Publication Draft

Search representations

Results for Myton School search

New search New search

Support

Publication Draft

DS12 Allocation of Land for Education

Representation ID: 64438

Received: 22/05/2014

Respondent: Myton School

Representation Summary:

Myton School and Campion School will be providing a 2 secondary school solution for the proposed housing developments contained within the local plan that are located within the current Myton School and Campion School priority areas. In addition, Myton School will look to build a primary school (2 form entry plus nursery) adjacent to its expanded secondary school.
To accommodate the expansion in student numbers Myton School will require an extended site of 17 hectares (including 2 hectares for the primary school). Myton School requires 9.18 hectares of additional land donated to the south of its site for education provision

Full text:

The Myton School expansion is in conjunction with the agreed 2 secondary school solution with Campion School to address the increase in student numbers arising from housing developments contained within the Local Plan that are located within the current Myton School and Campion School priority areas.
Myton School will expand it's current school capacity from 1,700 students (including 325 post-16) up to 2,400 (including 425 post-16), subject to the appropriate DfE approval. Campion School will expand its current school capacity from 885 (including 100 post-16) up to 1,400 (including 200 post-16), subject to the appropriate DfE approval.
Campion School requires no additional land to expand but will require s106 / CILL funding.
The Myton School site will need to increase from the current 12.52 hectares up to 15 hectares for the secondary school provision. Myton School will sell 4.7hectares of its own land (at the north of it's site running parallel to Myton Road) to part-fund this project. Myton School will re-use some of its current building stock and will build additional capacity to create a learning campus in the south area of its site. Myton School requires an additional land allocation to the south of its site of 7.18 hectares to deliver its part of the secondary school solution.
Myton School will also look to redesignate from an 11-18 school to a 3-18 school (subject to DfE approval) and build a 2 form entry (plus nursery) primary school next to the secondary school. Myton School requires a further 2 hectare donation of land to accommodate the primary school.
The total Myton School site will total 17 hectares (including 2 hectares for primary provision). This will comprise 7.82hectares of current land owned by Myton School and 9.18 hectares of donated land for educational provision due to the local plan delivery.

Support

Publication Draft

2. Leamington, Warwick and Whitnash

Representation ID: 64440

Received: 22/05/2014

Respondent: Myton School

Representation Summary:

The Myton school extended site requires to be 17 hectares (including 2 hectares for a 2 form entry plus nursery primary school). The northern boundary of the Myton School site (running parallel to Myton Raod) is defined to ensure the reuse of some of the current Myton School buildings when it expands to become a learning campus for up to 2,400 secondary students (including 425 post-16) and 450 2 form entry primary school (including nursery).

Full text:

The Myton school extended site requires to be 17 hectares (including 2 hectares for a 2 form entry plus nursery primary school). The northern boundary of the Myton School site (running parallel to Myton Raod) is defined to ensure the reuse of some of the current Myton School buildings when it expands to become a learning campus for up to 2,400 secondary students (including 425 post-16) and 450 2 form entry primary school (including nursery).

For instructions on how to use the system and make comments, please see our help guide.