Support

Preliminary Draft Charging Schedule

Representation ID: 63307

Received: 13/08/2013

Respondent: King Henry VIII Endowed Trust (Warwick)

Agent: AMEC

Representation Summary:

Welcomes the fact that the viability study is based on current market conditions and takes into account high infrastructure costs for strategic sites. The Trust is supportive of WDC's intention.

Supports a separate charging rate on strategic sites and selection of the lower element of the ranges identified. The reference to an instalment policy is welcomed.

Full text:

see attached

Attachments: