Preferred Options

Search representations

Results for Commercial Estate Group and the McGregor Family search

New search New search

Object

Preferred Options

PO1: Preferred Level of Growth

Representation ID: 49357

Received: 08/08/2012

Respondent: Commercial Estate Group and the McGregor Family

Number of people: 2

Agent: Broadway Malyan

Representation Summary:

Promoting sustainable economic growth is a key priority for the planning system. The NPPF has a clear presumption in favour of sustainable development and seeks to boost significantly the supply of housing - requiring LPAs to meet full, objectively assessed needs. NPPF has a similar stance in relation to business needs. PO1 housing growth figure is too low. It should be based on employment growth and should seek to reduce in-commting to reduce travel to work. Growth needs to go beyond the 715pa set out in the SHMA and the employment led figure. Total of 14,400 homes should be provided

Full text:

See attached

Support

Preferred Options

PO3: Broad Location of Growth

Representation ID: 49386

Received: 08/08/2012

Respondent: Commercial Estate Group and the McGregor Family

Number of people: 2

Agent: Broadway Malyan

Representation Summary:

Agree that growth should be concentrated within or on the edge of urban areas as these are the most sustainable locations. Suppot the approach of distributing development across the District as this provides choice and competition in line with para 47 of the NPPF.

Land at Blackdown supports this approach being on the edge of urban area; avoids coalesence; and helps ensure distributed growth.

Full text:

See attached

Support

Preferred Options

Blackdown

Representation ID: 49387

Received: 08/08/2012

Respondent: Commercial Estate Group and the McGregor Family

Number of people: 2

Agent: Broadway Malyan

Representation Summary:

Support allocation of Blackdown for 1170 dwellings and employment land and support its inclusion in phases 2 and 3 for deliverability.

Concerns about locating 6000 new dwellings to the south and east due to infrastructure pressure - particularly relating to the M40 junctions. The concentration of development in the area could prejudice deliverability. Therefore development to the north is justified.

Full text:

See attached

Support

Preferred Options

PO8: Economy

Representation ID: 49388

Received: 08/08/2012

Respondent: Commercial Estate Group and the McGregor Family

Number of people: 2

Agent: Broadway Malyan

Representation Summary:

Support allocation of employment land north of Leamington. This is consistent with the NPPF. Blackdown is an appropriate location for this being adjacent to the A452. This allocation would help ensure business needs are met and would address employment deficit in the north of Leamington. Employment and a park and ride along with residential would contribute towards the creation of sustainable, mixed communities.


Full text:

See attached

Support

Preferred Options

PO16: Green Belt

Representation ID: 49616

Received: 08/08/2012

Respondent: Commercial Estate Group and the McGregor Family

Number of people: 2

Agent: Broadway Malyan

Representation Summary:

It is suggested that 14400 houses are required. Altering green belt boundaries is required to accomodate this. Although the green belt study suggested the Blackdown was not suitable for further study, it has similr characteristics to the land to west and is contained by an established road network which provide defensible boundaries.

Removing land at Blackdown from the green belt is consistent with para 85 of NPPF.

Housing delivery is a priority - including a veriety of sites and locations. Reviewing the green belt boundaries facilitates this.

Full text:

See attached

Support

Preferred Options

Map 5: Possible Transport Infrastructure

Representation ID: 49618

Received: 08/08/2012

Respondent: Commercial Estate Group and the McGregor Family

Number of people: 2

Agent: Broadway Malyan

Representation Summary:

Support the proposed park and ride (P&R) in the broad location of Blackdown. The Blackdown area is an appropriate location for this. The P&R is in the Coventry north-south corridor and would conribute towards sustainable transport. The proposed park and ride would help alleviate some of the congestion problems.

the P&R is in accordance with NPPF transport policies. It would improve choice of travel options and reduce greenhouse gas emissions. It would help ensure the long term viability of development at Blackdown

Full text:

See attached

Support

Preferred Options

PO10: Built Environment

Representation ID: 49619

Received: 08/08/2012

Respondent: Commercial Estate Group and the McGregor Family

Number of people: 2

Agent: Broadway Malyan

Representation Summary:

Fully committed to using the garden suburb principles of housing and urban design and want to deliver high quality place making and the creation of sustainable mixed communities

Full text:

See attached

For instructions on how to use the system and make comments, please see our help guide.