Hatton Park

Showing comments and forms 31 to 56 of 56

Support

Revised Development Strategy

Representation ID: 55413

Received: 29/07/2013

Respondent: Burman Brothers

Agent: CPBigwood Ltd

Representation Summary:

Previously commented on emerging Local Plan seeking the release of land at Hatton Park for market housing and related uses. In particular have sought the early release of 3 parcels of land (site reference R38, fronting Birmingham Road, Hatton (about 7.5 hectares))

Acknowledge that the settlement of Hatton Park has previously had substantial housing development in the late 1990s / early 2000s and that housing development has
now been established for over 10 years. The settlement is now established and thriving in its present form.

Future extensions of Hatton Park, as envisaged through the RDS will be expected to blend and bond in with the existing development in planning and environmental
terms.

All three proposed parcels of land are sustainable in form and extent given the large settlement of Hatton Park albeit that it has been categorized as a Secondary Service village, [it is] essentially a Category 2 village.

The parcels meet the criteria of suitability, availability and achievability / deliverability and is suitable for release for housing:

* they adjoin an existing category "Category 2"village

* owners are committed to the early release of all three parcels subject to planning permission.

* all are achievable / deliverable, there being no unforeseen environmental or service constraints.

* confirm that all parcels of land can be accessed off the existing road system including off the Birmingham Road for the main parcel of land.

Affordable housing at the right and appropriate level can be provided on these parcels of land.

In terms of Clients main parcel of land, could accommodate additional development for the benefit of the District as a whole [in form of ] a Continuing Care Retirement -Community (CCRC) incorporating a nursing home and specialist new housing to Lifetime Care -Standards in the form of bungalows, semi-bungalows and some apartments. (subject to market conditions at time of allocation for this specialist use)

This is supported by the District's demographics for the Plan period showing an ageing population, in a very substantial increase in the very elderly age -

A small CCRC would support the existing village of Hatton Park, as well as -meeting the ageing population requirements both for this village and the surrounding -area.

In addition it would complement the existing range of housing with -accommodation for the elderly and those in need of care.

The other two smaller parcels of land owned by Clients could be -considered for release without compromise later in the Plan period for a range of market -and Affordable dwellings appropriate at that time.

Full text:

see attached

Object

Revised Development Strategy

Representation ID: 56232

Received: 25/07/2013

Respondent: Mr. A. Burrows

Representation Summary:

Objects to proposals to develop housing at Hatton Park on following grounds:
* Not in keeping with the heritage site of Hatton locks and canal. This site is an important tourist and historic site. Housing development adjacent to the canal would be seriously detrimental.
* Ferncumbe School at Hatton is already full and oversubscribed;
* The A4177 is already gridlocked at peak times. There is hard evidence of traffic accidents on the A4177 noted in Hatton Parish Plan.

* Urban sprawl is significant in the proposals, and there is now an even greater need to preserve the existing level of Green Belt land.

Full text:

I strongly believe that the assumptions about housing need for the district are still flawed.
I support the concerns raised by Ray Bullen of Bishops Tachbrook and which are supported by many of the Parish Councils. I urge the Council to take full heed of this work and to revise proposals accordingly, and significantly reduce the proposed number of new houses.

Proposals for new infrastructure are simply not adequate for the level of development being suggested.
However, the correct level of infrastructure development would totally damage the district and ruin the historic market town of Warwick and the rural communities and countryside.
Ferncumbe School at Hatton is full and oversubscribed, yet the proposals are for further housing development around Hatton !
The A4177 is already gridlocked at peak times yet the proposals will generate further traffic!
It is understood that air quality in the district is already failing EC health limits and it is unacceptable to advance plans that will make this situation worse.
There is hard evidence of traffic accidents on the A4177 noted in Hatton Parish Plan.

Proposals to develop housing at Hatton Park are simply not in keeping with the heritage site of Hatton locks and canal. This site is an important tourist and historic site and all steps should be taken to prevent any adverse impact on or around this site. Housing development adjacent to the canal would be seriously detrimental.
The same argument would also apply to the siting of a traveller site anywhere in the environs of Hatton Locks or canal. Such a site could lead to anti social behaviour and security issues for boaters, walkers and cyclists using the canal and towpath. The District Council objected to the wood business at Oaklands Farm on the grounds of adverse visual amenity. It would now be perverse to consider a traveller site at the same location.

The Green Belt is as important now, if not more so, than when it was first introduced.
Urban sprawl is significant in the proposals, and there is now an even greater need to preserve the existing level of Green Belt land.

There is wide opposition to the Development Plan and I understand that the local MP's have raised serious concerns.
The Governments requirement for Localism seems to have been ignored, with this plan having little or no regard for the views and needs of local communities.

Object

Revised Development Strategy

Representation ID: 56339

Received: 29/07/2013

Respondent: Stagecoach

Representation Summary:

A larger housing allocation in this area would offer a larger population and a wider socio-economic mix that would be much better able to support the ongoing commercial operation of a bus service in this location, and one that is less circuitous than the present route, which given existing levels of patronage, requires Local Authority financial support. The current design of internal roads makes the existing development difficult for bus services to penetrate, owing to the detailed design of traffic calming features. Any traffic calming measures must allow low floor bus access.

Full text:

Thank you for the opportunity of commenting on the Warwick Local Plan Revised Development Strategy.
Midland Red (South) Ltd trading as Stagecoach Midlands, is the leading commercial bus operator in Warwickshire. The company operates the vast majority of bus services in Warwick District, including Leamington Spa and Whitnash, where we operate a comprehensive network designed to offer both convenient local trips, but at least as important, services offering residents effective choices for longer journeys. The great majority of these routes are commercial, fully funded by our passengers
We also operate services supported by Warwickshire County Council, won following tenders for best value. We always strive through disciplined reliable operation, quality customer service and on-board experience, and effective marketing, to build revenue on such services as far as possible with a view to taking them on without public funding at a future date, where possible. These services to a great extent follow timetables and routes specified by WCC, as socially necessary services, where patronage today could not support a commercial operation by us or another bus company.
Stagecoach in particular has a national, independently assessed reputation for delivering among the highest levels of customer satisfaction. As well as offering reliable convenient services we are constantly investing both in existing services and our operational bus fleet, and developing new products and services aimed explicitly at providing greener smarter travel choices to the public, and especially those who do not yet regularly travel by bus.
Stagecoach proactively seeks to identify and pursue business development opportunities, and the company recognises the role it plays in delivering sustainable development. We welcome the opportunity to comment on, and help shape development proposals to the advantage of the community and the wider travelling public.
High-quality bus services are one of the most credible means of preventing car dependency, mitigating local highways impacts as far as possible, and achieving sustainable development. This includes not only environmental but also socio-economic goals.
We submit that there is a clear alignment of interests between stakeholders in the planning system, and ourselves and other commercial bus operators.
Strategic Vision
Stagecoach Midlands therefore wishes to generally support Warwick District Council's Strategic Vision, which is essential in setting the basis on which sustainable development can be realised, but has strong reservations about certain of the measures proposed, which we do not believe will deliver the vision. As this Vision is taken forward through robust policy-led prioritisation of actions, Stagecoach Midlands will be much better able to support the LPAs objectives while achieving our strategic goal to provide further high-quality greener smarter travel choices to the District's residents and visitors.
The National Planning Policy Framework (NPPF) makes clear in paragraph 7 that the "golden thread" of Sustainable Development that runs through it, includes economic, social and environmental goals. Stagecoach Midlands recognises not just its general responsibilities as a good corporate citizen, but the particular key role our business plays in securing these objectives at a local level.
Every day, Stagecoach buses:
* connect customers to markets and employees to businesses. Stagecoach Midlands itself is a locally-significant employer and customer of UK businesses
* connect people of all socio-economic groups to school, college, further and higher education; and of course to leisure and recreation opportunities
Our operations achieve all of this in a way that reduces congestion, and emissions. DECC statistics demonstrate that in the UK, personal transport use generates as many greenhouse gas emissions as the entire residential dwelling stock.
Not only do we reduce personal travel carbon footprints radically, but we are making strenuous efforts to reduce the carbon intensity of our own operations. Stagecoach Group announced in January 2013 that it has cut the carbon impact of its businesses in the UK and North America by more than 20% in the past four years. The transport group's absolute annual carbon footprint is now nearly 56,400 tonnes of CO2e lower than in 2007-08. The annual carbon saving is equivalent to the CO2e produced by powering nearly 11,000 homes for a year. Measured by carbon intensity (kg CO2 per £ of turnover), Stagecoach's carbon impact now is 22% less than four years ago.
As a result, Stagecoach Group is the first Transport Company to reach the Carbon Trust standard for emissions reductions.
Where land-use planning, and local transport policies align to facilitate high quality efficient commercial bus operation, then a full range of highways management, economic development, environmental sustainability and socio-economic inclusion objectives are all simultaneously met.
Where bus services are not effectively and positively planned for, and bus operators and their customers are marginalised, then unsustainable car-dependent development is the unavoidable result, contrary to the overarching intent of National Policy, and the explicit principles set out in paragraph 17 of the National Planning Policy Framework.
Stagecoach therefore regrets that connectivity is not given much priority in Warwick District Council's Strategic Vision, although we understand the preoccupation with meeting housing need.
Transport, to the extent that as it is addressed at all in the Strategic Vision, is largely considered in terms of lists of hard infrastructure projects, designed in response to the modelled impacts of the Revised Development Strategy. Transport measures therefore seem entirely to flow out of the Development Strategy, rather than the Strategy firstly taking account of "the opportunities for sustainable transport modes (to be) taken up, depending on the nature and location of the site, to reduce the need for major transport infrastructure" as required by NPPF paragraph 32.
This risks a strong misdirection of attention into physical highway works without looking at more creative and holistic approaches which better address the wider needs of communities, now and in the future. This is explicitly required by paragraph 17 of NPPF. Specifically, it states that plan-making and decision- taking should:
"actively manage patterns of growth to make the fullest possible use of public transport, walking and cycling, and focus significant development in locations which are or can be made sustainable."

Stagecoach also submits that the approach being taken, with its emphasis on hard engineering, is likely to prove more costly than one which identifies and takes up the existing opportunities presented by more sustainable modes of transport, in deciding the location for new development. This approach risks the delivery of that development, by imposing additional burdens on development viability than might strictly be necessary. We note that, just before this consultation closed, the promoters of the greater part of the Myton Garden Village site west of Europa Way, have tabled an application for up to 800 dwellings, of which only 20% are affordable, rather than the 40% sought in Warwick DC's emerging Local Plan policies. The applicants submit a full viability appraisal, by professional development economic specialists, that demonstrates that the cumulative burden on viability of planning requirements, including transport, does not permit the Council's target to be met.
NPPF is clear that planning should also ensure that:
"improvements can be undertaken within the transport network that cost-effectively limit the significant impacts of the development."

NPPF paragraph 31 also explicitly requires that plan-making bodies should
"...work with neighbouring authorities and transport providers to develop strategies for the provision of viable infrastructure necessary to support sustainable development."

We therefore are disappointed that the Revised Development Strategy and supporting Warwick Strategic Transport Assessment (WSTA) makes little or no provision for infrastructure to support delivery of high quality bus services, and in particular, bus priority at key points and on key corridors to the South and North of Leamington where congestion is already becoming a significant difficulty for us, and where future development proposals will greatly increase pressure on the highway network.
Stagecoach Midlands is very concerned that, based on the Warwick Strategic Transport Assessment Phase 3 modelling, undertaken in support of this strategy, the following effects arise, even with all the prioritised mitigation in place:
* A deterioration in traffic conditions in both Leamington and Warwick Town Centres
* A general decline in traffic speeds during peak hours, especially in the network south of the Avon
* That with all model runs, the biggest residual deterioration in road network performance occurs on the south and eastern flanks of Leamington Town Centre, on the one hand, where scope for engineering-driven mitigation is most limited; and on the Europa Way and Tachbrook Road corridors.
* A general increase in peak delays and queuing, in both town centres and on key arterial routes. The modelled increase in queues even at full mitigation at the Victoria Terrace/Spencer Street lights, and the Old Warwick Road/Princes Drive junction, through which a large number of our services must pass to serve the proposed southern focus of planned development, is especially worrying; and barely less so at the Tachbrook Road/Heathcote Lane junction. We are equally concerned, on the opposite side of the urban area, that a similar deterioration in traffic conditions is anticipated at the A46 Thickthorn Interchange.
The result is that each bus within our Leamington and Warwick network will cover less mileage in a given period of time, at the end of the Plan Period. Therefore, just to "stand still" in terms of journey frequency, Stagecoach Midlands will have to find additional resources: buses, drivers and overhead; to maintain the current timetable offer within the urban area and environs. Actual journey times will be slower, which ordinarily would be expected to produce a decline in overall patronage.
There is a real risk that, far from improving the conditions to deliver improved modal choice, in conformity with the requirements of NPPF, the Revised Development Strategy undermines it, because of the absence of specific targeted and comprehensive measures to deliver bus priority.
With regard to the developments themselves, while we do note WCC's preferred strategy on bus service specification to serve specific major development south of the towns in particular, the sense from the consultation document is these and all other bus services, will also have to fight for space on the existing network, alongside all other traffic, with negligible rebalancing of the highway network in favour of the bus as a more sustainable travel mode, as required by NPPF Paragraph 29.
WSTA Phases 2 and 3 modelling do assume certain very limited bus priority measures, though these are largely focused at the northern end of Europa Way. These mainly take the form of priority bus gates to allow buses to enjoy priority release from signals, but do not allocate dedicated lanes for bus services over any distance.
We also note that there is a considerable discrepancy between the Virtual Park and Ride frequency for which WCC are seeking developer funding, and that modelled in WSTA. The Revised Development Strategy sets out a 30-minute frequency service to Warwick, and a 20-minute frequency service to Leamington. WSTA Phase 3 assumes a 9-minute service frequency to Leamington, and 12-minute to Warwick throughout the day (WSTA Phase 3 section 9.2, p.95).
There is also some lack of clarity about the P&R routing and operating mode assumed by the WSTA models. It appears the WSTA Phase 3 modelled a dedicated direct Park and Ride bus service as it is not clear that any allowance is made in the journey time for the service to stop en-route to pick up and set down between the facilities and the town centres, as the "virtual P&R" concept envisaged in the Revised Development Strategy anticipates.
We are also very concerned at the journey time penalty suffered by Park and Ride users, compared with car users, that the model produced. We are therefore extremely sceptical that the mode shift assignment of travel demands to the bus service will occur at the level anticipated by the Plan. We do not see that motorists will see any advantage in parking, waiting up to 20 minutes for a bus to Leamington, and then suffer a slower journey than cars taking a parallel route into town (WSTA Phase 3 figure 30, page 101).
To re-iterate, the Park and Ride bus services are anticipated to operate as a conventional bus routes, and will therefore also act as the main bus links from the proposed development allocations to the Town centre. We do not believe that this service should make an initial journey first to the park and ride facility, before making its way into town, without enjoying any bus priority at any stage. In the absence of bus priority measures, the 15% mode shift target required by the Strategy would be much better achieved by those services serving the developments taking the most direct route into town.
The time disadvantage that WSTA assumes for bus passengers at peak times seriously undermines the credibility of the mode shift targets for bus use required by the Strategy. This time penalty can only be addressed by the introduction of comprehensive bus priority measures on the main affected corridors, and in the town centres of Warwick and Leamington.
We also note that the Leamington Park and Ride Route has been modelled to operate through the Myton Garden Suburb area, a parallel but not comparable route with Europa Way in terms of speed. In fact, depending on urban design approach, this route, with the potential for multiple accesses, side roads and on-street parking, is likely to be, and perceived to be, slower and more circuitous than a service running directly along Europa Way, if conventional urban and highways design approaches are used.
We are aware that a formal outline planning application for the bulk of this area was submitted just before this consultation closed (W13/1016/OUT). It is clear that the Master Plan and Movement Strategy is quite conventional.
We will be making our own submissions in response to the application. For now, in response to this Policy consultation, we would say that there are a number of ways to address this journey time disadvantage by Master Planning and highway design within the Myton Garden Suburb site, which we cover later in this submission. For the avoidance of doubt, we can see the considerable merits of combining a service through the Myton Garden Suburb with the "virtual" Park and Ride operation, BUT for this to work effectively and be attractive to potential passengers, great care needs to be taken in the overall design approach to the actual bus corridor within and adjoining the scheme, and the urban design of the proposals as a whole.
The approach taken within the modelling to the assignment of patronage to P&R is high-level and is therefore relatively inaccurate. Experience over many years demonstrates that park and ride delivers significant mode shift, and commercially-sustainable levels of patronage, only when parking at the destination is highly constrained, very frequent bus services are offered, and significant on-line bus priority exists, to allow motorists to see buses passing them while they sit in queuing traffic.
Looking both at the national experience of successful Park and Ride schemes, and then at a growing list of failed Park and Ride operations in some other towns, we consider that the virtual Park and Ride proposals need far more robust and nuanced operational and commercial modelling, based on a service design that offers very much clearer and more credible advantages for potential customers, if this part of the Revised Development Strategy is to achieve the necessary impacts.
To conclude and summarise, no bus operator can provide high quality mode choices when its costs are increased by operating in heavy congestion, while its customers face delays and unpredictable journey times. Real mode choice requires that the relative attractiveness of more sustainable travel modes needs to be enhanced. The Revised Development Strategy makes almost no explicit provision for such rebalancing, at least as far as bus services are concerned.
Indeed, the relative silence of the Development Strategy on the role of bus services in securing a sustainable form of development is quite notable, despite the weight attached to the effectiveness of certain bus-based elements in the WSTA.
The Councils' own retained specialist transport consultants conclude at the end of the WSTA Phase 3 Report that "further detailed assessment of the potential benefits of the P&R should be undertaken although it is imagined that such testing would be intended to compliment an over-arching feasibility study of the P&R site meaning allowances for mode share and interception could be included within the modelling to allow a better understanding of both the benefits and impacts of delivery." We strongly agree. In fact, we do not understand how the Revised Development Strategy can be considered robust without this work having informed the Strategy.
WDC/WCC's own highways technical consultant explicitly states that "it is critical that sustainable transport improvements form part of the mitigation package to support the housing and employment growth proposals within the District." (WSTA Phase 3 Appendix H Technical Note 21/5/13, page 1).
Stagecoach Midlands considers, having carefully reviewed the revised Plan proposals and the supporting evidence base, that a considerable amount of further work needs to be undertaken, in partnership with promoters, WCC and bus operators, as required by NPPF paragraph 31, to arrive at a deliverable, robust package of sustainable transport measures in support of a much more sustainable local Statutory Development Plan for Warwick.
RDS1 Stagecoach Midlands has no comment to make.
RDS2 Stagecoach Midlands has no comment to make.
RDS3 Stagecoach Midlands wishes to object to the proposed preferred option for the broad location of development, because of the difficulty in serving the sites on a sustainable commercially viable basis.
We strongly agree that a strategy of urban concentration makes best use of existing public transport infrastructure, and allows existing bus services to perform significantly better in terms of load factor. Such an approach also gives scope for a virtuous cycle of service enhancements to be delivered based on an overall larger quantum of demand from which to draw, by developing the network.
This supports travel mode shift not just from within the new developments, but across the improved network as a whole. It is likely, for example, that new or augmented routes serving development to the south of Warwick would continue, as today, across the town centres providing new direct links as well as enhanced frequency. This would improve the overall attractiveness of the service offer, subject to operating conditions being at least as supportive as today.
There is currently virtually no bus priority within the Warwick and Leamington urban area. Were measures to achieve bus priority to be introduced, then the positive effects outlined above would be greatly magnified.
We also concur with WDC and WCC that there is scope through a concentration of development south of the towns, to kick-start a radically improved level of service in an area in which historically it has proved very hard to offer frequent, direct bus services, not least because of car-dependent urban design, and a lack of critical mass of demand. In addition, the major local highway corridors, in particular Tachbrook Road and Europa Way, are already affected by peak-time congestion, even before any new development is constructed.
This opportunity to improve the public transport offer will only be realised, however, by positively planning for the bus to play a much enhanced role. While some of this is implicit in the intent of measures set out in the Revised Development Strategy, we are concerned that overall there is no clear agenda, nor specified measures, to ensure that the opportunities provided by the Strategy to deliver a much higher quality of public transport offer have been taken up, in the form of sufficiently well-developed actions required by Policy. We will address the opportunities we identify in more depth later in our responses.
As such we submit that the Strategy is not in conformity with NPPF.
Stagecoach Midlands OBJECTS to the location and distribution of the quantum around the south of Leamington and Whitnash.
In general, we consider that insufficient consideration has been given to achieving higher density development across the sites, or parts of them, sufficient to make best use of existing and credible future quality public transport provision. While we recognise the attractiveness and desirability of the Garden Suburb vision, the provision of effective high quality bus services is undermined by the relatively low housing densities involved, and the consequent likely impact on the dwelling stock mix.
The current Strategy, in proposing a relatively large development footprint also effectively gives rise to a much greater expanse of development south of Harbury Lane, than is easy to serve by a single high frequency bus route. Diverting existing service 68 through these areas will pull it away from existing development at Warwick Gates OR risk creating a circuitous service design that will be very unattractive to existing bus passengers, while being even less attractive to car owners.
Large parts of the development footprint in Myton Garden Suburb in particular, are much closer to existing local employment and amenities, and are also most closely related to the existing urban area. This development proposal is expected be within easy reach of the proposed high frequency bus corridor incorporating the "virtual Park and Ride". Depending on the master planning approach, higher densities might be justified in Myton Garden Suburb adjoining this bus corridor, either on the eastern flank if the service uses Europa Way, or, if a bus priority corridor were delivered within the scheme, within 250-300m of that. Higher densities, of up to 45 dwellings/Ha, would support much better patronage levels for the proposed bus service.
If it were possible to accommodate a larger development quantum at Myton Garden Suburb overall, which is the location best able to take advantage of sustainable transport measures, it might be possible to avoid the need for land releases elsewhere, which are currently very much less easy to access by sustainable transport modes.
In particular Stagecoach Midlands considers that several small-scale proposed land allocations east of Whitnash/South of Sydenham look to be difficult to serve on a sustainable basis, by attractive public transport services, without significant infrastructure measures being put in place, that are not anticipated by the Revised Development Strategy.
As stated above, the Strategy proposes that the development footprint extends much more than 300m south of Harbury Lane. The development quantum on land allocated beyond this threshold would be equally hard to serve with a bus service sufficiently frequent and direct to be attractive. In addition the wider public concerns expressed about incipient coalescence with Bishops Tachbrook could also be mitigated by a revised approach that reduced the development quantum that needs to be accommodated here by achieving a higher-density more compact urban form on development sites better related to existing and future sustainable transport opportunities.
We particularly object to the smaller scale releases of land south of Sydenham/east of Whitnash. These areas are well beyond 400m of existing bus services. Extending services into this area will require an additional vehicle resource, even at a modest half-hourly frequency. We do not consider that the potential patronage that would be generated by the proposals would sustain a credible commercial service in the long term. In fact, the need to split access to land south of Sydenham with a second access across the current Campion School site, makes this problem much worse, with only an additional 300 dwellings available to support the operating additional operating costs involved, which are likely to be between £130-140,000 per year at current prices.
However, were direct bus-only vehicular access provided across the railway between Whitnash and the land South of Sydenham, we see much greater potential to incorporate these areas into a high-quality commercial bus network, subject to appropriate pump-priming funding being available during the build out period to deliver this service appropriately early. This would require a bus gate incorporating a pedestrian and cycle link; and a high-quality bus circulation facilitated through the site, also picking up the proposals at Fieldgate Lane west of the railway.
Such an approach would lead to Sydenham potentially being directly connected to employment both existing and proposed south of Leamington. We consider that this would significantly enhance its connectivity to these opportunities and greatly improving the socio-economic sustainability of the Strategy. A dedicated transport crossing would also give public transport and other sustainable modes a major advantage over private car use from all the development east of the railway, and as a result these additional measures would offer a much more sustainable location compared with further development south of Harbury Lane.
We support the proposals at Redhouse Farm Lillington where the whole proposal falls within easy reach of an existing commercial high frequency service. It is the one proposed allocation that best makes use of existing public transport services and infrastructure in a location that is already sustainable.
We note the current proposed approach at Kenilworth. We recognise the need to meet the housing requirements of the town, and can see the landscape and other factors that favour Thickthorn. However we object to the current proposals because:
* We see that with the main access being proposed on to the A46 interchange, it will prove to be an exceptionally attractive location for car-based commuting, causing additional peak time congestion and undermining the effectiveness of the Strategic Highway Network, and potentially delaying our existing services, not least those offering fast links to Coventry and Warwick University via A46.
* When evaluating how we might serve the development, it is unclear that the quantum of development proposed there, and that existing adjacent, is sufficient to support a dedicated high-quality bus service longer term. Were we to divert existing routes it would in effect lead to other large parts of Kenilworth which currently enjoy frequent services, being either unserved or much more poorly served.
We also strongly support the additional development envisaged outside the main towns, particularly in larger villages. Bus services to these villages already typically offer hourly services, or better, but the longer-term sustainability of the current level of service does depend in most cases on higher levels of demand. We submit that, at a time when Warwickshire County Council is faced with ever increasing pressure on its budget for socially necessary but uneconomic bus services in rural areas, the approach taken by the Revised Development Strategy outside the main urban areas, is a prudent one to maintain and indeed possible allow some enhancement of bus services to outlying settlements. Walking and cycling do not present as credible a sustainable travel choice in these locations.
We would suggest there is likely to be scope for the kick-start of improved service patterns in certain rural corridors, facilitated by limited developer funding sought across multiple developments served by a rural bus route corridor. This may not only involve added frequency, but also more direct services, making elapsed journey times much more competitive with other modes such as car or scooter.
RDS 5 Proposed Allocations
Station Approach: Stagecoach Midlands would point out that a substantial portion of this site is our existing operational depot for the area. The depot provides the bus services for Leamington, Warwick and most of the surrounding area. No suitable or cost-effective alternative location for a replacement facility has yet been identified. Therefore the site is not available and is thus not currently deliverable or achievable.
Hampton Magna: If it were possible to create a greater allocation here, this would offer a larger population and a wider socio-economic mix that would be much better able to support the ongoing commercial operation of a bus service in this location, and one that is less circuitous than the present route, which given existing levels of patronage, requires Local Authority financial support.
Hatton Park: If it were possible to create a greater allocation in this area, this would offer a larger population and a wider socio-economic mix that would be much better able to support the ongoing commercial operation of a bus service in this location, and one that is less circuitous than the present route, which given existing levels of patronage, requires Local Authority financial support.
The current design of internal roads also makes the existing development exceptionally difficult for bus services to penetrate, owing to the detailed design of traffic calming features. Any traffic calming measures introduced must be low floor bus friendly and very minor works within the highway could address this as part of future development proposals, and should be required to do so.
RDS 6 Employment Land requirement: Stagecoach Midlands has no comment to make.
RDS7 Location of new employment land.
Stagecoach Midlands supports the provision of employment land at the western end of Thickthorn, which could be served by our existing services; and also and allocation adjoining Warwick Technology Park (WTP).
The augmentation of employment at WTP could help create greater critical mass of demand for existing and future augmented services here, as well as reducing the average distances residents in the locality will need to travel to work from the new development overall. Shorter travel to work distances give scope for more sustainable modes, including bus services, to offer attractive options compared with personal car use.
It should be possible to address the current very unsatisfactory bus circulation and stopping arrangements within the existing Technology Park site, and the problems associated with on-carriageway and other inappropriate parking. Rigorous Travel Planning formulation and delivery should accompany proposals for this location to avoid exacerbating existing car-dependency and congestion. If a direct bus-only link could be provided from the north or north-east of WTP, through a Technology Park extension sited north of Harbury Lane, and into the wider Myton Garden Village beyond, this would make the resulting bus journey quicker than the car for many trips at peak times.
Chapter 5, Strategic Development proposals
Stagecoach Midlands has concerns that the strategic development proposals set out in the Strategy are coming forward through the development control system in an uncoordinated manner, in advance of the strategic Policy framework to guide this development being in place. These proposals now account for the majority of the strategic quantum. Having reviewed all of them, we find that in most cases, little consideration has been given to providing a sustainable high quality bus service within convenient walking distances of homes. We will make our separate representations on individual proposals in due course.
In general, Stagecoach Midlands believes that the density proposals do not support high-quality public transport provision. Within an average density of 30-35 dwg/Ha Master Plans should make provision for higher density along proposed bus corridors, even if this is offset by lower densities in the more remote areas.
Myton Garden Suburb: We are aware that a formal application has been submitted by the promoters ref W13/1016/OUT, for the bulk of the proposed allocation west of Europa Way, and was registered less than a week before this consultation closes.
This proposed allocation offers by far the most compact urban form of the sites identified in the Revised Development Strategy. In the view of Stagecoach Midlands, this site is the most critical to the success of the proposed Strategy. This is because it sits between the existing urban area, including Leamington Town Centre, and most of the proposed new strategic development. The main new strategic bus corridor is proposed to run either alongside or within the site. En-route, this corridor serves key destinations such as the Station, Morrisons, Leamington Shopping Park, existing employment at Europa Way, and the existing and expanded Technology Park, before continuing to serve the greater portion of residential development proposed in the Strategy.
Creative and imaginative urban design and master planning could deliver bus priority through or alongside the development, thus unlocking the viability of:
* The proposed virtual Park and Ride
* The new bus route
and by extension all the other public transport initiatives supporting the strategy
By linking together the Technology Park, its extension, the Park and Ride, and the residential area using a dedicated bus-only link through or alongside the development to create a bus priority route to Europa Way; the opportunity will have been taken to protect and exploit sustainable transport modes in line with NPPF paragraph 35.
A number of alternative approaches within the control of the promoters of Myton Garden Village could secure this outcome, including:
* peak bus priority along the dualled Europa Way, with the nearside carriageway being a bus lane at peak times.
* An additional bus lane or dedicated bus road provided over and above the dualling of Europa Way for general traffic
* A purpose designed bus corridor within the Garden Suburb, which may be used by vehicular traffic for portions of its length, but with a bus gate or gates to prevent rat-running.
Without such measures, we believe that the Strategy as a whole will only perpetuate and exacerbate the existing car-dependence in this area, in direct contravention of NPPF. Such an approach would be unsound, as it would be inconsistent with national policy.
South of Gallows Hill: Stagecoach Midlands supports this allocation in principle. The initial proposals made in a formal outline application by the developers for the eastern portion of this area did not anticipate bus services entering the site. The road layout would involve excessive circuity and only allow buses to serve the far edge of the development, which would mitigate strongly against effective and attractive bus service provision.
Those proposals have recently been withdrawn. We submit that any future master planning approach for this site and the land to the west, should be comprehensive, and assume the retention and enhancement of the existing bus routing, with good, well-surveilled pedestrian links to quality bus stops provided on Harbury Lane, spaced between 280-330m apart. This justifies higher densities on the northern edge of future proposals.
Proposals here should help support high-quality links from the area towards Warwick and thus can be considered to support the consolidation of demand on an existing public transport corridor.
We agree this area is less suitable for employment-led development, from a public transport perspective, not least because we believe it is more operationally expedient to provide the P&R and the Technology Park extension to the north of Harbury Lane, immediately adjoining the Technology Park and its extension.
West of Warwick Gates: Stagecoach supports this allocation in principle. Stagecoach Midlands reiterates that this site needs to make provision for high-quality roadside infrastructure and associated pedestrian links to them if the site is to be sustainable, and the overall Transport Strategy is not to be undermined.
Lower Heathcote Farm: We note a formal planning application was made for the northern portion of this site. Stagecoach Midlands notes that the promoter has made no provision for a bus service to penetrate the site directly or indirectly in those proposals. These have now been withdrawn. We found this omission most concerning. We submit that any future proposals for this land should assume the retention and enhancement of the existing service along the existing route/s, with attractive pedestrian links to quality bus stops provided on Harbury Lane. This approach justifies higher densities on the northern edge of future proposals that come forward. As a corollary it may be appropriate to reduce densities at the southern edge especially if these plots end up being outside a reasonable 400m walking distance of stops on Harbury Lane.
This would also support wider urban design and planning objectives.
We object to the development footprint extending further south onto land beyond the initial application site, as this land is well over 400m away from Harbury Lane and will not be within reasonable walking distance of a good bus service.
Former Sewage Treatment Works: Stagecoach Midlands objects to the proposed allocation. The Company does not see that a viable bus service could be provided, as this area could foreseeably be within 400m of a quality public transport corridor. Planning applications made on adjoining land to the east (Grove Farm) and west (Lower Heathcote Farm) make no apparent provision for an efficient bus route linking through this land. In any case, as discussed above, even if a comprehensive approach is taken to deliver a bus corridor south of Harbury Lane, this would draw any service away from the existing development north of Harbury Lane, or lead to the splitting of the provision such that the frequency of service offered would not be sufficiently high to be attractive. We therefore submit that, with the possible exception of some limited development on the northern edges of the site, this option is not sustainable.
Grove Farm: This site is not currently within easy reach of existing bus routes operating at regular high frequency. It is possible that a new service might be provided along Harbury Lane to the north of the site. Alternatively the existing hourly X18 running to the east of the site offers a much more direct route to the town centre, and might be augmented. We note an application for an initial 220 dwellings, all within 400m of Harbury Lane, is already submitted (W/13/0036/OUT). We can see that the layout affords a potential link to land to the south. The full quantum proposed, alongside proposals to the NE at Woodside Farm, might support the provision of a new local bus service, or a wider network recast to improve local bus frequencies serving the site.
However while in landscape terms this site functions as a unity with proposals to the west in particular, and equally adjoins the urban area, it will be much harder in this area to take advantage of the bus service improvements serving the wider area proposed by WCC. We consider this site less sustainable in terms of making best use of existing bus services, or logical improvements to the local network. We believe developer contributions from this site, and Woodside Farm, would be justified to kick-start a much better frequency of service on the Tachbrook Road corridor serving both this site and Woodside Farm, over and above those already being sought by WCC.
Woodside Farm: We note the site is the subject of an undetermined application W/13/0776/OUT. This site is relatively hard to serve directly by public transport. Providing a bus turning circle within the site, in line with the current proposals submitted earlier this year, or a bus-only gate giving through access to Harbury Lane, might achieve a 30-minute commercial service at final build-out when combined with the full quantum at Grove Farm, and a suitable means of running buses within the wider Grove Farm development. We recognise an existing PRoW offers direct access to our existing G1 Goldline service, but its width and quality is very poor, and many dwellings will be beyond the limits of a 400m walk to the stops on Coppice Road.
In our view, as stated for Grove Farm, additional proportionate developer contributions might be secured towards kick starting a new or augmented bus service via Tachbrook Road running at least every 30 minutes, and preferably every 20 minutes, serving these sites, and the poorly-served eastern end of Warwick Gates.
Employment Site Option 2: As noted above we support this option over a site south of Gallows Hill, subject to effective linkage both between the existing Technology Park and the site; and also the proposed residential development further north at Myton Garden Suburb. As discussed above we see a number of means whereby a creative and effective solution might be achievable.

Chapter 5.1: South of Leamington Infrastructure requirements
Stagecoach Midlands objects to the infrastructure strategy as the measures would not deliver a high quality public transport service and is thus inconsistent with the objectives of the strategy.
We have been previously notified by WCC of its intentions and approach to securing bus service improvements in support of the Strategy. We broadly concur with the overall shape of the strategy.
However it is clear to us that the 15% mode shift sought demands much higher bus frequencies, in particular on the virtual Park and Ride services. This would demand the pump priming of additional vehicles, above the four for which WCC is seeking funding.
Not least, the additional development quantum south of the towns that that RDS now proposes, demands significant additional capacity to achieve the required mitigation. Today the bulk of our town services operate with 38-seat midibuses. A 20-minute frequency would offer only 112 one-way seats per hour to Leamington. Full sized single decks would offer up to 46 seats per journey. If the Park and Ride is to be successful, and secure a significantly higher bus mode share from new residential development, which accounts for up to 3195 new dwellings and a new population of about 7,200, this capacity will not be sufficient
In particular we believe that a second new direct service needs to be offered via Europa Way and there must be sufficient bus priority to ensure that the speed of the service is attractive enough to encourage its use by the residents of this area.
We also strongly endorse WCC's view that a Park and Ride needs to be an integral part of the wider bus network to be viable.
We consider that a 20-minute direct and 30-minute indirect service to Leamington town will be not sufficiently attractive to persuade motorists passing the P&R site to use the service, or encourage local residents to make use of the facility. The time penalty associated with waiting for a bus is likely to be, or perceived to be, too high. Experience across Stagecoach operations shows that urban services ideally require a "turn up and go" frequency of between 10-12 minutes to provide an attractive choice for casual bus use by customers who have a car available. A 15 minute frequency is the absolute minimum service that might achieve this goal.
In addition to be financially sustainable the proposed Park and Ride site must be of sufficient capacity to cope with the existing pressure on parking at WTP, the proposed new employment park and shopping, casual leisure or tourism visits. We believe that a greater provision is warranted than the 500 spaces proposed due to the above demands. We look forward to working with the Council's consultants in further exploring how Park and Ride could be made to work successfully, through a robust and comprehensive design and operational approach.
Developers south of Warwick are also currently being asked to fund an additional bus resource on service 68. This service is now partly supported by WCC between Warwick Gates, Warwick town centre, and points further west. It is a 30-minute frequency service designed principally to meet essential socio-economic needs. Both in terms of frequency and routing, the service is not attractive to existing car users.
We now understand from the RDS and supporting WSTA phase 2 and 3 that the additional bus for which WCC is seeking funding, is merely to maintain the existing frequency as journey speeds slow down along what is a very long route. This is not what we, and some developers' consultants, have been previously led to believe. This no doubt arises from an assessment of the congestion produced by the proposed development; to allow further diversions into the Park and Ride; and provide possible extensions to serve some development roads. Stagecoach Midlands questions how this is either financially sustainable after a subsidy period ends, of how far such a service will perform much meaningful mitigation. This measure cannot be considered a service enhancement.
A 30-minute service 68 would not be able to perform a meaningful Park and Ride function between the proposed virtual P&R and Warwick, given that if a bus has just left, it would be as quick for a reasonably able person to walk the 1900m to Warwick Town Centre.
There is a large inconsistency between the Park and Ride service specification set out in the Revised Development Strategy, and that actually modelled by WSTA to develop and test a credible highways impact mitigation package. The WSTA Phase 3 model assumes a 9-minute bus frequency to Leamington and 12 minute to Warwick. From what we can ascertain in the Consultation Document, the Strategy and associated infrastructure schedule is seeking funding to maintain a 30-minute frequency on service 68 to Warwick and a new 20-minute frequency service to Leamington. The discrepancy between the RDS proposal and the supporting evidence base offered by WSTA is considerable, and we would appreciate clarification.
The Councils' own evidence makes clear within the results of the WSTA Phase 3 model runs, that should the P&R-based mitigation strategy fail, the implications for the wider network are very serious. This is demonstrated by the queue length outputs, and the average traffic speed outputs, presented at section 9 of WSTA phase 3, and attached appendices D-G. There appears to remain a significant risk that if congestion rises further this will create a vicious spiral of lower bus use, higher costs, and ultimately service reductions, aggravating the problem.
Stagecoach Midlands also wants to highlight the significance of the tradeoffs between the costs of on-site and off-site highways and engineering measures, other necessary infrastructure, and the delivery of other policy objectives.
We realise that the proportion of affordable housing provided is particularly liable to reduce to redress the difficulties of overall development viability.
This is very relevant to the robustness of the Plan, in terms of the opportunity to make best use of sustainable transport. We recognise that the 40% affordable housing target aspired to by WDC is relatively high. Experience nationally is starting to make clear that this does support generation of much higher bus service patronage on new developments.
In order for the package of additional bus services to the area to be sustainable long term, it is very important that the maximum affordable housing quantum is delivered. However, we can already see publicly available detailed evidence, in the form of the viability assessment provided by the applicants at Myton Garden Suburb attached to application W/13/1016,that a level only half that aspired to, may actually be deliverable based on the emerging infrastructure strategy.
On the basis of the above issues we object to the Infrastructure strategy, as it makes little or no explicit provision to rebalance modal dependence in favour of public transport. There is little provided in the way of bus priority and there is a risk that the impacts of the Strategy may undermine current bus operations.
Achieving mode shift and a parallel reduction in operating costs through higher vehicle productivity is of the essence in delivering the optimised transport strategy for the area. We are thus very concerned, that no mention is made of comprehensive measures to assist public transport and redress the current conditions in the area today that all favour personal car use over more sustainable modes.
It should be noted that today a disproportionate level of bus operating mileage within the area earmarked for strategic growth needs to financially supported, compared with the rest of Leamington and Warwick, where services are generally fully commercial. Thus the Strategy needs not only to deliver augmented service that can credibly be sustained through revenue alone at the full build out period, but to recover a modest deficit situation.
The current difficulties operating bus services in the proposed growth quadrant arise to a great extent from historic approaches to land use and urban design. Previously, planning did not make any provision for the creation of effective bus routings. In fact, master planning and detailed design of streets have led to a situation where bus services have had to be retrofitted on some roads within the Warwick Gates development that are barely able to accommodate the vehicles. There is virtually no provision of high-quality roadside infrastructure in the wider area. Any perpetuation of this approach would be inconsistent with NPPF.
We therefore welcome that the Plan Strategy makes explicit reference to high-quality bus stop infrastructure, at least incorporating high profile flags and timetable displays, a suitable boarding area to offer level access to the disabled and infirm, and additionally, high quality shelters where appropriate. We would urge that this takes a more prominent place within the final Plan. Given the difficulties encountered retrofitting bus stops after initial consent we strongly urge that sites are agreed as part of initial master planning at Outline submission stage, where urban design and effective pedestrian accessibility can be considered with bus stop location in the round, and not at the determination of Reserved Matters.
We also support WCC's design standards for residential streets (2002) which requires 6.5m widths to accommodate bus routes, or 6.2m where on-street parking bays are provided. We recommend tracking for 12.2m Scania K230UB or Optare Versa V1200 single deck buses should be assessed to test all proposed bus routes within submitted layouts for fitness. Effective and efficient bus operation means that routes for buses should avoid multiple changes in priority, and sharp bends. Equally, tight radius corners, however subtle the turn, cause buses disproportionate difficulty, and we recommend they are avoided.
Chapter 5.2 Sites at Whitnash/South of Sydenham
We object to the proposed infrastructure requirements as we believe that they will be insufficient to facilitate the provision for sustainable bus service.
The now-consented appeal site south of St Fremunds Way cannot be served by a further extension of service 67, as a further vehicle resource would be needed. Much less will be possible to serve an additional 300 units to the south, for which separate access is envisaged, and therefore an entirely separate bus route would be required. As outlined above, merely extending services into this area at existing limited frequencies will require substantial additional resource, the costs of which, if developer-funded, would neither meet CIL Tests of reasonableness across such a limited housing quantum, nor would it likely to be commercially sustainable at full build out.
As we have said elsewhere, without a bus link across the railway offering scope to tie this area into the wider network to the west we do not see how this proposal can be considered sustainable.
Final Comments
Stagecoach Midlands is very aware that land-use planning must resolve a very large number of conflicting objectives and interests, to the ultimate benefit of the community.
The Company also recognises the particular challenges involved in today's economic climate, and equally respects the plan-making efforts sustained by both Councils and other stakeholders over a very considerable period to date, that have led to the current proposals.
We trust that Warwick District Council and Warwickshire County Council recognise that we are very willing to play an active and constructive role in further shaping the Development Strategy, as key stakeholders in securing sustainable development now and into the future.
Stagecoach Midlands would be happy to meet with representatives from the two Councils, developers and their respective specialist consultant teams as required, to assist in achieving the optimum development strategy for Warwick District over the next 20 years, and to help ensure that the objectives of sustainable development are met in the detailed design of the development proposals.

