Object

Alternative Sites Consultation

Representation ID: 43713

Received: 17/03/2010

Respondent: F Wright

Representation Summary:

1. The site is greenbelt and must be protected
2. Local infrastructure cannot support the proposed increased population proposal
3. School services have been reduced ie NLS and therefore could not accommodate
4. The ongoing sure start program running for the Crown Way area would have any positive effects diluted by the additional loading.
5. Commuting routes to major roads are already crammed to capacity ie M40 routing through centre or via Kenilworth road
6. High speed rail link routing has to be considered

Full text:

1. The site is greenbelt and must be protected
2. Local infrastructure cannot support the proposed increased population proposal
3. School services have been reduced ie NLS and therefore could not accommodate
4. The ongoing sure start program running for the Crown Way area would have any positive effects diluted by the additional loading.
5. Commuting routes to major roads are already crammed to capacity ie M40 routing through centre or via Kenilworth road
6. High speed rail link routing has to be considered