Object

Preferred Options

Representation ID: 46778

Received: 23/07/2012

Respondent: Mrs Cathy Jorgensen

Representation Summary:

Norton Lindsey does not have the facilities and road- and transport infrastructure to accommodate the proposed number of homes and it being identified as a Category 2 village is at odds with PO3 and the requirement for housing to be built close to existing shops, schools (with free capacity), leisure facilities, workplaces. An increase of 30-80 houses would be entirely disproportionate to the current size of the village and would as a result have a significant impact on the current environment and inhabitants.

Full text:

Norton Lindsey does not have the facilities and road- and transport infrastructure to accommodate the proposed number of homes and it being identified as a Category 2 village is at odds with PO3 and the requirement for housing to be built close to existing shops, schools (with free capacity), leisure facilities, workplaces. An increase of 30-80 houses would be entirely disproportionate to the current size of the village and would as a result have a significant impact on the current environment and inhabitants.