Object
Preferred Options
Representation ID: 47982
Received: 23/07/2012
Respondent: Mr John Harlow
Representation Summary:
I object to your proposed 'Preferred Option' plans, because you could have adopted those prepared in 2009 for the Core Strategy Plan, which did not require the use of precious Green Belt land. These previous plans would have been much less expensive as they did not require the extravagance of a whole new infrastructure.
Full text:
Scanned Letter