Support

Preferred Options

Representation ID: 47405

Received: 02/08/2012

Respondent: Mr Raymond Bullen

Representation Summary:

I support phasing. Phase 1 should be brownfield only including proactive regeneration, mainly in urban locations. Phase 2 should be the same.
If the target number of houses is reduced to match the requirement that the latest data shows to be necessary then only 292 homes need to be built in greenfield areas. This should be the last phase and only happen if the population numbers show that it is necessary.

Full text:

I support phasing. Phase 1 should be brownfield only including proactive regeneration, mainly in urban locations. Phase 2 should be the same.
If the target number of houses is reduced to match the requirement that the latest data shows to be necessary then only 292 homes need to be built in greenfield areas. This should be the last phase and only happen if the population numbers show that it is necessary.