Publication (Regulation 19)
Appendix 3 ~ List of Monitoring Indicators
|
Policy Ref. |
Policy Title |
Monitoring Indicator |
|
Chapter 2: Development Strategy: South Warwickshire 2050 |
||
|
DS.1 |
Environmental Mitigation and Compensation |
Number of major planning permissions which have had to provide off-site environmental compensation in lieu of on-site mitigation |
|
DS.2 |
Spatial Development Strategy |
Amount and type of development completed in each of the locations set out within Policy DS.2 in comparison with the spatial development strategy requirements |
|
DS.3 |
Meeting our Development Needs to 2050 |
Net number of new homes, employment floorspace and traveller pitches and plots provided within Stratford-on-Avon District per annum Net number of new homes, employment floorspace and traveller pitches and plots provided within Warwick District per annum Annual updates to the five-year deliverable supply of housing for Stratford-on-Avon District Annual updates to the five-year deliverable supply of housing for Warwick District |
|
DS.4 |
Strategic Site Principles |
Annual progress updates on the delivery status of the New Settlements and Strategic Growth Locations including adherence to the requirement of Policy DS.4 |
|
DS.5 |
Local Growth Locations ~ Employment |
Implementation of sites allocated for employment use including delivery of any site specific requirements Amount of floorspace available, permitted and completed for different types of employment uses on the allocated sites |
|
DS.6 |
Local Growth locations ~ Mixed-use, Leisure, Community and Town Centre |
Implementation of sites allocated for mixed-use, leisure, community and town centre uses including delivery of any site specific requirements. Amount of floorspace available, permitted and completed for different mixed-uses, leisure, community and town centre uses on the allocated sites |
|
DS.7 |
Local Growth Locations ~ Housing |
Implementation of sites allocated for housing use including delivery of any site specific requirements. Number of homes permitted and completed on the allocated sites |
|
DS.8 |
Other Growth Locations |
Amount and type of development provided in each of the locations in categories A-E |
|
DS.9 |
Core Opportunity Area |
Proportion of new employment development provided within the Core Opportunity Area |
|
DS.10 |
Major Investment Sites |
Loss of employment floorspace at Major Investment Sites Provision of new reemployment related uses & floorspace and any site specific requirements at the Major Investment Sites. |
|
DS.11 |
Rural Economy |
Loss of or redevelopment/conversion of employment uses in locations outside of allocated sites Provision of large scale employment proposals that have regional or national significance |
|
DS.12 |
Rural Housing |
Loss of housing in locations outside of allocated sites and Built up Area Boundaries Provision of new housing in locations outside of allocated sites and Built up Area Boundaries |
|
DS.13 |
Green Belt |
Alterations to the Green Belt through Neighbourhood Development Plans Number of major planning permissions on land within the Green Belt |
|
DS.14 |
Protecting the Cotswolds National Landscape |
Planning permissions in the Cotswold National Landscape and the 3km buffer |
|
DS.15 |
Special Landscape Areas |
Planning permissions within Special Landscape Areas |
|
DS.16 |
Protecting, Enhancing and Restoring Landscape Character |
Major planning permissions in areas of high landscape sensitivity |
|
DS.17 |
Maintaining Settlement Identity and Areas of Restraint |
Number of major planning permissions in the Areas of Restraint |
|
DS.18 |
Well-Designed Places |
None – no specific indicators are associated with this policy |
|
DS.19 |
Design Codes |
Number of planning permissions that depart from a relevant Design Code |
|
DS.20 |
Densification and Advanced Methods of Construction |
None – no specific indicators are associated with this policy |
|
DS.21 |
Vale of Evesham Control Zone |
Number of planning permissions within the Vale of Evesham Control Zone that result in a 5% or greater increase in HGV traffic |
|
Chapter 3: Delivering the Necessary Infrastructure |
||
|
ID.1 |
Securing Infrastructure Provision |
Level of infrastructure provision on new development in accordance with the need identified within the Infrastructure Delivery Plan and site specific policies of the Plan |
|
ID.2 |
Infrastructure Delivery |
Level of infrastructure provision on new development in accordance with the need identified within the Infrastructure Delivery Plan and site specific policies of the Plan |
|
ID.3 |
Infrastructure Protection |
None – no specific indicators are associated with this policy |
|
ID.4 |
Stratford-upon-Avon Bypass |
Annual progress updates on the delivery of the Stratford-upon-Avon Bypass |
|
ID.5 |
Sustainable Transport Accessibility |
Provision of improved transport accessibility and infrastructure in accordance with the need identified within the Infrastructure Delivery Plan |
|
ID.6 |
Electric Vehicle Infrastructure |
Level of new or enhanced electric vehicle infrastructure provided through planning permissions |
|
ID.7 |
Park and Ride |
Provision of new and enhanced Park and Ride facilities |
|
ID.8 |
Smart and Connected South Warwickshire |
None – no specific indicators are associated with this policy |
|
ID.9 |
Reducing Flood Risk |
Number of planning permissions not in areas of lowest flood risk |
|
ID.10 |
Water Efficiency |
Number of major planning permissions not achieving the required policy standards Number of non-residential developments not achieving BREEAM ‘excellent’ standards |
|
ID.11 |
