Object

Revised Development Strategy

Representation ID: 54518

Received: 29/07/2013

Respondent: Miss Carol Duckfield

Representation Summary:

This plan still fails to address the shortfalls of the current infrastructure let alone look at the long term needs of the Warwick and Leamington.
There needs to be some means of linking the two main routes between the towns to provide flexibility and better flow control rather than forcing all traffic into the congestion hot spots at either end. Consideration also needs to be given to provide a means of linking Whitnash and Cubbington/Lillington as the current situation forces all traffic either into town or to use M40/A46 routes that already have difficulties with the current levels of traffic

Full text:

This plan still fails to address the shortfalls of the current infrastructure let alone look at the long term needs of the Warwick and Leamington.
There needs to be some means of linking the two main routes between the towns to provide flexibility and better flow control rather than forcing all traffic into the congestion hot spots at either end. Consideration also needs to be given to provide a means of linking Whitnash and Cubbington/Lillington as the current situation forces all traffic either into town or to use M40/A46 routes that already have difficulties with the current levels of traffic