Object

Village Housing Options and Settlement Boundaries

Representation ID: 61040

Received: 19/01/2014

Respondent: Mr Graham Stevens

Representation Summary:

As a general comment, it is appreciated that some housing development is required but the nature and volume of it is totally out of keeping with the village and its development. In excess of a 22% increase in the settlements is not acceptable and the infrastructure would not be able to cope with it. Why was the original local plan revised?

Full text:

As a general comment, it is appreciated that some housing development is required but the nature and volume of it is totally out of keeping with the village and its development. In excess of a 22% increase in the settlements is not acceptable and the infrastructure would not be able to cope with it. Why was the original local plan revised?