Support

Developer Contributions SPD

Representation ID: 71729

Received: 20/02/2020

Respondent: Barton Willmore (now Stantec)

Representation Summary:

Support for the site viability section. The SPD includes reference to the Council’s acceptance that in cases where a scheme is unable to meet the required S106 contributions the cumulative benefit of the scheme will be a material consideration