Object
Proposed Modifications January 2016
Representation ID: 68828
Received: 22/04/2016
Respondent: Mr Keith Kondakor
Legally compliant? No
Sound? No
Duty to co-operate? Not specified
Representation Summary:
- The assumptions and modelling of the SHMA undertaken by GL Hearn is flawed.
- The student population has not been correctly modelled but just lumped into the overall population.
- The outcome of the SHMA considerably over estimates the increases in housing need
- The SHMA uses two types of models, one based on population demographics rolled forward and ones based on economic/employment. Both models are flawed.
Full text:
see attached