Object
Preferred Options
Representation ID: 49506
Received: 12/07/2012
Respondent: Mr Arthur Deeming
Representation Summary:
The infrastructure is not adequate enough to sustain new growth. There would be increased pressure on the flood plain which would heighten the flood risk.
The drainage system is already overstreched.
Full text:
As scanned.