Preferred Options

Ended on the 3 August 2012

Appendices

(1) Map 1: District in Context

(4) Map 2: Potentially Suitable Urban/Edge of Urban Sites

(3) Map 3: Preferred Options (Whole District)

(5) Map 4: Development Sites – Preferred Options (Urban Fringe)

(6) Map 5: Possible Transport Infrastructure

(2) Map 6: Possible Green Infrastructure

For instructions on how to use the system and make comments, please see our help guide.
back to top back to top