Support
Preliminary Draft Charging Schedule
Representation ID: 63307
Received: 13/08/2013
Respondent: King Henry VIII Endowed Trust (Warwick)
Agent: AMEC
Representation Summary:
Welcomes the fact that the viability study is based on current market conditions and takes into account high infrastructure costs for strategic sites. The Trust is supportive of WDC's intention.
Supports a separate charging rate on strategic sites and selection of the lower element of the ranges identified. The reference to an instalment policy is welcomed.
Full text:
see attached