Object
Proposed Modifications January 2016
Representation ID: 68817
Received: 18/04/2016
Respondent: Mr. Nicholas Sellwood
Legally compliant? No
Sound? No
Duty to co-operate? Not specified
The modifications do not set out any exceptional circumstances that justify removing this land from green belt.
Flooding risk of surface drainage water from the H50
This situation will be further exacerbated by the loss of woodland with the construction of HS2 which currently aids the absorption of surface water.
Traffic on this road is already busy at peak times. There is no recognition of this within the plan
Insufficient provision for improving Cubbington's infrastructure to support the proposed increase in population
The drains and sewers in the village are inadequate
Loss of agricultural land
See attached