Preferred Options 2025

Search representations

Results for Wythall Parish Council search

New search New search

Other

Preferred Options 2025

Do you agree with the approach laid out in Draft Policy Direction 5- Infrastructure Requirements and Delivery?

Representation ID: 94619

Received: 03/03/2025

Respondent: Wythall Parish Council

Representation Summary:

It is the opinion of Wythall Parish Council that traffic from New Settlement sites A1 and A2 will exacerbate the traffic on the existing local road network around junctions 3 and 3a of the M42 which already suffer tailbacks at busy periods. Is there any consideration of a new motorway junction being built to service the new settlements?

Other

Preferred Options 2025

Do you broadly support the proposals in the Vision and Strategic Objectives: South Warwickshire 2050 chapter? If you have any additional points to raise with regards to this chapter please include them here.

Representation ID: 94629

Received: 03/03/2025

Respondent: Wythall Parish Council

Representation Summary:

A secondary school to support the educational needs of the new residents in new settlement sites A1 and A2 will be a major requirement; Worcestershire is known to have a lack of secondary school places and it can only be assumed that South Warwickshire is in a similar position. The apparent lack of proposals for a new local secondary school (or extended existing secondary school) within the catchment area of these new settlements will mean that school traffic will exacerbate congestion in surrounding areas, as new residents will need to commute out of area to reach an alternative secondary school.

For instructions on how to use the system and make comments, please see our help guide.