Object

Village Housing Options and Settlement Boundaries

Representation ID: 60989

Received: 17/01/2014

Respondent: Mr Alex Hills

Agent: Mr Alex Hills

Representation Summary:

1) If only the preferred option is approved, the development of that site will be too concentrated and will not be in keeping with the 'character and setting' of the village
2) In the red lane area where the preferred site is situated, there is a high watertable which needs to be considered, and HS2 construction work and the HS2 train line will be close by

Full text:

1) If only the preferred option is approved, the development of that site will be too concentrated and will not be in keeping with the 'character and setting' of the village
2) In the red lane area where the preferred site is situated, there is a high watertable which needs to be considered, and HS2 construction work and the HS2 train line will be close by