Object

Publication Draft

Representation ID: 65580

Received: 27/06/2014

Respondent: Midland Red (South) Ltd. dba Stagecoach Midlands

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

Despite evidence previously given that this site cannot, by virtue of its location, be effectively served by public transport owing to its severance from the main bus network and its peripherality, it has nevertheless been included as a draft allocation.

The allocation is contrary to NPPF paragraph 14 being a fundamentally unsustainable location that cannot be made sustainable. It can only be wholly dependent on personal car use, with perhaps, soime limited scope for cycling.

Full text:

Despite evidence previously given that this site cannot, by virtue of its location, be effectively served by public transport owing to its severance from the main bus network and its peripherality, it has nevertheless been included as a draft allocation.

The allocation is contrary to NPPF paragraph 14 being a fundamentally unsustainable location that cannot be made sustainable. It can only be wholly dependent on personal car use, with perhaps, some limited scope for cycling.

Attachments: