Village Housing Options and Settlement Boundaries

Search representations

Results for Gladman Developments search

New search New search

Support

Village Housing Options and Settlement Boundaries

1) Land to the east of Church Lane

Representation ID: 61368

Received: 20/01/2014

Respondent: Gladman Developments

Agent: Stansgate Planning

Representation Summary:

-The respondent controls the land and supports the allocation of the site and can confirm the suitability, achievability and availability of the site.
-The land to the west of Church Lane and immediately east of Church Lane is included as integral part of their proposals as public open space.
-Detailed assessment has been undertaken and demonstrates a developable area of 5.4 hectares can be achieved with a site capacity of more than 100 houses.
-The respondent has carried out additional assessments on the preferred option site regarding; agricultural, archaeology, ecology, flood risk, heritage, transport and landscape and visual impact.

Full text:

see attached

Attachments:

Object

Village Housing Options and Settlement Boundaries

Indicative Settlement Boundary

Representation ID: 61615

Received: 20/01/2014

Respondent: Gladman Developments

Agent: Stansgate Planning

Representation Summary:

-The proposed boundary excludes an area between existing housing and the church and the preferred option site. In other parts of the settlement such open space is included within the settlement boundary and to be consistent it should be included. Gladman Developments control the land and have prepared a Development Framework Plan that identifies this land as open space and indicates the area that should be included in the settlement boundary.

Full text:

see attached

Attachments:

Support

Village Housing Options and Settlement Boundaries

Revised Development Strategy

Representation ID: 61617

Received: 20/01/2014

Respondent: Gladman Developments

Agent: Stansgate Planning

Representation Summary:

-Gladman support the Council's decision to direct development to the main urban areas and the sustainable Primary Service Villages.

Full text:

see attached

Attachments:

For instructions on how to use the system and make comments, please see our help guide.