Object
Alternative Sites Consultation
Representation ID: 43963
Received: 07/04/2010
Respondent: Mr STEPHEN WARD
Representation Summary:
The increased level of traffic on an already dangerous road traffic system.
The increased flooding risk to the whole area from the run off created by the new build.
Full text:
The increased level of traffic on an already dangerous road traffic system.
The increased flooding risk to the whole area from the run off created by the new build.