Object
Village Housing Options and Settlement Boundaries
Representation ID: 61885
Received: 17/01/2014
Respondent: Mrs Margherita K Dove
Representation Summary:
-Access to site 1 would be a problem, there have been 2 accidents around the site that I know of.
-In heavy rain, storm waters run down School Lane and Church Lane and into the field- the drains cannot cope.
-There would need to be a mixture of housing whichever Site is chosen.
Full text:
see attached