Object

Village Housing Options and Settlement Boundaries

Representation ID: 62209

Received: 24/01/2014

Respondent: Mr Ray Watkin

Representation Summary:

-Placing all 75 dwellings on Preferred Site 1 seems excessive.
-Concerned about the access point to Site 1 in relation to HS2 development issues. HS2 construction site will be developed off Red Lane with access more of less oppose the proposed access point. Concerned about the disruption the village will have to put up with whilst all these developments are taking place.

Full text:

see attached

Attachments: