Object
Publication Draft
Representation ID: 4986
Received: 08/10/2009
Respondent: Mr Graham Harrison
Representation Summary:
NO - The options are not confined to how contributions will be sought. There are also options (or should be) about what infrastructure will be needed especially in relation to the new development areas. Without the infrastructure Delivery Plan, it is impossible to reach a reasoned response to any of the proposed development areas and THIS IS A MAJOR WEAKNESS OF THE PREFERRED OPTION CONSULTATION.