Issue and Options 2023

Search form responses

Results for Weston Under Wetherley Parish Council search

New search New search
Form ID: 80482
Respondent: Weston Under Wetherley Parish Council

Nothing chosen

Q-V3.1 & 3.2 – Vision and Strategic Objectives: We believe that the Vision and Strategic Objectives should specifically state that avoiding development on greenbelt land will be prioritised at all stages of the plan development. This is not currently the situation with a heavy (unjustified) bias towards development in the greenbelt. The reasoning for this is that the greenbelt in local area has a vital importance in preventing urban sprawl (especially creeping sprawl towards Coventry) and keeping land permanently open. The protection of greenbelt should be given higher priority.

Form ID: 80484
Respondent: Weston Under Wetherley Parish Council

Q-S3.1 - Urban Capacity Study: We feel that the use of Brownfield sites should be prioritsed and that where Brownfield development is not possible, then development should not occur in Greebelt land. In particular, we do not feel that the “call for sites” approach sufficiently prioritises the identification of non greenbelt brownfield or greenfield sites, these should be actively sought out. We feel the consultation document is heavily biased towards development in the greenbelt North of Leamington and this should be avoided, especially when only 1/3 of the plan area is greenbelt. We feel that appropriately planned development from the outset will avoid the need for greenbelt development in “exceptional circumstances”. Greenbelt development must be avoided as an absolute priority.

Form ID: 80485
Respondent: Weston Under Wetherley Parish Council

QS4.1 Growth of existing settlements – Growth of existing settlements should only be considered where it does not require development in the greenbelt. Previous growth of existing settlements in non-greenbelt locations should not prevent further development and infrastructure should be invested to support further non-greenbelt development. Where growth of existing settlements cannot be assured without using greenbelt land, alternative solutions should be considered that do not involve development in greenbelt land. Q-S5.2 - New Settlements: We feel that it is wholly unacceptable to consider the development of a new settlement within greenbelt land. There are not exceptional circumstances to doing so. It is unacceptable that despite the NPPF principles, multiple new settlement locations are illustratively suggested in the current consultation document. If a new settlement is to be considered, this should only be in non-greenbelt land. There are ample non-greenbelt options for new settlements. A new settlement in non-greenbelt land should be prioritised over any other development options in greenbelt land. New infrastructure can be developed to support such a non-greenbelt site. Q-S5.3 – Rail Corridors. We feel that there is substantial scope to include development alongside rail corridors outside of the greenbelt. The plan outlines that an indicative 6000 new homes would be sufficient to support a new rail station, and there is ample geographical options to achieve this outside of the greenbelt. Additionally, this would reduce the likelihood of overcrowding existing areas/stations in locations with existing stations in the Greenbelt. Development in North Leamington is not appropriate to use Leamington Spa station as there is already heavy traffic congestion in people moving from the North to the South of the town. A new station in the greenbelt is unacceptable. The Climate Emergency must not be used as justification to develop on greenbelt land, this is a weak argument as there are other ways of mitigating against the climate emergency without developing on greenbelt. Q-S7.2 –For the remaining spatial growth options, we feel it is important that the priority is to avoid developing greenbelt land. The need for greenbelt development in each spatial option should be considered before selecting a specific spatial growth option. This is needed to fulfil NPPF “exceptional circumstances” principle. It is not acceptable to select a spatial option without first considering the need to develop greenbelt to deliver that option. Instead, it should be assessed whether another spatial growth option could be selected that requires less (or no) greenbelt development, and that option with the least greenbelt development should be selected, even if more infrastructure work is needed. Retrospectively claiming exceptional circumstances are needed because there is no other way to meet a selected spatial growth option is not acceptable. The climate emergency should not be used as a justification to develop greenbelt land. Q-S8.1 – Settlements falling outside the chosen growth strategy: We do not feel a threshold approach to small scale development is appropriate in greenbelt areas. We do not feel the plan should allow for more small scale growth developments to come forward in greenbelt areas. Q-S10 – Any other comments: We are specifically opposed to development of land in the greenbelt areas in/around Weston under Wetherley and other similar small greenbelt villages due to the impact on the rural character of the area of the North Leamington Greenbelt. The Climate Emergency must not be used as justification to develop on greenbelt land. This is a weak and bizarre argument. There are other ways of mitigating against the climate emergency without developing on greenbelt land, which itself is truly harmful. There is no option to comment on issue S6 within the plan (A review of the greenbelt boundaries). We do not feel it is necessary or appropriate to redefine greenbelt boundaries. This issue should not have been included within the consultation without the option to comment. The number of respondents (561 responses) to the first consultation was exceptionally small indeed and can in no way be considered representative of the population area. It is possible given these very small numbers they were from developers or others who would directly benefit from such development (there were almost as many sites submitted as responses received!). This tiny number of respondents is so small it should not be used as a basis for decision making and should not be used to justify development or review of the greenbelt.

For instructions on how to use the system and make comments, please see our help guide.