Object
Proposed Modifications January 2016
Representation ID: 69389
Received: 21/04/2016
Respondent: Mrs P Legg
Legally compliant? No
Sound? No
Duty to co-operate? Not specified
Representation Summary:
The Plan is not positively prepared as the necessary Infrastructure planning is not forthcoming , school places, doctors and shops are all currently oversubscribed.
Area is a flood risk zone.
Traffic remains a problem on the local network and construction traffic would make the situation untenable. The exceptional circumstances for removing this land from the Green Belt are not made.
Full text:
See attached