge at Hampton Magna for housing development.
5.0 Modifications 8 & 9
5.1. Centaur Homes supports the revised distribution and the increase of dwellings to the Growth Villages. Such an approach is consistent with paragraph 55 of the Framework.
6.0 Modifications 10, 11, 16 and 19
6.1. Centaur Homes objects to these modifications on the basis that they are unsound as they are inconsistent with national policy and not justified by the evidence base.
6.2. Centaur Homes do not dispute the need for additional housing in Hampton Magna as reflected by earlier representations supporting the development of land on the western side of the village. However, these modifications underline the flawed approach the plan has made to development in the village in respect of:
* The Green Belt.
* Landscape Impact.
* Sustainability Appraisal.
6.3. Each is addressed in turn below.
The Green Belt
6.4. The green belt is the key issue relating to the modifications is that both sites are proposed to be removed from the green belt. In so doing, the additional release proposed and intensification of the allocated site, have to be justified by the evidence base.
6.5. In this respect, the modifications are flawed as there is no cross-reference to the appropriate evidence base to support the allocations. As per earlier representations, Centaur Homes is unconvinced about the Modifications put forward as Core Document CD V13 and makes a more robust case for the release of land on the western side of the village, rather than on the eastern side, where the two allocations are proposed.
6.6. Whilst it is unreferenced in the EiP Core Documents list, the 2015 Warwickshire Green Belt review does provide an analysis of the green belt around Hampton Magna in terms of parcels WA2 (where allocations H27 and H51 are sited) Old Budbrooke Road (HM2).
6.7. A general criticism of the approach by the 2015 document is that it is too broad brush, that the assessment parcels are too large, encompassing areas with different sensitivities to the green belt. This is especially the case with HM2, where the southern part of the parcel is not close to Warwick, unlike the northern part. In contrast, CD V13 does look to provide a more fine grain analysis of development areas.
6.8. In terms of allocation H27, the Modifications impose an arbitrary additional 30 dwellings on the site, with no evidence suggesting how this could be accommodated or what the associated impacts are.
6.9. In the case of H51, the concerns are more fundamental, in that the extent of the allocation does not account for the whole of the field in which the allocation sits. This is considered to be a serious misjudgement in terms of how a site should be allocated for housing development, when releasing it from the green belt and the need to make use of clearly defendable boundaries.
6.10. Making specific reference to the guidance in paragraph 80 of the Framework, the following analysis of the intensified H27 and newly allocated H51 is as follows:
Check unrestricted sprawl
6.11. Both allocations are identified in an area in CD V13 that are characterised as being very open. Therefore, their development will have an immediate impact on the green belt. In the case of H51, given the arbitrary extent of the allocation, not using the whole of the field in which it sits, its development would lack context and effectively sprawl.
Prevent neighbouring towns merging
6.12. Notwithstanding the presence of the Warwick bypass, this is a critical area of the green belt, where the gap between Warwick and Hampton Magna is as little as 1km (2015 GBR). Clearly the intensification of development on H27 and the development of H51 will clearly increase the perception of Hampton Magna and Warwick merging.
Safeguarding the Countryside from Encroachment
6.13. The key concern here is the openness of the allocated sites. Their development, topography and lack of a layered approach to multiple field boundaries means that development will clearly encroach into the green belt and be heavily reliant on the creation of new boundaries. Whilst the presence of sports pitches in assessment area WA2 are noted, their presence does not confer that housing development would be equally acceptable as sports pitches are appropriate development in the green belt, whereas housing is not.
Prevent the setting of historic towns
6.14. Core Document V13 makes reference to the inter-visibility of the area in which these sites sit an the Warwick conservation area. Especially as these sites have an elevated location overlooking Warwick.
Assist in urban regeneration
6.15. Clearly, given the scale of Warwick's housing challenge, there is a need to allocate additional greenfield sites.
Strong & defensible boundaries
6.16. Following on from the critical assessment of the Green Belt Assessment, and it having been undertaken at an appropriate scale, it is clear that the Council has not identified the allocations in accordance with the final bullet point of NPPF paragraph 85. This requires boundaries to use physical boundaries that are clearly recognisable and likely to be permanent.
6.17. With allocation H51, the allocation boundary does not follow any existing boundaries at all. It sits within an asymmetric shape field and the allocation cuts off the bottom and eastern sections of the field. This will leave areas of land that are not connected to the neighbouring field and may lead to further hedgerow loss as they are incorporated into the neighbouring fields having a very significant landscape impact and making the developments even more visible from the long distance views of the site from the south and east.
6.18. For both allocations the likelihood of the permanence of the boundaries should be questioned. Apart from H51 having no boundaries at all, allocation H27 is only contained by field boundaries on its two longest sides, these are generally considered to be weak and are easily broken through, especially as they are not particularly dense, deep or contain a significant number of mature trees. The location of a public right of way along the southern boundary does not add any weight to the boundary as this could be incorporated within a development.
6.19. As such, the allocation, as it is put forward within the modifications version of the Local Plan is not NPPF compliant.
Landscape Capacity Study/ Assessment Concerns
6.20. The second area of concern with the Modifications is the compatibility of the Modifications with the landscape evidence which underpins the Plan.
6.21. The main Landscape Sensitivity and Ecological & Geological Study dated November 2013 considered the sensitivity of all sites around Hampton Magna. This located Land South of Arras Boulevard (site H27) within land parcels HM_05 and HM_06 and Land South of Lloyd Close within land parcel HM_07.
6.22. Regarding land parcel HM05, the study focus on land to the east of the village, down to the A46, however, it does state that new development should not extend beyond the current settlement edge to the east, or to the south of public right of way WB12.
This public right of way links into public right of way W84, this is not mentioned in the commentary on land parcel HM_05. This study acknowledges that there is: "some potential for a very small amount of development in this zone providing that views towards Warwick from the existing settlement are preserved."
6.23. Based on this evidence document, how can the intensification of allocation H27 comply with this Landscape Sensitivity Assessment? Any development of allocation H27 will restrict existing (public) views from the settlement towards Warwick, as these are currently open and far reaching. Therefore it is not possible for these to be preserved as new development will break up the view and sight lines, especially the current open view from Arras Boulevard and the intensification of development on the site will further compound this loss.
6.24. The commentary on land parcel HM_06 provides further evidence against the intensification and development of the whole, again it notes that there is some scope for "limited development adjacent to the existing settlement edge" and the graphic provided within the Landscape Sensitivity Assessment acknowledges that this should be limited to the northern half of the eastern field. Any intensification of this allocation will significantly alter the key views within land parcel HM_06, the evidence document notes that existing mature trees break up the "hard edge" of the settlement to some extent and a significant landscape buffer will be required to mitigate any development of this site and to maintain the existing relationship between urban and rural that will greatly impact on the density of development across the main site and therefore, further compound the problem.
6.25. The Landscape Sensitivity Assessment for Allocation H51 again acknowledges the scope for some small scale development and the graphic within the assessment suggests that this should be within the extremities of the existing development and bot push the settlement boundary further into the rural landscape. Public views from the existing settlement boundary are far reaching and it is possible to see Warwick from this point. The site is on the high point in a rolling landscape and therefore, it would be highly visible from a significant number of viewpoints including the surrounding public rights of way and Warwick to the east.
6.26. Centaur are concerned that the Landscape Assessment's conclusions that H51 could accommodate "small scale development" does not reflect the level of development which is proposed in the allocation (115 units). The allocation covers an area of land measuring some 5.5 ha, in a open field parcel measuring 10ha in size. With this latter point, the size of the 10ha field parcel could be more than able to accommodate the whole of the housing allocation for Hampton Manga without the need for allocation H27. This fact underlines, the difficulty associated with the allocations made by the Plan in the village and why both allocations are considered unsound.
6.27. In contrast, the Centaur site sits within a natural depression and is visually contained, unlike the land to the south of the village (allocations H51 and H27), although the site sites within a green landscape, it does not benefit from the rolling landscape views that make it highly visible. Therefore, it should be considered a suitable location for development on two grounds. The first being partly brownfield and therefore the allocation of this site would see it redeveloped and save a greenfield site from being lost. The second is the contained nature of the site makes it more suitable in landscape terms then the allocations being put forward within these modifications.
Sustainability Appraisal
6.28. An addendum SA has been provided with the modifications to the Local Plan. There is very little content within this addendum regarding the allocated sites beyond the content within the original Submission Local Plan SA Report February 2015. Within the 2015 SA, allocation H51 was rejected based on it having "some connectivity to the main settlement but potentially significant impact on nearby residents and little regenerative impact"
6.29. There is no justification provided within the modifications documents to justify how these sustainability concerns have been overcome.
6.30. Within the justification for the intensification of H27, the SA addendum states that the site has a medium to high landscape value, but that the intensification will save the loss of greenfield land elsewhere and that mitigation can overcome any significant effects. There is no justification for how any significant effects might be overcome, especially against biodiversity, or what the mitigation might be.
6.31. Referring to the 2015 SA, the reason for the Old Budbrooke Road site being rejected was: "located within a parcel of high landscape value - disconnected from the main village and its core services / facilities."
6.32. As highlighted above, the landscape assessment for the site is flawed as it has not considered the site itself, but combined it with a land parcel and the analysis of this has focused on the land to the north of the village. Therefore, the evidence base does not find the site itself as of high landscape value, in fact the evidence base is silent when regarding this site.
6.33. As for the site being disconnected from the main village, this analysis has not taken into account the wording within Appendix Vi of the SA. This clearly states: "With regard to travel and transport, the potential allocations have excellent access to public transport with a bus stop within 0 - 400 m and there are pavements which provide safe access for pedestrians into the village centre or to public transport"
6.34. It continues to note the distances for some of the sites from Warwick Parkway, namely the sites within 1km. it should be noted that the shortest walking distance from the represented site to Warwick Parkway is 1.2km, whilst for allocation H51 this distance is 1.4km. Likewise to the local shops and primary school both sites are equidistant.
Material Considerations : The Brownfield Register
6.35. It should also be highlighted that the modifications to the Local Plan does not appear to have considered the requirements of the emerging Planning and Housing Bill currently progressing through Government. This will require all authorities to maintain a register of brownfield sites that it considers suitable for housing development. As such, it is possible that the brownfield element of the represent site may come forward through this process anyway. However, if the Council were to allocate the whole of the Old Budbrooke Road site it could create a more suitable form of development that could to be comprehensively planned as one whilst delivering a level of housing suitable to the settlement.
Summary
6.36. Therefore, the Plan's evidence base clearly continues to contradict the allocations made in the plan.
6.37. In conjunction with previous representations, whilst Centaur seek the de-allocation of H51 in preference to its site, it also objects to the intensification of development on H27 and seeks this modification to be deleted.

