Object

Preferred Options

Representation ID: 48656

Received: 26/07/2012

Respondent: Mr Brian Lewis

Agent: Stansgate Planning

Representation Summary:

The provision of 10,800 dwellings within the District between 2011 and 2029 is insufficient and will not provide sufficient housing to meet identified needs. The level should be increased to in the region of 13,000 for the same period. the reasons for this are:
-a jobs led strategy would require significantly more houses
-we should be planning over the whole plan period not just taking account of current lower levels of jobs growth
-there is sufficient land available in the SHLAA for higher growth
-the proposed level of growth doesn't allow enough for affordable housing

Full text:

See attachments

Attachments: