Object
Sustainability Appraisal - Publication Draft
Representation ID: 66424
Received: 27/06/2014
Respondent: Hazel and Robin Fryer
Representation Summary:
Paragraph 4.52, 5.51 & 5.65 - SA Objectives 5 & 9
a) Thickthorn housing; the surface water drainage problems that will result from this large area of development has not been considered and currently all the run-off from the fields is into a small stream flowing through the village of Ashow. In recent years serious flooding has occurred and a 400mm diameter bypass pipe was installed but this will be totally inadequate to take the increased flow from the development.
b)This aspect of sustainable development for the site has not been evaluated.
Full text:
see attached