Support

Revised Development Strategy

Representation ID: 56445

Received: 29/08/2013

Respondent: Bloor Homes

Agent: Marrons Planning

Representation Summary:

Supports the categorisation of Hatton Park as a sustainable location for new housing.

One of the largest villages within the District, and therefore is considered of a scale to be able to accommodate limited housing growth on suitable and appropriate sites without having a significant impact on the character or appearance of the settlement. This is in contrast to the nearby village of Hatton Green, which although benefiting from a primary school and church, is of a scale where new housing would have a significant detrimental impact on its character and appearance. Hatton Park is not constrained in this way, but of course benefits from the close proximity to those services within Hatton Green as well as the regular train services serving nearby Warwick Parkway.

It should also be noted that the Hatton Arms is within easy walking distance of the village, and this should be recognised within the Settlement Hierarchy Report (Draft).

Happy to share evidence on the suitability of the land for residential development.

Full text:

see attachment

Object

Revised Development Strategy

Representation ID: 57655

Received: 22/07/2013

Respondent: Mrs Gillian Ingram

Representation Summary:

Objects to large scale building of housing on the edge of Hatton Park, the area floods easily. There is no mention of housing for the mature such as bungalows. Infrastructure is already stretched, there are not enough school places or doctors in the area. Need to protect wildlife and ecology in the area.

Full text:

see attached

Attachments:

Object

Revised Development Strategy

Representation ID: 57657

Received: 23/07/2013

Respondent: Mr Michael Busby

Representation Summary:

The proposed development at Hatton Park is approximately 10% of existing development and therefore will need to be carefully managed to ensure the open green space character of the estate is maintained. Should include a range of dwelling sizes (although not bungalows) and be acheived by small additions rather than building on mass. There are no employment opportunities in Hatton Park so new residents will need to commute. There is a poor public transport service and the cycle path is not appropriate for increased volume. Birmingham Road is already busy and no improvements are proposed. The estate only has one shop and lacks local amenities such as a GP surgery, dentist and school this will compound traffic problems. Ferncumbe School is too small and will need enlargement.

Full text:

see attached

Attachments:

Object

Revised Development Strategy

Representation ID: 57658

Received: 29/07/2013

Respondent: Mr & Mrs Bernard & Marguerite Boyle

Representation Summary:

Objects to development at Hatton Park. The Birmingham Road is already extremely busy and subject to fatal accidents, the proposed housing would increase traffic considerably increasing emissions and accidents. This is green land which should not be developed. The infrastructure is stretched to the limit already development would increase the strain on schools, doctors surgeries etc. One of the sites is adjacent to Hatton Locks which attracts many visitors, development would affect the visual beauty of the area and heritage dating 200 years. There would also be an affect on flora and fauna including endangered species. The adjacent canal would b a danger to children living in the new houses.

Full text:

see attached

Attachments:

Object

Revised Development Strategy

Representation ID: 57663

Received: 29/07/2013

Respondent: Mr Simon Fletcher

Representation Summary:

The A4177 Birmingham Road is already very busy with a lot of accidents occurring.To add more housing at Hatton Park does not make sense and would bring traffic to a standstill. The impact on the small community at Hatton Terrace would be huge. To propose new dwellings in the proximity of the exisiting shell petrol station would be a recipe for danger / traffic accidents.Development near to the Hatton Flight(Locks) would damage the openess of the countryside and impact on visitor numbers.The Greenbelt and the wildlife diversity along the canal corridor should be defended.
On several occassions development has been rejected at this location due to concerns related to traffic / safety. The local school does not have capacity for further childrens places.

Full text:

see attached

Attachments:

Object

Revised Development Strategy

Representation ID: 57670

Received: 26/07/2013

Respondent: Miss Louise Letchford

Representation Summary:

The Birmingham Road (A4177) is already busy and dangerous, the whole road is an accident black spot, with some particularly dangerous bends.Thre are insufficient recreational facilities in the locality and no facilities for children which would potentially bring them into conflict with the busy road. A substantial increase in traffic would affect the safety of existing residents. There are instances of localised flooding that would be made worse. The Green belt should be defended as well as the prevailing wildlife / quality of the area. The tourist attraction of Hatton Lockscould be compromised / spoilt. Ther are not enough local srvices , schools , doctors etc to support this proposal.

Full text:

see attached

Attachments:

Object

Revised Development Strategy

Representation ID: 57700

Received: 16/07/2013

Respondent: Mr Gary Ingram

Representation Summary:

Re: Field adjacent to A4144 (with access to be gained off Ebrington Drive)

The field is prone to flooding in wet weather (balanacing pond).

Another 90-100 houses on this field would cause further traffic issues in rush hous on road to Warwick as this is already heavily congested every morning.

More traffic on and off the estate causing congestion.

Infrastructure not in place for more residents - not enough schools inlo local area to accommodate the new residents.

No local amenities - shop too small - no GP surgery.

If M40 is closed the traffic is horendous - another development would cause gridlock.

On a positive note the estate may benefit with a smaller development a the top of the estate for more elderly residents.

Full text:

see-attached

Attachments:

Object

Revised Development Strategy

Representation ID: 57715

Received: 29/07/2013

Respondent: Dr Penny - Anne Cullen

Representation Summary:

The lane will be ruined plus acces and exit will be posing danger to road users and pedestrians, cyclists and motorists.
The lane is prone to flooding.
Development would ruin the Green Belt, wild animals, lovely open countryside, rural walks and nice views.

Full text:

see-attached

Attachments:

Object

Revised Development Strategy

Representation ID: 57750

Received: 31/07/2013

Respondent: Mrs Ruth Speczyk

Representation Summary:

The local infrastructure could not cope with further development in this locality. Thre are exisitng problems with the volumes of traffic and heavy lorries in particular. The children's play area would be made unsafe by additional traffic. There is currently only one small shop and the schools and Doctors surgeries are full to capacity already. Further development should not take place at Hatton Park.

Full text:

see-attached

Attachments:

Object

Revised Development Strategy

Representation ID: 57845

Received: 29/07/2013

Respondent: Mr Antony Slater

Representation Summary:

Concern at housing at Hatton Park:
Inadequate infrastructure - doctors and dentists miles away. No places at Ferncumbe school.
Increased traffic danger on already congested roads and turn to Parkway rail station.
Greenfield site and green belt land off Barcheston Drive, which is currently used for leisure pursuits. Would have to be exceptional circumstances.
Access difficult and inclines dangerous in bad weather.
Hierarchy incorrect and Hatton should be small/feeder village.
Hatton Park doesn't need more houses, it needs facilities.
If devt takes place, only site offering least harm is R117.
Recognise need for housing when evidence based on not GreenBelt

Full text:

see attached

Attachments:

Object

Revised Development Strategy

Representation ID: 57850

Received: 24/07/2013

Respondent: Mr Dean Epton

Representation Summary:

Objects to development of 70 to 90 homes to the rear of Combroke Grove, Hatton Park. There is not the infrastructure to support a further increase in residents and traffic in the area. The volume of traffic on the Birmingham Road is already an issue particularly in the morning due to parents dropping off children. If development goes ahead houses on this road will lose their views of open countryside. It would also result in a loss of wildlife / bird habitat, currently a range of birds nest in the hedgerows and fields. Noise and dust from the construction of these homes would also be an issue.

Full text:

see attached

Attachments:

Object

Revised Development Strategy

Representation ID: 57913

Received: 30/07/2013

Respondent: Mr Steve Halliday

Representation Summary:

1. Lack of information on Green Belt development proposals and the impact on the green area of Hatton

5. Environmental Effects
In relation to Hatton Proposed developments this will affect canal environmental issues.

Full text:

see-attached

Attachments:

Object

Revised Development Strategy

Representation ID: 57935

Received: 29/07/2013

Respondent: Ms Myra Styles

Representation Summary:

Object to the development of sites in Budbroke / Hatton Park including Oaklands Farm, and sites R125. R75 on map dated 17-5-13. These sites are in the green belt. they are accessed off a very busy section of the Birmingham Road and would be a traffic safety hazard. Development here would also affect the historic and open setting of the town when approached along the A4177. This would result in irreversabkle harm to the landscape. There may also be health issues with housing located so close to a petrol filling station. Some of these sites form part of a green corridor and back on the canal and thereby provide a highly valued recreational area.

Also object to site 115 on map date 17-5-13.This is a large site, close to a narrow strech ofthe A4177 which already suffers from congestion. It is an open, rural area forming part of a green corroidor. Development here would harm the landscape. Surface water drainage on Brimingham Road has previously been an issue and could be a significant hazrd whilst building works are taking place.

Full text:

see-attached

Attachments:

Object

Revised Development Strategy

Representation ID: 57936

Received: 29/07/2013

Respondent: Mr Robert Cochrane

Representation Summary:

Object to the development of sites in Budbroke/Hatton Park including Oaklands Farm, and sites R125. R75 on map dated 17-5-13. These sites are in the green belt. They are accessed off a very busy section of the Bormingham Road and would be a traffic safety hazard. Development here would also affect the historic and open setting of the town when approached along the A4177. This would result in irreversabkle harm to the landscape. There may also be health issues with housing located so close to a petrol filling station. Some of these sites form part of a green corridor and back on the canal and thereby provide a highly valued recreational area.

Also object to site 115 on map date 17-5-13.This is a large site, close to a narrow strech ofthe A4177 which already suffers from congestion. It is an open, rural area forming part of a green corroidor. Development here would harm the landscape. Surface water drainage on Brimingham Road has previously been an issue and could be a significant hazrd whilst building works are taking place.

Full text:

see-attached

Attachments:

Support

Revised Development Strategy

Representation ID: 59156

Received: 29/07/2013

Respondent: Mr Robert Cochrane

Representation Summary:

Support development at sites 114, 124 and 127 on the map dated 17-5-13. These are in an area where Birmingham Road is less congested and adjoin built up areas. Design would need to be sympathetic and ecological features would need to be retained. Development here could be supported by a re-routing of the No. 68 bus

Full text:

see-attached

Attachments:

Support

Revised Development Strategy

Representation ID: 59157

Received: 29/07/2013

Respondent: Ms Myra Styles

Representation Summary:

Support development at sites 114, 124 and 127 on the map dated 17-5-13. These are in an area where Birmingham Road is less congested and adjoin built up areas. Design would need to be sympathetic and ecological features would need to be retained. Development here could be supported by a re-routing of the No. 68 bus

Full text:

see-attached

Attachments:

Object

Revised Development Strategy

Representation ID: 59240

Received: 11/07/2013

Respondent: Mr Simon Evans

Representation Summary:

Road infrastructure cannot cope with current traffic levels. Fatalities have occurred in this area.
Schools are full.
Area already floods during winter
Wildlife will be impacted eg bats inhabit nearby woods.

Full text:

I am writing to register an objection against the below consultations to develop the land surrounding Hatton Park for the building of houses and a gypsy site. Specifically:

R115 relating to the land behind Tidmington, Combroke, Ebrington.
R125 & R25 relating to Oakland's Farm, next to the Shell garage, where not only are they looking to this land for building houses but this location has also been designated as a proposed gypsies site.

My objection is based on a number of issues: Safety: the road infrastructure cannot cope with the current traffic levels with fatalities having already taken place over the past few years on the stretch of road involved. Amenities: local amenities such as schools are already full to bursting. Environmental: The area already floods during winter, the local wildlife will be impacted upon as a number of animals including bats inhabit the woods close to the sites. And lastly, I believe that the Government paper which calls for local councils to provide traveller pitches also states that settled communities should not be impacted upon, which clearly they would be.


Should you require any further information please let me know.

Object

Revised Development Strategy

Representation ID: 59251

Received: 08/07/2013

Respondent: Emma Guest

Representation Summary:

Were assured that the land would not be built on. This was reiterated in 2011.
Would spoil the countryside particularly for those who overlook the site.
Will increase in traffic.

Full text:

We are opposed to the above (A) on the following grounds:

1. Property prices in the immediate vicinity will decrease - we would not have moved here if there had already been a gypsy site;
2. There will be an increase in crime;
3. The site will look unsightly;
4. There will be noise and extra traffic.

We are opposed to the above (B) on the following grounds:

1. When we moved here, we were assured that the land in question would not be built on and this was reiterated at a Parish meeting in 2011;
2. Building here would spoil the countryside and particularly for those whose homes overlook the site;
3. Increase in traffic.

I trust you will give these comments full consideration when making your decision.

Object

Revised Development Strategy

Representation ID: 59252

Received: 08/07/2013

Respondent: Rebecca Evans

Representation Summary:

Wish to register an objection.

Full text:

I am writing to register an objection against the below consultations to develop the land surrounding Hatton Park for building houses and a gypsy site. Specifically:

R115 relating to the land behind Tidmington, Combroke, Ebrington.
R125 & R25 relating to Oakland's Farm, next to the Shell garage, where not only are they looking to this land for building houses but this location has also been designated as a proposed gypsies site.