Object

Proposed Modifications January 2016

Representation ID: 69688

Received: 22/04/2016

Respondent: Gleeson Developments

Agent: Savills (L&P) Ltd

Legally compliant? Yes

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Paragraph 2.52 should be amended to include land at Southcrest Farm and the requirements for educational uses in accordance with the above comments. Reference to Southcrest Farm in relation to secondary school provision should be deleted.

Full text:

See attached

Support

Proposed Modifications January 2016

Representation ID: 69753

Received: 22/04/2016

Respondent: Catesby Estate Ltd & H E Johnson

Agent: Catesby Property Group

Representation Summary:

Increased justification for residential allocation of land at Red House Farm - support modifications 10, 11 and 16 to policies DS11 and DS19, which in combination propose the removal of the land at Red House Farm from the green belt for the development of 250 dwellings to meet identified needs and support regeneration in Lillington (previous site reference H04).

Full text:

See attached

Object

Proposed Modifications January 2016

Representation ID: 69831

Received: 22/04/2016

Respondent: Bishop's Tachbrook Parish Council

Legally compliant? No

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Correct 147 dwellings to 143
2.46 Omit in the light of our representations in Mod 10.
2.49 Revise in the light of our representations in Mod 10.

Full text:

See attached

Attachments:

Object

Proposed Modifications January 2016

Representation ID: 69850

Received: 22/04/2016

Respondent: Mrs J Mackenzie

Legally compliant? No

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Allocations contrary to NPPF requirement to maintain separation, prevent coalescence
Numbers based on Coventry requirements not approved in local plan, revised before 2017?
No critical examination of claims that land unavailable -areas of Coventry green belt could be developed with less impact
Provision of land to meet Coventry's overspill contrary to NPPF - require sub-regional SA to be valid
How do proposals fit with neighbouring development
No consultation undertaken with parish councils before decisions made
MoU providing additional housing for Combined Authority circumvents democratic process, NPPF
Impact of proposals at Thickthorn and Kings Hill next to over-capacity A46 not considered

Full text:

See attached

Attachments:

Object

Proposed Modifications January 2016

Representation ID: 69927

Received: 20/04/2016

Respondent: Mr & Mrs Jarrett

Agent: McLoughlin Planning

Legally compliant? No

Sound? No

Duty to co-operate? Not specified

Representation Summary:

OMISSION site:
Land at the Valley should be allocated for housing development for up to 40 units
Site is deliverable and available for development
Provides an opportunity to reduce uncertainty around windfalls
Site is accessible
Site is of low ecological value / flood risk
Infill site surrounded on three sides by development

Full text:

see attached

Object

Proposed Modifications January 2016

Representation ID: 69970

Received: 22/04/2016

Respondent: Sharba Homes

Agent: Barton Willmore

Legally compliant? No

Sound? No

Duty to co-operate? Not specified

Representation Summary:

RADFORD SEMELE
OMISSION site: -
- Site south of Offchurch Lane could be sufficiently allocated as part of a more comprehensive allocation in conjunction with Site H38.
- subject to current (May 2016) planning application for up to 150 dwellings
- reason for non-allocation was concern over capacity of village school by County Council - no objection raised by County council to planning application subject to s106
- incorrect to say that there are no suitable sites outside of the Green Belt

Full text:

See attached

Object

Proposed Modifications January 2016

Representation ID: 69984

Received: 22/04/2016

Respondent: The Kler Group

Agent: Barton Willmore

Legally compliant? Yes

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The site at the Peeping Tom Public House, Burton Green is available, and suitable to provide additional housing in Burton Green. The village is affected by HS2. One of the consequences of this is that the allocated site at Burrow Hill Nursery is unlikely to come forward before HS2 is complete. The plan therefore provides no flexibility for the delivery of housing in the village. Further, the Plan does not take account the loss and abandonment of homes as a result of HS2 is we have estimated at around 55 dwellings or 20.91% of the housing stock in the village. Further land therefore needs to be allocated. The site at Cromwell Lane would be a suitable Green Belt release and is isolated from HS2. Evidence has previously been submitted - centrally located, close to public transport and employment opportunities. Vehicular access can be achieved and work has been undertaken to demonstrate landscape and visual impacts are acceptable. Further the site can delivered in 5 years. A similar site to the north is proposed for allocation in Coventry's Local Plan.

Full text:

See attached

Support

Proposed Modifications January 2016

Representation ID: 70019

Received: 22/04/2016

Respondent: Place Partnership Limited (PPL)

Agent: Bilfinger GVA

Representation Summary:

This representation supports the proposed modifications to Paragraphs 2.41 to 2.51, as shown in Appendix B of the schedule of modifications, in particular in respect of paragraph 2.42, which provides an Explanation for Policy DS11, and paragraph 2.56 on Village Allocations

Support the proposed deletion of wording in the Publication Draft Local Plan, which prescribed that sites of over 50 dwellings should be delivered in phases. This would delay the delivery of housing

Full text:

see attached

Attachments:

Object

Proposed Modifications January 2016

Representation ID: 70042

Received: 22/04/2016

Respondent: Taylor Wimpey

Agent: Barton Willmore

Legally compliant? Yes

Sound? Yes

Duty to co-operate? Not specified

Representation Summary:

fers a sustainable and logical extension to the settlement of Hatton Park.
However, there is a strip of land to the east of the proposed allocation which is within the control of Taylor Wimpey adjacent to Ugly Bridge Road. In our view, extending the allocated area to cover the entirety of the land in Taylor Wimpey's control would form a more logical extension to Hatton Park. Moreover, the omission of this strip of land will render it redundant from any viable continued use as an agricultural landholding. Should the Council be seeking to enhance landscaping on the eastern edge of the proposed residential development, then we consider that this would be better achieved by including the land within the allocated area.

Full text:

see attached

Object

Proposed Modifications January 2016

Representation ID: 70045

Received: 31/03/2016

Respondent: The Campbell Partnership

Agent: Hancock Town Planning

Legally compliant? Yes

Sound? No

Duty to co-operate? Not specified

Representation Summary:

OMISSION site
release of green belt sites at Milverton is not justified when land at Goggbridge Lane is available for residential development.
Ideal of residential development - lies directly opposite existing housing, on a residential estate road unsuitable for commercial traffic. Site unsuitable for Class B2/B89 employment land but well-related to residential community.
Refer to recent approval for residential development at Opus 40 employment site (ref: W/15/0646 for 85 dwellings) where it was accepted that noise mitigation could be achieved despite proximity of A46 - similar could be achieved here.

Full text:

See attached

Object

Proposed Modifications January 2016

Representation ID: 70048

Received: 06/04/2016

Respondent: Brian & Matt Lewis & Smith

Agent: Stansgate Planning

Legally compliant? Yes

Sound? No

Duty to co-operate? Not specified

Representation Summary:

OMISSION site: -
- Site adjacent to The Asps not included
- inclusion would provide road frontage as logical, definable boundary.
- inclusion would enable demolition of modern farm buildings on site and redevelopment with buildings more appropriate to setting of listed buildings
- site can be served by improved access from Banbury Road
- could be brought forward early
- informal advice from WDC was that a small scale scheme might be acceptable
- traditional farm buildings appropriate for conversion to 3 or 4 dwellings. Site area of c4ha, estimated gross capacity of c20-25 dwellings.

Full text:

See attached

Support

Proposed Modifications January 2016

Representation ID: 70064

Received: 21/04/2016

Respondent: Warwickshire Police and West Mercia Police

Agent: Place Partnership Limited (PPL)

Representation Summary:

Warwickshire Police (WP) and West Mercia Police (WMP) are pleased to see a reference under paragraph 2.55 to the need for emergency services infrastructure at Kings Hill.
In common with similar major developments granted planning permission in Warwick District by the Council
and the Secretary of State recently (see spreadsheet enclosed in attachments Appendix 1), the police infrastructure required to support sustainable development at Kings Hill will need to include:
* Equipping of officers and staff
* Police vehicles
* Premises
Based on the information available to us, WP and WMP envisage that the policing of the development would
be delivered by the Kenilworth Safer Neighbourhood Team (SNT), operating from an on-site police office
within the Kings Hill scheme.

Full text:

See attached

Object

Proposed Modifications January 2016

Representation ID: 70080

Received: 22/04/2016

Respondent: Warwickshire County Council [Archaeological Information and Advice]

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

There are inconsistencies with regard to schools provision throughout the plan . Kings Hill should reference a secondary school and primary schools as required - see suggested alts as required below.

Full text:

The Proposed Modifications of the new Warwick Local Plan will provide for increased new housing in order to meet an identified unmet need in Coventry.

The new Local Plan will now provide for 17,577 homes between 2011 and 2029. The District Council's approach to identifying land for housing as set out in the Spatial Strategy and SHLAA work is supported and these additional comments relate to the proposed modifications.

The County Council has had extensive involvement in assessment of new Local Plan and transport impacts and identification of transport infrastructure mitigation requirements through the life development of the Plan. We assume that the Draft Infrastructure Plan will be modified to reflect these changes

Transport matters

The transport evidence base developed by the County to support the WDC Local Plan comprises a series of Strategic Transport Assessments (STA) and accompanying technical notes. The latest phase of this work, based on the Local Plan Modifications, forms the basis for this consultation response. The most recent STA was submitted to Warwick District Council on 3rd March 2016.

On the basis of the STA work and additional analysis to assess modifications to the allocation options, we would support the inclusion of the proposed modifications to the allocations in principle.

