Object
Proposed Modifications January 2016
Representation ID: 68405
Received: 19/04/2016
Respondent: Adam Lee
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
the plan does not take into account numerous lower green belt value land closer and within Coventry boundaries . the plan is unsound as more pollution will be generated from commuting.
Peak traffic is almost already at a standstill, this proposal does not take this into account
Th area is productive farmland , I suggest looking at developing the huge areas of brown field sites in the area before cutting huge areas of green belt land.
Th green belt was put in place to prevent developments such as the one proposed
the plan does not take into account numerous lower green belt value land closer and within Coventry boundaries . the plan is unsound as more pollution will be generated from commuting.
Peak traffic is almost already at a standstill, this proposal does not take this into account
Th area is productive farmland , I suggest looking at developing the huge areas of brown field sites in the area before cutting huge areas of green belt land.
Th green belt was put in place to prevent developments such as the one proposed