Object

Preferred Options

Representation ID: 48239

Received: 27/07/2012

Respondent: PJPlanning

Representation Summary:

The Proferred options relies too heavily on windfalls (33%) - this is not consistent with a plan-led system.
There is no justification for the allocation of 500 homes to category 1 villages and it is not therefore clear how the plan will achieve sustainable developent
The proposals for green belt changes in and around village needs to be justified through exceptional circumstances. It seem unlikely that these can be demonstrated as there are sustainable locations outside the green belt which haven't been adequately explored

Full text:

See attachment