Showing comments and forms 61 to 90 of 338

No

Preferred Options 2025

Representation ID: 91914

Received: 27/02/2025

Respondent: Miss Naomi Williams

Representation Summary:

My main objection to this plan is that Wellesbourne does not have the infrastructure to deal with this massive increase in people and buildings. Also The council already has 25 years worth of housing already approved, why is more needed?! To also add the following points:
Significant harm to the character of the landscape
Destruction of Green Belt land and Local Wildlife Sites
Flood risk
Loss of best farmland
Overdevelopment, threatening village status
Lack of educational and health facilities
Increased pollution from vehicles​
Irreversible damage to the area's natural beauty
Significant threat to local wildlife and natural habitats

No

Preferred Options 2025

Representation ID: 91930

Received: 27/02/2025

Respondent: Miss Eloise Fitzpatrick

Representation Summary:

Wellesbourne already struggles with the amount of people who live here, especially with traffic when the market is on. The amount of pollution this will cause is awful. You are getting rid of green spaces and habitats to many animals in our local area.

Yes

Preferred Options 2025

Representation ID: 91938

Received: 27/02/2025

Respondent: Mr James OShea

Representation Summary:

This is a growing suitable and sustainable location which has the relevant infrastructure to work with. It is close to other infrastructure and road network links are within a short distance

No

Preferred Options 2025

Representation ID: 91985

Received: 27/02/2025

Respondent: Mrs Laura Bader

Representation Summary:

I am objecting as a current resident of Hammond Green. We moved to Wellesbourne 2 years ago for the village character, this proposed development will destroy the current village landscape, threatening the community identity.
The Green belt land surrounding the village has a massive impact on quality of life and mental health for our family and for all villagers. Increased traffic congestion through the village and the pollution increase will have a negetive affect on all residents in addition the current infrastructure in the village is under pressure already for the schools and medical facilties.

No

Preferred Options 2025

Representation ID: 91988

Received: 27/02/2025

Respondent: Ms Georgina Hicks

Representation Summary:

There are plenty of other areas of green land you can build on

No

Preferred Options 2025

Representation ID: 91994

Received: 27/02/2025

Respondent: Mrs Susan Hobbs

Representation Summary:

Land is prime productive agricultural land. No rail connectivity. Use of the B4087 towards the A452 is narrow with dangerous bends at Newbold Pacey. Use of A429 towards Junction 15 of M40 is already congested and proposed gravel pits site at Barford will cause more congestion with heavy lorries. During Saturdays and bank holidays all roads around Wellesbourne are gridlocked due to Wellesbourne market. Lack of educational facilities as all local schools are full. Lack of doctors, dentist etc. Significant harm to the character of the landscape and to the village which has already taken more housing than is necessary.

No

Preferred Options 2025

Representation ID: 92003

Received: 27/02/2025

Respondent: Mr Kevin Brown

Representation Summary:

This area has now been developed to a point where the local infrastructure can barely cope. The local school is oversubscribed, as is the dentist. The doctor is already struggling with the significantly increased local population. Road traffic is already a problem and will be exacerbated by development already planned for the Warwick University HRI facility and Wellesbourne airfield.

No

Preferred Options 2025

Representation ID: 92017

Received: 27/02/2025

Respondent: Mrs Anne Brazel

Representation Summary:

Wellesbourne is going to become too big - it is a village and should stay that way. Furthermore the road between Wellesbourne and the Banbury road will b come far too busy. Ashorne is likely to become a rat-run.

No

Preferred Options 2025

Representation ID: 92024

Received: 27/02/2025

Respondent: Mrs Sian Kellaway

Representation Summary:

Significant harm to the character of the landscape
Destruction of Green Belt land and Local Wildlife Sites
Flood risk
Wellesbourne's lack of rail connectivity or network
Loss of farmland especially with solar farms also
Overdevelopment of Wellesbourne threatening its village status
Lack of educational and health facilities
Increased pollution from vehicle movements ​
Irreversible damage to the area's natural beauty
Significant threat to local Wildlife and natural habitats

No

Preferred Options 2025

Representation ID: 92028

Received: 27/02/2025

Respondent: Mr Terence Hobbs

Representation Summary:

No rail connectivity. Land is prime agricultural land. Use of B4087 towards the A452 is narrow with dangerous bends at Newbold Pacey. Use of A429 towards Junction 15 of M40 is already congested, together with proposed sand and gravel site at Barford will cause further congestion with heavy lorries. During Saturdays and bank holidays all roads to Wellesbourne are gridlocked due to Wellesbourne market. Lack of educational facilities as all local schools are at capacity. Lack of doctors,dentists etc. Significant harm to the landscape and character of the village.

No

Preferred Options 2025

Representation ID: 92050

Received: 27/02/2025

Respondent: Mr Ian Harrison

Representation Summary:

The development will have a detrimental impact on the existing environment and communities. It will stretch existing facilities and infrastructure and negatively impact existing residents.

Yes

Preferred Options 2025

Representation ID: 92072

Received: 27/02/2025

Respondent: Mr Robin Broughton

Representation Summary:

Makes sense
Local amenities can cope / thrive
Not green belt

No

Preferred Options 2025

Representation ID: 92082

Received: 05/02/2025

Respondent: mrs angela watkins

Representation Summary:

This suggested distribution park would create more traffic. The local traffic is already horrendous particularly in the mornings and afternoons. The Longbridge roundabout is frequently gridlocked as is the A429 going North and the M40 slipway up to Longbridge.

No

Preferred Options 2025

Representation ID: 92129

Received: 27/02/2025

Respondent: Mr Darren Pinder

Representation Summary:

Traffic volumes through this area are already very high. The roads can be gridlocked by the market at the airfield and development at this scale will lead to an excessive amount of congestion, pollution and noise.

Yes

Preferred Options 2025

Representation ID: 92130

Received: 27/02/2025

Respondent: Mrs Jill Wilson

Representation Summary:

De velopment should be on the north side of SG15 only. No development on south side of SG15 up to the Stratford Road. Keep Charlecote village with its National Trust property separate from Wellesbourne and HRI campus. Don’t merge them all into one.

No

Preferred Options 2025

Representation ID: 92161

Received: 27/02/2025

Respondent: Mrs Anna Wilson

Representation Summary:

Huge concerns over access, wildlife, village traffic, schools full, doctors stretched, village has already doubled in size.
The main concern is increased flooding risks

No

Preferred Options 2025

Representation ID: 92162

Received: 27/02/2025

Respondent: Mrs Anna Wilson

Representation Summary:

Huge concerns over access, wildlife, village traffic, schools full, doctors stretched, village has already doubled in size. The main concern is increased flooding risks

No

Preferred Options 2025

Representation ID: 92181

Received: 27/02/2025

Respondent: Mrs Helen Simms

Representation Summary:

I don’t feel there is enough infrastructure and the roads wouldn’t cope with the amount of traffic. Charlecote already has a lot of traffic due to Charlecote Park and Wellesbourne market.

No

Preferred Options 2025

Representation ID: 92215

Received: 27/02/2025

Respondent: Mrs Karen Dent

Representation Summary:

I am concerned about the impact on our village much of which is a conservation area. The scale of development right up to our borders threatens Charlecote’s village status. We risk being swallowed up by the developments. The proposed developments would significantly damage the character and beauty of the landscape. I urge the council to rethink these plans.

Other

Preferred Options 2025

Representation ID: 92241

Received: 27/02/2025

Respondent: Mr Ed Hargreaves

Representation Summary:

I strongly object to the proposed development off Lighthorne Road near Kineton. This plan violates NPPF policies on sustainable development (para 8), protecting rural landscapes (para 174), and overloading local infrastructure (para 104). The roads cannot support the increased traffic, and essential services will be overwhelmed. This scale of development destroys rural character and contradicts the council’s duty to promote balanced, dispersed growth. Building here prioritizes developer profits over community needs and fails to meet sustainability tests. This must be rejected in favor of a better-planned, infrastructure-led approach.

Other

Preferred Options 2025

Representation ID: 92315

Received: 28/02/2025

Respondent: Harbury Parish Council

Representation Summary:

This extension of Wellesborne will only work if the road infrastructure is vastly better. There is no good public transport links.

Yes

Preferred Options 2025

Representation ID: 92412

Received: 28/02/2025

Respondent: Mr Ted and Zbigniew Jasinski

Representation Summary:

SG15 area is approximately 461Ha and is a prime location for development.
It has a good existing infrastructure and opportunities for employment.
Developing this area would negate much valued green belt land being used, especially as the housing demand in the SWLP can be met by utilising non green belt areas.

Other

Preferred Options 2025

Representation ID: 92457

Received: 28/02/2025

Respondent: Maxine Mayer

Representation Summary:

I attach a technical report submitted for this SG area of the cumulative impact of proposed development on the A429 and M40 J15.

No

Preferred Options 2025

Representation ID: 92772

Received: 01/03/2025

Respondent: Mr John Watts

Representation Summary:

Significant harm to the character of the landscape
Destruction of Green Belt land and Local Wildlife Sites (see Warwickshire Wildlife Trust's objection)
Flood risk
Wellesbourne's lack of rail connectivity
Loss of best and most versatile farmland
Overdevelopment of Wellesbourne threatening its village status
Lack of educational and health facilities
Increased pollution from vehicle movements ​
Irreversible damage to the area's natural beauty
Significant threat to local wildlife and natural habitats

Yes

Preferred Options 2025

Representation ID: 92909

Received: 01/03/2025

Respondent: Mr Ed Molloy

Representation Summary:

Not Green Belt. Extend recently developed areas. Good links to motorways and industry.

No

Preferred Options 2025

Representation ID: 93043

Received: 01/03/2025

Respondent: Ms Joanne Finkel

Representation Summary:

Loss of Green space.
Lack of planning for essential infrastructure eg public transport, swimming pools, schools, hospitals, doctors, shops,
You're building ghettos not communities.

No

Preferred Options 2025

Representation ID: 93073

Received: 01/03/2025

Respondent: Mrs Cathy Kennedy

Representation Summary:

I cannot see enough information to be able to say that this is the right location for growth. The roads in this area are already congested.

Yes

Preferred Options 2025

Representation ID: 93114

Received: 01/03/2025

Respondent: Mrs Naomi McAinsh

Representation Summary:

Housing should be allocated in none greenbelt areas and therefore I think this option would be less of a negative impact on the environment

Yes

Preferred Options 2025

Representation ID: 93156

Received: 01/03/2025

Respondent: Mrs June McAinsh

Representation Summary:

I cannot deny that more housing is needed so this site would provide a good compromise as it would not devastate biodiversity and the greenbelt

No

Preferred Options 2025

Representation ID: 93245

Received: 01/03/2025

Respondent: Pam Coulston

Representation Summary:

Wellesbourne is already suffering with lack of school places, dentists and Dr’s
Flooding is becoming a greater risk with climate change. Parking to use the local shops is also becoming a greater problem which means the shops are not used. The village has all ready expanded by a very large percentage with not enough resources.