Object
Revised Development Strategy
Representation ID: 53560
Received: 25/07/2013
Respondent: Hampton Magna Action Group
Representation Summary:
We do not accept that this level of housing is really necessary. The constantly changing number perceived as required has escalated 1400 in just a year. The uncertainty and time frame of the plan a long way hence leads means the level of housing needs reconsidering alongside other regions
Full text:
We do not accept that this level of housing is really necessary. The constantly changing number perceived as required has escalated 1400 in just a year. The uncertainty and time frame of the plan a long way hence leads means the level of housing needs reconsidering alongside other regions