In response to the Inspectors comments, the Duty to Co-operate and Secretary of State appeal decisions, the modifications identify a need to accommodate substantially more housing within the District. The changes to planned housing allocations (12,860 increasing to 17,577 dwellings) will have an impact on the transport network and mitigation requirements. The following sections provide an overview of the transport work by area.

South Warwick and Leamington
Approximately 6,000 houses are now proposed to be allocated in south Warwick and Leamington. The addition of 1,350 houses to be delivered at the Asps and Gallows Hill Development sites has focussed further development in this area.

The STA results reveal that a number of corridor/area strategies are required to mitigate the impacts of development, these are summarised in the latest revision of the STA. A key focus of these strategies is the A452 Europa Way corridor area, where significant infrastructure requirements are required including the upgrade to a dual carriageway. The modification to the allocations in this area has also triggered the need for further improvements on Gallows Hill.

In the majority of instances the scheme proposals lie within one or more of the areas identified within the Transport Corridor Strategy which is documented within the draft IDP. It is recommended that the new and revised schemes are incorporated within the Transport Corridor Strategy document at an appropriate time and should align with the Warwick and Leamington Spa Transport Strategy which focuses on how targeted sustainable transport measures, when incorporated within the corridor strategies, can reduce the impact of travel on the network. The STA notes that, post adoption of the Plan, further detailed work to enable a more thorough strategy to be determined which maximises opportunities for sustainable transport measures and reduced car based trips across all corridors and town centres will be required.

It is considered pertinent to highlight the critical role, of strategic and local importance that the A46 and M40 play in accommodating traffic flows. Further investigation of scheme proposals along both the A46 and the M40 will be critical to ensuring the overall resilience of the transport network is maintained. The latest STA section 4.53 notes that "There could, justification for seeking to improve the operational capacity of the SRN in Warwick and Stratford districts sooner than the modelling indicates, on the basis that the current modelling does not account for events such as incidents and other operational issues that occur outside of the issues induced by general traffic growth".

Sites East of Kenilworth
Local Plan modifications include additional housing allocations east of Kenilworth equating to 740 dwellings, this is approximately 50% increase in the housing allocation for the town.

The addition of these sites, combined with the cumulative impact of proposed allocations and proposed modifications, triggers the need for additional mitigation in the area.

Improvements at A452/A46 Thickthorn Roundabout and associated dualling to A452 Bericote roundabout will now become an essential element of the mitigation strategy and the IDP should be updated to reflect this. Additional mitigation is also identified within the town.

Sites at Kings Hill and Westwood Heath
Modifications to the Plan include development at Kings Hill (1,800 dwellings) and Westwood Heath (425 dwellings), south of Coventry. Analysis of the impact of development of this scale, in this location, has been considered within the latest STA. Previous STAs did not cover this area, as such alternative methodologies had to be adopted to analyse the impact of development.

The STA revealed that a cap should be placed on development at Westwood Heath of approximately 425 dwellings, based on link capacity assessments on Gibbet Hill and Crackley Lane. If a wider mitigation strategy which improves links to the A46 is identified, the cap on development in this area can be reconsidered.

In addition to the allocated housing at Westwood Heath it is also understood that there are emerging plans for the University of Warwick and Westwood Business Park to grow whilst other employment sites may also come forward within the area. The area has also been identified in the Coventry Local Plan highlighting the existing constraints posed by the A45, particularly in the area of the Kenilworth Road junction.

The impact of 1,800 dwellings at Kings Hill, and the cumulative impact of Local Plan growth and general traffic growth trigger the need for a major junction improvement at A46/Stoneleigh Rd and Stoneleigh Rd/Dalehouse Lane.

It is recommended that the junction proposals for the Stoneleigh Road/A46 junction be seen as the starting point for delivering a wider strategy for improving connectivity between the A46, North Kenilworth, Warwick University and the Tile Hill/Westwood Heath housing areas south of Coventry. This could be in the form of capacity enhancements applied to the existing road network or, alternatively and longer term, provision of additional capacity in the form of a new link road which can connect some or all of the areas identified earlier.

It should be noted that the STA has established a need for a number of new mitigation strategies and has altered mitigation previously identified; these changes should now be reflected in an update to the IDP. Additionally, in some cases the status of the requirement for these schemes has altered to "essential" as a result of the increase in demands on the network.

The STA work does not identify, at this stage, smaller, localised impacts that are not identifiable either due to the strategic focus of the work to date or the coverage of the models. These impacts and the site specific mitigation details will be agreed at application stage or through the development of the strategic schemes by WCC and funded through pooled S106 contributions and CIL.

For further details on the highway impact and mitigation strategies associated with the Local Plan, reference should be made to the transport evidence base located at http://www.warwickdc.gov.uk/info/20416/evidence_base and the latest STA submission.

The County Councils Sustainable transport policies are contained in the Warwickshire Local Transport Plan (https://apps.warwickshire.gov.uk/api/documents/WCCC-630-116).

Education provision and growth

We refer to our recent discussions about provision for schools and we request that the following changes to be made. For ease these suggested changes are highlighted in blue.

Amend Policy DS12 to read:

DS12 Allocation of Land for Education
Planning Policy DS12 Allocation of Land for Education

Land at Southcrest Farm, Kenilworth (ED2) and land at Myton (ED1), as shown on
the Policies Map, is allocated for educational uses and other compatible uses (see
policy HS5). This includes, on each site, the provision of a secondary school, 6th form
centre and, if deemed the most appropriate location, a primary school.
In the case of Southcrest Farm the whole area of the site is unlikely to be required
for educational purposes. Any land within this site that is surplus to the educational
requirement is therefore allocated for housing (see Policy DS11)

Amend para 2.56 Kenilworth Secondary School and 6th Form: the existing school sites are allocated for housing within Policy DS11. The school is seeking to locate all its facilities onto a single site. Further, the additional housing proposed in the Kenilworth priority area means that the town needs additional school places. If the current secondary school is to continue to offer the educational choice it currently provides and providing the educational needs of the Town and surrounding area. For these reasons, a new site for a secondary
school in Kenilworth is preferred. In addition, the additional housing allocated in the Kenilworth area requires the provision of a new primary school. Over and above the educational land requirement, the site has capacity for housing, as set out in Policy DS11. The land at Southcrest Farm, as shown on the Policies Map, is therefore allocated primarily for educational purposes and other compatible uses as defined by policy HS5, and for housing where there is surplus land over and above the educational requirement.



Amend para 2.56 as to follows:

2.56 Kenilworth Secondary School and 6th Form: Kenilworth School is not capable of being expanded on its current sites to meet the likely demand for school places generated by additional housing within the Kenilworth area. The school is therefore seeking to relocate all of its facilities on to a single new site.

A new site for secondary school provision in Kenilworth Town is therefore preferred

Land at Southcrest Farm (ED2), as shown on the Policies Map, has been allocated (DS12) primarily for educational purposes and other compatible uses as defined by policy HS5 and for housing where there is surplus land over and above the educational requirement.

The existing Kenilworth school sites are allocated for housing within Policy DS11.

In addition, new primary Schools will be required to meet demand in the Kenilworth area.


(Explanation: the school cannot be expanded to meet demand; the school must relocate if the demand is to be met; the plan anticipates the relocation of the school by allocating the existing school sites for housing; Southcrest Farm is allocated for secondary school provision in policy DS12; any surplus land at Southcrest farm will be available for housing)

There are some inconsistent descriptions and references to schools provision and we ask you to make these changes for clarification. The Inconsistencies are noted below and we would ask that you amend these paragraphs to include provision of a new secondary school and primary schools to serve the development.

