Object

Alternative Sites Consultation

Representation ID: 44885

Received: 29/03/2010

Respondent: P D & M N S Gorrill

Representation Summary:

The existing road network is just about adequate but would be totally inadequate without further major road works.

The existing schools in the area are already oversubscribed and could not possibly cope with the additional number of children that this development would bring. Just look at the mess that was created to the children's scholastic needs at Warwick gates.

Full text:

The existing road network is just about adequate but would be totally inadequate without further major road works.

The existing schools in the area are already oversubscribed and could not possibly cope with the additional number of children that this development would bring. Just look at the mess that was created to the children's scholastic needs at Warwick gates.