Support
Developer Contributions SPD
Representation ID: 71778
Received: 21/02/2020
Respondent: Barton Willmore
Representation Summary:
Support for the site viability section. The SPD includes reference to the Council’s acceptance that in cases where a scheme is unable to meet the required S106 contributions the cumulative benefit of the scheme will be a material consideration