Water Supply and Wastewater Infrastructure |
None – no specific indicators are associated with this policy |
|
ID.12 |
Multifunctional Sustainable Urban Drainage Systems |
Number of major planning permissions not including on-site SuDS |
|
ID.13 |
Green and Blue Infrastructure |
Planning permissions that do not achieve the outlined Urban Greening Factor Planning Planning permissions that do not achieve the outlined Tree Canopy Cover requirement |
|
ID.14 |
Open Space, Play, Recreation and Community Growing Spaces |
Planning permissions that result in the loss, reduction or adverse impact of existing open space, play, recreation and community growing spaces Planning permissions which result in an increase in open space, play, recreation and community growing spaces Planning permissions that do not provide the required Accessible Greenspace thresholds set out in the policy Planning permissions that do not provide the required Allotments and community growing space Planning permissions s that do not provide the required provision for children and teenagers Planning permissions which have had to provide off-site or financial contributions in lieu of on-site provision Number of Local Green Spaces designated within Neighbourhood Development Plans |
|
ID.15 |
Accessibility, Quality and Value of Open Space, Play, Recreation and Community Growing Spaces |
Planning permissions that do not meet the required accessible greenspace catchments Planning permissions that have not met the required catchments for provision for children and teenagers |
|
ID.16 |
Adoption, Ownership and Long-Term Stewardship and Delivery of Public Open Space |
Planning permissions where some or all of the on-site Public Open Space is transferred to a private management company |
|
ID.17 |
Sport, Recreation and Leisure Facilities |
Planning permissions which result in the loss of sport, recreation and leisure facilities Planning permissions which result in new and enhanced sport, recreation and leisure facilities Planning permissions which have had to provide off-site or financial contributions for sport, recreation and leisure facilities |
|
ID.18 |
Community Facilities |
Loss of existing community facilities through new development Provision of new or improved community facilities through new development |
|
ID.19 |
Promoting Arts and Culture |
Loss of existing arts and culture facilities through new development Number of planning permissions that provide for new or improved arts and culture facilities |
|
ID.20 |
Protecting Large Scale Existing Renewable Energy Infrastructure |
Complete or partial loss of existing renewable energy and/or grid connection infrastructure through new development Planning permissions providing repowering, life extension or capacity extension of existing renewable energy infrastructure |
|
ID.21 |
New Large Scale Renewable Energy Generation and Storage |
Provision of new large-scale renewable and low—carbon energy generation and associated energy storage |
|
ID.22 |
Large-scale Renewable Energy Generation and Storage Requirements |
None – no specific indicators are associated with this policy |
|
Chapter 4: Growing the South Warwickshire Economy |
||
|
EC.1 |
Low Carbon Economy |
Number of planning permissions for new employment uses that do not incorporate renewable energy generation |
|
EC.2 |
Existing Employment Sites |
Loss of existing employment land or buildings |
|
EC.3 |
Tourism and Leisure Development |
Loss of existing tourism and leisure uses New and expanded tourism and leisure uses |
|
EC.4 |
Affordable Employment Space |
Number of planning permissions of 1,000 sqm or more (gross) of employment uses which do not provide affordable workspace as part of the overall floorspace of at least 10% with rents at least 20% below average rents. Number of planning permissions where off-site or financial contributions are provided in lieu of on-site provision |
|
EC.5 |
Promoting our Town Centres |
Loss of employment land and buildings within Primary Shopping Areas New and expanded floorspace for town centre uses within Primary Shopping Areas New and expanded office floorspace within town centres |
|
EC.6 |
Town Centre Residential Uses |
Loss of residential uses within town centres |
|
EC.7 |
Employment and Road Freight |
None – no specific indicators are associated with this policy |
|
Chapter 5: Building Homes that Meet the Needs of Our Communities |
||
|
HO.1 |
Housing Size Mix |
The size and tenure of new homes provided |
|
HO.2 |
Space Standards and Accessibility |
The proportion of new dwellings meeting Nationally Described Space Standards The proportion of new homes meeting the prescribed accessibility requirements. |
|
HO.3 |
Affordable Housing Requirements |
The number of new affordable dwelling provided The proportion of affordable homes permitted and completed as a proportion of total housing delivery. Number of planning permissions where off-site provision or a financial contribution is provided in lieu of on-site provision |
|
HO.4 |
Affordable Housing Tenure and Type |
The type and tenure of new affordable homes provided |
|
HO.5 |
Rural Exception Sites |
Number of planning permissions for rural exception sites and the number of homes provided |
|
HO.6 |
Specialised Housing |
The proportion of affordable units that are delivered on specialist housing schemes. The number, size and type of specialist housing units provided |
|
HO.7 |
Build to Rent |
Number of planning permissions for rural exception sites and the number of homes provided |
|
HO.8 |
Protecting Existing Accommodation for the Travelling Community |
Loss of permanent and lawful Gypsy and Traveller pitches, Travelling Showpeople plots and Residential Moorings |
|
HO.9 |
Assessing Planning Applications for new Gypsy and Traveller and Travelling Showpeople Accommodation |
New permanent, temporary and transit Gypsy and Traveller pitches and Travelling Showpeople plots |
|
HO.10 |
Gypsy and Traveller and Travelling Showpeople site design |
None – no specific indicators are associated with this policy |
|
HO.11 |
Accommodation for Boat Dwellers |
New permanent residential moorings |
|
HO.12 |
Self-Build and Custom-Build Housing |
The number, size and type of new self and custom build homes provided including the location and size of site they are on The number of self and custom build homes required (as shown by the Custom and Self Build Registers) |
|
HO.13 |
Homes in Multiple Occupancy and Student Accommodation |
Number of planning permissions for student accommodation and Homes in Multiple Occupation |
|
Chapter 6: Achieving a Net Zero and Climate Resilient South Warwickshire |
||
|
NZ.1 |
Operational Net Zero in New Residential Buildings |
The amount of financial developer contributions to offset any shortfall in achieving net zero energy balance on residential developments |
|
NZ.2 |
Operational Net Zero in New Non-residential Buildings |
The amount of financial developer contributions to offset any shortfall in achieving net zero energy balance on non-residential developments |
|
NZ.3 |
Embodied Carbon |
Number of large scale planning permissions (a minimum of 100 homes or 5000 metres squared of non-residential floorspace) which meet the targets for upfront embodied carbon emissions |
|
NZ.4 |
Energy Performance Improvements in Existing Buildings |
Planning permissions which achieve either EnerPHit certification or the applicable retrofit targets expressed in the UK Net Zero Carbon Buildings Standard for the relevant year of completing the works Planning permissions for major residential developments which follow the latest PAS2035 guidance. |
|
NZ.5 |
Climate Resilient Design |
Number of major planning permissions which don’t comply with the policy expectations |
|
NZ.6 |
Carbon Sinks and Sequestration |
Number of planning permissions which provide off-site provision in lieu of on-site delivery |
|
NZ.7 |
Decentralised Energy Systems ~ Major Development |
The scale and type of decentralised energy systems infrastructure on major planning permissions for residential, commercial, industrial, institutional, leisure and mixed use proposals. |
|
NZ.8 |
Decentralised Energy Systems ~ Minor Development |
The scale and type of decentralised energy systems infrastructure on minor planning permissions for residential, commercial, industrial, institutional, leisure and mixed use proposals. |
|
Chapter 7: Enhancing the Built and Natural Environment of South Warwickshire |
||
|
BN.1 |
Protection of Sites, Habitats and Species |
Planning permissions which result in unacceptable harm to international, national and irreplaceable sites Planning permissions which result in loss or deterioration of locally important biodiversity and geodiversity sites Planning permissions where exceptional circumstances are demonstrated and mitigation and/or compensation is provided |
|
BN.2 |
Local Nature Recovery Strategies |
Delivery of the Plan in accordance with the Warwickshire Local Nature Recovery Strategy through the assessment against criteria a-c as set out in Policy BN.2 |
|
BN.3 |
Biodiversity |
Number of Biodiversity Net Gain units delivered Planning permissions where off-site provision is provided in lieu of on-site provision. |
|
BN.4 |
Trees, Hedges and Woodlands |
Planning permissions affecting trees, hedgerows, woodland and orchards that fall into the categories set out in Policy BN.4 Part A, Section 1. |
|
BN.5 |
Landscape Management and Maintenance |
None – no specific indicators are associated with this policy |
|
BN.6 |
Agricultural Land and Soils |
Proportion and land quantum of planning permissions granted on Best and Most Versatile Agricultural Land |
|
BN.7 |
Health Impact Assessments |
Number and type of planning applications refused on health concerns resulting from the Health Impact Assessment |
|
BN.8 |
Pollution and Environmental Quality |
None – no specific indicators are associated with this policy |
|
BN.9 |
Heritage Assets |
Harm to and loss of designated heritage assets arising through new development |
|
BN.10 |
Conservation Areas, Locally Listed Historic Assets and Archaeology |
Demolition or loss of significance of locally listed historic assets arising through new development Substantial harm to Scheduled Monuments or other archaeological remains of national important and their settings, arising through new development |
|
BN.11 |
Historic Landscapes ~ Registered Parks and Gardens and Registered Village Greens |
Number of planning permissions which affect a Registered Park or Garden or Registered Village Green |
| BN.12 | Sustainability and Heritage Assets |
None – no specific indicators are associated with this policy |
|
BN.13 |
Waterways |
Planning permissions which improve accessibility and a sense of place to the waterways of South Warwickshire Planning permissions which provide new mooring and facilities for boat dwellers Planning permissions for new culverts, and the removal of existing culverts |
|
BN.14 |
Alterations to Existing Buildings |
Loss of homes resulting from conversion and change of use to other uses |
|
BN.15 |
Advertisements |
None – no specific indicators are associated with this policy |
|
BN.16 |
Parking |
None – no specific indicators are associated with this policy |
|
BN.17 |
Road Safety |
None – no specific indicators are associated with this policy |