Object
Publication Draft
Representation ID: 4872
Received: 25/09/2009
Respondent: Vera Leeke
Representation Summary:
This should be retained as a green gap between Warwick and Leamington. Housing and industrial development on this site will cause traffic gridlock on all adjacent roads which are already extremely busy.