Object
Publication Draft
Representation ID: 64530
Received: 26/05/2014
Respondent: Mr Richard Thwaites
Legally compliant? No
Sound? No
Duty to co-operate? Yes
The preferred option for development within Hampton Magna has been overwhelmingly rejected by the residents.
The requirement for the design, layout and scale of the development to be made in collaboration with local residents cannot possibly be fulfilled.
The phasing requirement of the development will subject the existing residents to 15 years of construction traffic through small estate roads.
The local Plan is ignoring the availability of previously developed land in Hampton Magna.
The Maple Lodge site is preferred by the residents and would easily allow construction traffic access via non residential roads, to be phased with minimal disturbance to existing residents.
The preferred option for development within Hampton Magna has been overwhelmingly rejected by the residents.
The requirement for the design, layout and scale of the development to be made in collaboration with local residents cannot possibly be fulfilled.
The phasing requirement of the development will subject the existing residents to 15 years of construction traffic through small estate roads.
The local Plan is ignoring the availability of previously developed land in Hampton Magna.
The Maple Lodge site is preferred by the residents and would easily allow construction traffic access via non residential roads, to be phased with minimal disturbance to existing residents.