Object

Publication Draft

Representation ID: 310

Received: 21/07/2009

Respondent: Mr Nigel Warden

Representation Summary:

It's the easy option is to use Green Belt land, but worse to identify these locations then stop building mid phase like the Jaguar Whitley site. Phase 1 complete - Phases 2 & 3 postponed??? How were the figures for manufacturing requirements arrived at? There are plenty of Brownfield sites ready to re-develop within coventry/Warwickshire (Peugeot, Jaguar, Dunlop, Courtaulds, etc) if needed. The manufacturing industry has suffered massive decline over the past few decades, so why the sudden need to increase manufacturing capacity now? Shutting the gate after the horse has bolted springs to mind!!! Save our Green Belt!!!