Object

Preferred Options

Representation ID: 46360

Received: 04/07/2012

Respondent: Mrs Rachel Greasby

Representation Summary:

At peak times the traffic is heavy on Birches lane with long tailbacks and delay, adding another 700+ houses would cause great strain.

Inadequate detail provided as to the infrastructure improvements, notably schools and traffic management, required for this site.

The addition of so many houses would significantly and detrimentally impact on the character and life enjoyment of the town.

Negative impact on the existing countryside, flora/fauna the feel of Kenilworth being a small town.

Full text:

At peak times the traffic is heavy on Birches lane with long tailbacks and delay, adding another 700+ houses would cause great strain.

Inadequate detail provided as to the infrastructure improvements, notably schools and traffic management, required for this site.

The addition of so many houses would significantly and detrimentally impact on the character and life enjoyment of the town.

Negative impact on the existing countryside, flora/fauna the feel of Kenilworth being a small town.