Comment
Alternative Sites Consultation
Representation ID: 44160
Received: 07/04/2010
Respondent: Environment Agency
Representation Summary:
As with all sites over one hectare in size a Flood Risk Assesment will be required to cover site drainage and to consider the watercourse that bisects the centre of the site.
Full text:
As with all sites over one hectare in size a Flood Risk Assesment will be required to cover site drainage and to consider the watercourse that bisects the centre of the site.