Preferred Options 2025

Search representations

Results for Chesterton and Kingston Parish Meeting search

New search New search

Other

Preferred Options 2025

Do you broadly support the proposals in the Vision and Strategic Objectives: South Warwickshire 2050 chapter? If you have any additional points to raise with regards to this chapter please include them here.

Representation ID: 102968

Received: 07/03/2025

Respondent: Chesterton and Kingston Parish Meeting

Representation Summary:

Those proposals that look at development close to Coventry and Kenilworth where there has been less development relative to area and population than Warwick and Leamington are supported.

There must be adequate infrastructure. Easily accessible public transport access should be a priority. Road capacities in Warwick and Leamington are at capacity. The M40 corridor focus is not supported for development.
Proposals should be not be based on green belt / areas of agriculture. We do not support development that changes the character of immediate surrounding areas.
We support developments within walking distance of railway stations. eg Kenilworth, Warwick Parkway, Hatton

Other

Preferred Options 2025

Do you broadly support the proposals in the How to Have Your Say chapter? If you have any additional points to raise with regards to this chapter please include them here.

Representation ID: 102972

Received: 07/03/2025

Respondent: Chesterton and Kingston Parish Meeting

Representation Summary:

This consultation is not geared to the general public. It is not user friendly and is difficult for the layman to engage. Attendance at one of the public sessions proved to be unsatisfactory as it was not hosted well...difficult to discuss how the sites were arrived at and clear that the preferred sites are rather more arbitrary. How can land along side railway lines with no railway stations and only road infrastructure I.E Preferred site F1 be deemed to meet sustainability objectives?

Yes

Preferred Options 2025

Strategic Growth Location SG01 Question

Representation ID: 102979

Received: 07/03/2025

Respondent: Chesterton and Kingston Parish Meeting

Representation Summary:

This an area that is currently being developed with the construction of HS2 and there will be land that is part of the construction of HS2 but will become available for strategic development. It is close to Coventry and will be close to the new railway station at Kenilworth.

No

Preferred Options 2025

Strategic Growth Location SG11 Question

Representation ID: 102986

Received: 07/03/2025

Respondent: Chesterton and Kingston Parish Meeting

Representation Summary:

This area along Harbury Lane overlaps potential new settlement site X2. It extends south east of the Fosseway along Harbury Lane to include land that runs up to the 17th century Grade 1 ancient monument Chesterton Windmill. This area is completely dependent on road transport. There is flooding along Harbury Lane on a regular basis. The landscape from the Fosseway up to the windmill ( Site ID 612) is very steep and is an area with many and significant archaeological features.

No

Preferred Options 2025

Potential Settlement Question X2

Representation ID: 102990

Received: 07/03/2025

Respondent: Chesterton and Kingston Parish Meeting

Representation Summary:

Harbury Lane and the Fosseway are single carriageway roads running along the northern and eastern boundaries of this site. Harbury Lane is prone to flooding with water run off from the land immediately to the south of Harbury Lane. This flood risk would be worsened with new settlement development.

There are significant archaeological remains in the area on the land to the south of Harbury Lane and either side of the Fosse Way. It is a sensitive area.

There is currently Solar Farm construction on 234 acres on part of X2 (Chesterton Fields Farm) south east quadrant of X2.

No

Preferred Options 2025

Do you agree with the approach laid out in Draft Policy Direction 2 - Potential New Settlements?

Representation ID: 103054

Received: 07/03/2025

Respondent: Chesterton and Kingston Parish Meeting

Representation Summary:

New settlements should be focussed on South Coventry where the infrastructure by road and rail is more sustainable

Yes

Preferred Options 2025

Do you agree with the approach laid out in Draft Policy Direction 3- Small Scale Development, Settlement Boundaries and Infill Development?

Representation ID: 103075

Received: 07/03/2025

Respondent: Chesterton and Kingston Parish Meeting

Representation Summary:

Small existing settlements without infrastructure should not be developed for anything other than small scale development

No

Preferred Options 2025

Do you agree with the approach laid out in Draft Policy Direction 4- Accommodating Growth Needs Arising from Outside South Warwickshire?

Representation ID: 103088

Received: 07/03/2025

Respondent: Chesterton and Kingston Parish Meeting

Representation Summary:

There should be a priority to develop brown belt land in Coventry and the West Midlands before any further development in South Warwickshire and Leamington and Warwick in particular.

Other

Preferred Options 2025

Do you agree with the approach laid out in Draft Policy Direction 5- Infrastructure Requirements and Delivery?

Representation ID: 103162

Received: 07/03/2025

Respondent: Chesterton and Kingston Parish Meeting

Representation Summary:

The land grab of HS2 through the area with environmental damage and landcsape shows how damaging virgin infrastucture can be. Any development on M40 junctions should not be planned.

No

Preferred Options 2025

Do you agree with the approach laid out in Draft Policy Direction 6- Safeguarding land for transport proposals?

Representation ID: 103176

Received: 07/03/2025

Respondent: Chesterton and Kingston Parish Meeting

Representation Summary:

There is a need to focus on use of existing infrastructure particularly building public transport infrastucture and utilising rail networks.