DS15 Comprehensive Development of Strategic Sites

Showing comments and forms 1 to 11 of 11

Object

Publication Draft

Representation ID: 65862

Received: 27/06/2014

Respondent: Warwickshire County Council Physical Assets Business Unit

Agent: Savills

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Warwickshire County Council (WCC) supports the principle of comprehensively developing strategic sites, to ensure the provision of appropriate uses and necessary infrastructure across a number of different land ownerships through good design. However WCC does not consider that the infrastructure requirements for 'Land at Myton / West of Europa Way' listed in Local Plan Publication Draft Policy DS15 are necessary and justified by a robust evidence
base and has made separate representations in this respect to Local Plan Publication Draft policies DS12 and DS14.

Full text:

See attachment

Support

Publication Draft

Representation ID: 65988

Received: 27/06/2014

Respondent: Barwood Development Securities Ltd

Agent: HOW Planning LLP

Representation Summary:

The policy approach of Policy DS15 is supported by Barwood. It is important that
the masterplans for the strategic urban extensions are approved by the Council to
ensure site deliverability. However, Barwood consider that the policy lacks
clarification on the process by which the Development Brief or Masterplan will be
approved.

Full text:

See attachment

Object

Publication Draft

Representation ID: 66182

Received: 27/06/2014

Respondent: Hallam Land Management and William Davis

Agent: Marrons Planning

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

In a separate objection to Policy DS11 Allocated Housing Sites, we have commented on behalf of our clients, on the site at Thickthorn, Kenilworth. It is considered this site should be deleted from the plan and replaced with land south of Gallows Hill, Warwick. Accordingly, a modification is required to Policy DS15 to delete reference to Thickthorn at sub-paragraph (e) and replace this with land south of Gallows Hill.

Full text:

see attached

Object

Publication Draft

Representation ID: 66285

Received: 26/06/2014

Respondent: Mr H E Johnson

Agent: Bond Dickinson

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Support and welcome the opportunity to provide a development brief or masterplan for the proposed development at Red House Farm. However this requirement should not preclude development coming forward in advance of such document being agreed with the Council. As drafted, this policy is unsound as it may cause unnecessary delay to housing delivery and it is therefore not positively prepared. To make it sound the policy should include some flexibility about the timing of the production of a development brief or masterplan. Any development brief or masterplan should be considered acceptable for the Red House Farm site if it excludes the Glebe Farm land.

Full text:

see attached

Support

Publication Draft

Representation ID: 66317

Received: 27/06/2014

Respondent: A C Lloyd Homes Ltd

Agent: Framptons

Representation Summary:

The policy is supported and preparation of a masterplan is underwayfor the land south of Sydenham (Policy DS15c).

Full text:

See attachment

Support

Publication Draft

Representation ID: 66322

Received: 27/06/2014

Respondent: A C Lloyd Homes Ltd and Northern Trust

Agent: Framptons

Representation Summary:

The policy is supported and preparation of a masterplan is underwayfor the land south of Sydenham (Policy DS15c).

Full text:

see attached

Support

Publication Draft

Representation ID: 66507

Received: 27/06/2014

Respondent: Friends of the Earth

Number of people: 4

Representation Summary:

With regards to infrastructure requirements for shops/ local centres / community facilities, conditions on any planning consent should ensure this provision is constructed and open at an early stage of any development.

Full text:

see attached

Attachments:

Object

Publication Draft

Representation ID: 66644

Received: 26/06/2014

Respondent: Place Partnership Limited (PPL)

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Policy DS15 makes no mention of the police infrastructure that will be required to support the development of the Strategic Sites. This is surprising and of concern for two reasons.
Firstly, the Council's 'Draft Infrastructure Delivery Plan - April 2014' makes reference to the following infrastructure requirements under the heading 'Emergency Services': -

*Police: Safer Neighbourhood Team Police Offices - 3 additional offices at Europa Way, Lower Heathcote Farm and Thickthorn

*Other police equipment and costs - A range of other "CIL Compliant" costs including vehicles, communications technology and surveillance equipment, training, uniform and personal equipment

This confirms that the Council accepts that additional police infrastructure will be required to deliver policing services to the strategic sites.

Secondly, at the time of writing strategic site H02 (South of Harbury Lane, including the former sewage works), the H23 site (Bishops Tachbrook - Land south of the school), unallocated sites by Europa Way and Bishop's Tachbrook have all been subject to the following recent planning applications: -

*W/14/0300 - The Asps, Warwick - 900 dwellings - Barwood Strategic Land II LLP - Refused - 30 May 2014 (Appendix 1)

*W/14/0661 - Land at Lower Heathcote Farm - 785 dwellings - Gallagher Estates (see Appendix 2 of the full submission)

*W/14/0681 - Land South of Gallows Hills - 450 dwellings - Gallagher Estate (see full submission Appendix 3)

*W/14/0689 - Land off Oakley Wood Road - 150 dwellings - Bloor Homes (see full submission Appendix 4)

*W/14/0763 - Land off Seven Acre Close - 25 dwellings - A.C. Lloyd Homes Ltd ( see full submission Appendix 5)

To each application we submitted representations in respect of the need for the development concerned to provide police infrastructure. These are enclosed as per the appendices indicated above. At the time of writing, four of the planning applications are still in the process of being determined.

As planning applications are made in relation to the other strategic sites, we will submit similar representations requesting developer contributions towards police infrastructure.

Given all of the above we contend that as presently drafted, Policy DS15 undermines the delivery of the infrastructure necessary to deliver policing services to the strategic sites. It is therefore ineffective and unsound currently.

Full text:

see attached

Support

Publication Draft

Representation ID: 66703

Received: 27/06/2014

Respondent: Barwood Strategic Land II Limited

Agent: HOW Planning LLP

Representation Summary:

The policy approach of Policy DS15 is supported by Barwood. It is important that the masterplans for the strategic urban extensions are approved by the Council to
ensure site deliverability. However, Barwood consider that the policy lacks
clarification on the process by which the Development Brief or Masterplan will be
approved.

Full text:

See attachment

Object

Publication Draft

Representation ID: 66799

Received: 26/06/2014

Respondent: Gallagher Estates

Agent: Pegasus Group

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Land at Lower Heathcote Farm (part of the South of Harbury Lane proposed allocation) can come forward for development early, delivering housing in a manner consistent with the objective of boosting supply and making a contribution to the 5 year housing land supply. The requirement for either development briefs or master plans to be approved by the Local Authority creates a risk that unnecessary delay will prevail. Clarity is provided to bring forward sites through other policies in the plan therefore the requirement for master plans and briefs is not necessary. There are mechanisms in place to ensure that the necessary infrastructure is delivered through the application process and the proposals map is clear about what infrastructure is required and where without the need for a master plan. Policy DM1 assists this. In summary, there are policies and mechanisms in place to ensure the delivery of infrastructure on the strategic sites and that high quality and integrated development is delivered.

Full text:

see attached.

Object

Publication Draft

Representation ID: 66833

Received: 27/06/2014

Respondent: Europa Way Consortium

Agent: AMEC

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Policy DS15 should be amended so that reference to Policy DS14 (community hub and health facilities) is deleted - compliant with separately submitted representations objecting to Policy DS14.

Full text:

see attached

Attachments: