Object
Alternative Sites Consultation
Representation ID: 44224
Received: 16/03/2010
Respondent: Mr G E Higham
Representation Summary:
We are still waiting for a flood alleviation scheme.
No more development until existing drains are sorted out and surface water under control. Previous developments have been passed without the consideration of drainage situation and ditch maintenance.
Full text:
We are still waiting for a flood alleviation scheme.
No more development until existing drains are sorted out and surface water under control. Previous developments have been passed without the consideration of drainage situation and ditch maintenance.