Policy DS15 (p 9 &10)
Land at Kings Hill Potential for some employment land; potentially land for secondary school provision; new primary schools (plural) local centre and community facilities; health centre; new rail station (no secondary school)

Mod 21 (p 22)

New para 1.8 At Kings Hill an area of c269ha has been identified for a residential‐led,
mixed‐use development (see Policy map). The site has an overall capacity of c. 4,000 dwellings, with c. 1,800 dwellings being deliverable by the end of the current plan period. The mixed use development will also include the potential to provide employment land. Land will need to be provided for open space, leisure and amenity uses and will form part of a green infrastructure network linking to the wider countryside and north to the conurbation. A local centre will be provided at an appropriate scale, incorporating a range of local community facilities and services including meeting space / community buildings, emergency services infrastructure, youth facilities / play areas and local retail provision for convenience shopping. A new primary school (singular) will be required to serve the development, which may need to be expanded as the site develops over time. (no reference to a secondary school stated)

P33 refers
H43 Kings Hill Lane** 1800
(Total capacity up to 4000 with the balance to come forward beyond the end of the plan period). Potential for some employment land; potentially land for secondary school provision; (not in previous paragraphs) new primary schools; (plural) local centre and community facilities; health centre; new rail station

Greenfield sites para 2.55 p37 refers

2.55 At Kings Hill an area of 269ha has been identified for a residential‐led, mixed‐use development. The site has an overall capacity of c. 4,000 dwellings, with c. 1,800 dwellings being deliverable by the end of the current plan period. The mixed use development will also deliver opportunities for employment provision. Land will be made available for open space, leisure and amenity uses and a green infrastructure network will link to the wider countryside and north to the conurbation. A local centre will be provided at an appropriate scale, incorporating a range of local community facilities and services including meeting space / community buildings, emergency services infrastructure, youth facilities / play areas and local retail provision for convenience shopping. A new primary school (singular) Will be required to serve the development, which may need to be expanded as the site develops over time. (no reference to secondary school stated)

We request that any reference to schools should also identify the need for land for an additional secondary school and primary schools.

We will continue to work with you to the progress of the new Local Plan and should you wish to discuss any of the above matters further please contact

Object

Proposed Modifications January 2016

Representation ID: 70099

Received: 21/04/2016

Respondent: The Burman Family

Agent: Nigel Gough Associates Ltd

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Agree in principle with allocation of H28 for c120 dwellings.
Object to retention of strip of green belt land along eastern and northern edges of site.
No logical or defensible boundary as required by NPPF.
Should use field boundary.
No benefit in farming terms for keeping strips of land.
No justification in maintaining a landscape strip / buffer

Full text:

See attached

Object

Proposed Modifications January 2016

Representation ID: 70139

Received: 22/04/2016

Respondent: Taylor Wimpey

Agent: Barton Willmore

Legally compliant? No

Sound? No

Duty to co-operate? Not specified

Representation Summary:

OLD MILVERTON
We agree in principle with the proposed allocation of Site H44 for residential development. However, given it offers a sustainable and logical extension to the north of Leamington Spa we consider that a larger allocation could be delivered on the proposed safeguarded area of the Site within the Plan period - with the whole Site being under the control of Taylor Wimpey.

Full text:

see attached

Object

Proposed Modifications January 2016

Representation ID: 70162

Received: 22/04/2016

Respondent: Commercial Estates Group

Agent: Nexus Planning

Legally compliant? No

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Support allocation of Westwood Heath.
No compelling policy justification for identifying H42 in preference to S1 and indeed there is an acknowledgement from the Council that residential development can be accommodated on S1 without any adverse impact on amenity.
Important to secure delivery of community infrastructure in early phases of development to ensure sustainable development patterns can be established and new residents get access to facilities quickly.
First phase of residential development should be planned and delivered in a way that would facilitate delivery of "Community Hub".
Seeking combined H42 / S1 allocation that could be comprehensively planned and phased.

Full text:

See attached

Object

Proposed Modifications January 2016

Representation ID: 70227

Received: 22/04/2016

Respondent: Mr. Michael James Edwards

Legally compliant? No

Sound? No

Duty to co-operate? Not specified

Representation Summary:

object to proposal: -
- no exceptional circumstances justify green belt allocation
- other more suitable green belt sites available
- should explore compulsory purchase orders
- more suitable areas available closer to Coventry
- should look at Bubbenhall as more suitable location
- site at Hampton Road (43 acres) was available for sale at time of SHLAA - was not considered

Full text:

See attached

Attachments: