Object
Publication Draft
Representation ID: 65502
Received: 27/06/2014
Respondent: Keith Wellsted
Legally compliant? Yes
Sound? No
Duty to co-operate? No
Representation Summary:
This, along with the site south of Harbury Lane will totally overload the infrastructure in this area. The traffic congestion, extra pollution and general environmental damage to the area will be too great.
Full text:
This, along with the site south of Harbury Lane will totally overload the infrastructure in this area. The traffic congestion, extra pollution and general environmental damage to the area will be too great.