My husband will be attending the planned meeting at Hampton Magna village Hall.

Should you require any further information please let me know.

Object

Revised Development Strategy

Representation ID: 59503

Received: 25/07/2013

Respondent: Mrs Susan Halliday

Representation Summary:

Due to the busy Birmingham Road (A4177) being a blackspot for accidents the Hampton Magna/ Hatton Park settlements cannot take anymore traffic / development.
There is regular flooding of the storm drains on the Birmingham Road and no recent infrastructure improvements to sort this problem out.
The Green belt is also very important and should be maintained/ protected from further incursions/ development.

Full text:

see attached

Attachments:

Object

Revised Development Strategy

Representation ID: 59657

Received: 22/07/2013

Respondent: Trustees of the Haseley Settlement

Agent: RPS Planning & Development

Representation Summary:

Supports the development of 70 to 90 houses at Hatton but considers that development should not just be directed to Hatton Park but also include sites at Hatton Green to meet this requirement. The 1.05ha site at Hatton Green is located between two existing properties in the heart of the village. Access could be taken off the green and development integrated without visual impact.
The larger 8ha site off Hockley Lane has good access to the Birmingham Road, facilities and bus stop. 90 dwellings could easily be located on the site.

Full text:

see attached

Attachments:

Object

Revised Development Strategy

Representation ID: 60283

Received: 29/07/2013

Respondent: Hatton Parish Council

Representation Summary:

Residents attending a public meeting in Hatton expressed the following concerns about the the proposals for Hatton Parish:
-Hatton Park should be classified as a small/feeder village and the scoring for the settlement should be reviewed - some local rsident believe the scoring for the village is exaggerated.
-change of character of the district, the countryside and quality of life
-impact on infrastructure (hospital, schools)
-loss of green belt and separation between settlements
-the community is still settling following significant development in recent years
-specific sites around the parish have been reviewed and none are supported
-Whilst limited infill is accepted, the green belt should be preserved in accordance with the NPPF. Exceptional circumstances have not bee justified.

Full text:

see-attached

Attachments:

Support

Revised Development Strategy

Representation ID: 60351

Received: 26/07/2013

Respondent: Hatton Parish Plan Steering Group

Representation Summary:

Recognise that the Local Plan is required to contribute to the national housing shortfall and recognises that the Parish cannot stand still. Assuming Hatton Park meets the criteria for a secondary service village, then 70-90 houses over a 15 year period does not seem unreasonable.

Full text:

Thank you for your letter of June 19th inviting responses to the above consultation documents.
Unfortunately the Steering Group has not been able to carry out a comprehensive consultation of residents in the time available, but the Parish Council has held a public meeting to discuss the revised Plan and will have forwarded its views to you separately.
The Steering Group itself, however, welcomes the revised proposals which seem to be better balanced and more appropriate to the needs of the District and the wishes of its residents than the original ones.
In particular we welcome the reduction in the number of settlements proposed for development along the A4177/B4439 corridor, which would have threatened the integrity of the Green Belt through pepper-potting.
The concerns of the Parish centre primarily around four issues, namely:
1) The Level of Housing
As you will be aware from the Parish Plan, those who expressed a view were strongly opposed to further housing at Hatton, though a minority were in favour of more affordable development. For its part, the Steering Group recognises that the Local Plan is required to contribute to the national housing shortfall and recognises that the Parish cannot stand still. Assuming Hatton Park meets the criteria for a secondary service village (which some people question), then 70-90 houses over a 15 year period does not seem unreasonable. Most of the views expressed at the Parish Council's public meeting were concerned with whether the infrastructure could cope with more development and the likely environmental impact of individual sites, rather than with the numbers per se. We would also like to know what measures, if any, are proposed to ensure that the 70-90 houses is all that the Parish will be required to provide in the plan period, as past experience suggests that the homes will be built quickly, necessitating a further allocation in the next review of the Local Plan in five-years or so time.

2) Infrastructure Provision
The principal issues here are travel and education. Despite the recent, very welcome safety improvements, the geometry of the A4177 and B4439 make these inherently dangerous roads. Congestion is also a problem at peak periods and whenever there are problems on the M42 as they are then used as a diversion to the M40 at Longbridge. Further development and future traffic growth will naturally increase the dangers and we would like to know what improvements, if any, would be sought by way of developer contributions to make these roads safer.

As regards education, all children from Hatton Park have to be bussed to school (or taken by parents in cars). The excellent Ferncumbe School at Hatton Green is over-subscribed and its catchment area at Hatton Park has had to be redrawn (hopefully only temporarily?), with more children being directed to Budbrooke School, which is also at capacity. We would like to know if the District Council has carried out any population profiling to see whether either school is likely to have spare capacity in the future and, if not, whether developer contributions would be sufficient to pay for any necessary improvements. It should be noted that both on-site and off-site improvements would be required at the Ferncumbe School in Hatton Green, where parking congestion is a particular problem. Indeed, the school has initiated a voluntary one-way system through the village to try and alleviate this problem, which is further exacerbated by the number of vehicles left on the road outside Hatton Autocare near to the dangerously blind junction of Hatton Green and the B4439.

Some residents also referred to the inadequate shopping facilities at Hatton Park, though it has to be acknowledged that a modest increase in the number of houses is unlikely to produce sufficient trade to change the situation.

3) Environmental and Social Impacts
As the Parish Plan demonstrates, there is strong support for retaining the Green Belt. The Grand Union Canal is also a highly valued environmental asset and these two features figured prominently in the discussions about the four proposed housing sites within the Parish (Ref. Nos. R114, R115, R117 and R124) and the three adjoining its boundaries (Ref. Nos. R75, R125 and R126).

All seven sites fall within the Green Belt, the primary function of which is to prevent urban sprawl and the coalescence of settlements. This principal would be strongly prejudiced by development of Sites R117 and R124, which would extend ribbon development up Hatton Hill and so join Hatton Park with Canal Lane. It would also be prejudiced by development of Site R126 and, to a lesser degree by Site R115, both of which would extend development along the Birmingham Road and so reduce the gap between Hatton Park and the A46 Warwick By-pass. Development of Sites R114 and R75/R125 would impact least on the Green Belt. Six of the seven sites front the A4177, creating a strong risk of ribbon development, which would be contrary to sound planning practice.

Four of the seven sites (Ref.Nos. R117, R125, R75 and R126) are also adjacent or close to the canaI. The flight of locks at Hatton, descending through a rural landscape towards Warwick with the tower of St Mary's Church in the distance, is an iconic feature of the British Canal network that brings many tourists to the area. Whilst it would no doubt be attractive for developers to exploit the waterfront, it would be a tragedy to lose this priceless approach to the county town.

With regard to social impacts, sites R117/R124, R125/R75 and R126 are all severed from Hatton Park by the busy A4177. For them to become an integral part of the community on the other side of this road and avail themselves of the shop, village hall, school bus pick-ups, children's play area and sports area, would be fraught with difficulty and added danger.

We appreciate that some of these views contradict one another and we apologise for not being able to express a preference for any particular site, but we have no mandate to do so. We would, however, ask that all these points are taken into consideration in finalising the Local Plan.

4) Traveller Sites
Our fundamental concerns are the impact that any site will have on the environment and people's lives.

We are particularly opposed to sites (except perhaps brownfield ones) that are in the Green Belt, since this would be give travellers a privilege denied to ordinary people. We are aware that travellers claim special dispensations because of their lifestyles, but once a site is established it becomes a permanent feature just like any other housing development and the transient nature of its occupants are no different to ordinary people moving house, albeit perhaps more frequently. Clearly the recent decision of the Communities Secretary to intervene in appeals involving traveller sites in the Green Belt because "in some cases the Green Belt is not always being given the sufficient protection that was the explicit policy intent of ministers" must be a relevant consideration.

We are especially concerned that acquiescing to the Kites Nest Lane site would be an open invitation for anyone to flout the planning laws and then seek retrospective permission, citing this as a precedent.

We would also be opposed to development of the Oaklands Farm site as this would serve to narrow the Green Belt between Hatton Park and Warwick, impact on the rural setting of the Hatton lock flight, introduce turning lorries and caravans onto the A4177 at a dangerous location where there has been a fatal accident. It would also adversely affect neighbouring properties and detract from the approach into Warwick along one of the major routes into the town.