Showing comments and forms 61 to 90 of 133

Yes

Preferred Options 2025

Representation ID: 96226

Received: 04/03/2025

Respondent: Mr James Pateman

Representation Summary:

Build housing on non-greenbelt land.

Other

Preferred Options 2025

Representation ID: 96281

Received: 05/03/2025

Respondent: Southam Town Council

Representation Summary:

The overall intention is to maintain the South of Southam as the main industrial and larger employment area with the central environment focused on services and retail with a tendency to smaller businesses and community. Whilst we agree with the inclusion of Southam, we do not agree with all the sites in the group. Please see comments on HELAA results for comments on individual sites within SG12.

No

Preferred Options 2025

Representation ID: 96708

Received: 05/03/2025

Respondent: Mr Adam Taylor

Representation Summary:

Southam has grown so much that it cannot cope with current infrastructure required to make it a sustainable town, adding to this simply adds to the problem.

No

Preferred Options 2025

Representation ID: 96733

Received: 05/03/2025

Respondent: Long Itchington Parish Council

Representation Summary:

This would change the nature of Southam as a very small market town to its detriment

Other

Preferred Options 2025

Representation ID: 96752

Received: 05/03/2025

Respondent: Alcester Town Council

Representation Summary:

Alcester Town Council, Arrow with Weethley Parish Council, Kinwarton Parish Council, Wixford Parish Council and Great Alne Parish Council (together referred to as Alcester Parishes Group or ‘APG’) has no comment.

Yes

Preferred Options 2025

Representation ID: 96968

Received: 05/03/2025

Respondent: Mrs Margaret Jeffery

Representation Summary:

N/A

Other

Preferred Options 2025

Representation ID: 97204

Received: 05/03/2025

Respondent: Long Itchington Parish Council

Representation Summary:

Little consideration given to the role Southam plays within the cluster of nearby village settlements. If Southam expands significantly, there will be enormous pressure on the only two GP surgeries which serve Southam and many other villages; pressure on school places for Southam College is a factor. Public transport is poor. Real danger of over-whelming the facilities of local villages by expansion of Southam. Long Itchington is close to Southam; residents use our facilities - walking, play parks, community centre, clubs, pubs etc These are already often at capacity. This needs to be given very careful consideration.

No

Preferred Options 2025

Representation ID: 97549

Received: 05/03/2025

Respondent: Nathaniel Coalson

Representation Summary:

The infrastructure in the area is already strained

No

Preferred Options 2025

Representation ID: 97597

Received: 05/03/2025

Respondent: Ms Anna Avino

Representation Summary:

Leamington has already exploded in the past five years. The roads are jammed, the services are overstretched and the vast housing developements and population explosion is changimg the character of the area and making it unpleasant. Infrastructure cannot cope with all the new 29,000 homes being concentrated in a few massive developments in the area particularly south Leamington and Whitnash which is gridlocked. These houses need to be fully dispersed across the whole of warwickshire with every town and village taking a handful of them. This woudl be a fairer, more sustainable appproach as the infratrusture wil alsways play catch-up.

No

Preferred Options 2025

Representation ID: 97598

Received: 05/03/2025

Respondent: Ms Anna Avino

Representation Summary:

Leamington has already exploded in the past five years. The roads are jammed, the services are overstretched and the vast housing developements and population explosion is changimg the character of the area and making it unpleasant. Infrastructure cannot cope with all the new 29,000 homes being concentrated in a few massive developments in the area particularly south Leamington and Whitnash which is gridlocked. These houses need to be fully dispersed across the whole of warwickshire with every town and village taking a handful of them. This woudl be a fairer, more sustainable appproach as the infratrusture wil alsways play catch-up.

Yes

Preferred Options 2025

Representation ID: 97647

Received: 05/03/2025

Respondent: Mrs Melanie Elkington

Representation Summary:

I think a smallish expansion of Southam would not overload the infrastructure of the town plus it isnt on Green Belt

No

Preferred Options 2025

Representation ID: 97712

Received: 05/03/2025

Respondent: Mr Simon West

Representation Summary:

Southam does not currently have the infrastructure such as school places, doctor and dental surgery places to support further growth. The land adjacent to the Banbury road is prone to flooding as witnessed by HS2 archaeological digs done over the last few years becoming ponds during winter and the HS2 line will have an impact on the ground water levels.
Green travel options from Southam (and surrounding area) are severely limited.

Yes

Preferred Options 2025

Representation ID: 97823

Received: 05/03/2025

Respondent: Mr Gary Jeffery

Representation Summary:

N/A

Yes

Preferred Options 2025

Representation ID: 97888

Received: 05/03/2025

Respondent: Mrs Tracey Hasnaoui

Representation Summary:

Non greenbelt land. High sustainability site which would lead to modest expansion of Southam which already has infrastructure in place to support the development

Yes

Preferred Options 2025

Representation ID: 98217

Received: 06/03/2025

Respondent: Mrs Anne Teed

Representation Summary:

Does not include green belt land.

Yes

Preferred Options 2025

Representation ID: 98303

Received: 06/03/2025

Respondent: Mrs Daine Davis

Representation Summary:

Southam is a largely self-contained small town and, as such, can accomode reasonable expansion, provided local amenities are expanded to provide for more people.

Other

Preferred Options 2025

Representation ID: 98408

Received: 06/03/2025

Respondent: Mrs Jacqueline West

Representation Summary:

Only after it has facilities and infrastructure increased to match the growth that has already occured in the last 10-15 years in the town and surrounding area (eg Bishops Itchington, Harbury, Fenny Compton, Long Itchington etc)

Yes

Preferred Options 2025

Representation ID: 98422

Received: 06/03/2025

Respondent: Mr Simon Wright

Representation Summary:

Support development on non-green belt land.

Yes

Preferred Options 2025

Representation ID: 98746

Received: 06/03/2025

Respondent: Mr Doug Wallace

Representation Summary:

N/A

Other

Preferred Options 2025

Representation ID: 98916

Received: 06/03/2025

Respondent: Mrs Jacqueline West

Representation Summary:

Further growth of SG12 only if facilities to match current growth in this area are provided first and there is a financed plan to have these in place as new growth happens. There has been major expansion of Southam, Harbury, Bishops Itchington, Long Itchington and other villages nearby without facilities to support these coming on line.

Also road surface is appalling around Southam, the quality & on-going maintenance of roads must match total usage by developers, residents, workers, suppliers etc.

Yes

Preferred Options 2025

Representation ID: 98998

Received: 06/03/2025

Respondent: Mrs Lynda McCarthy

Representation Summary:

outside designated 'green belt' land

No

Preferred Options 2025

Representation ID: 99037

Received: 06/03/2025

Respondent: Mrs JILL CHAMBERS

Representation Summary:

Southam has already had a large amount of new housing in recent years. Inadequate infrastructure to support more, schools and transport in particular; roads are already congested and busy with HS2 who will be working here for some time to come, school buses park in laybys around the town preventing use by other road users,

Other

Preferred Options 2025

Representation ID: 99079

Received: 06/03/2025

Respondent: Mrs Barbara Atkins

Representation Summary:

I would urge you to assess the effect this may have on surrounding villages which use the GP surgeries in Southam and many other facilities. Increases in housing in Southam cannot cause deficits of infrastructure for residents in surrounding villages, like Long Itchington etc.

Yes

Preferred Options 2025

Representation ID: 99139

Received: 06/03/2025

Respondent: Mr John Jones

Representation Summary:

Development of an area not containing green belt land.
Sustainable area.

Yes

Preferred Options 2025

Representation ID: 99320

Received: 06/03/2025

Respondent: Mr Martin Phelps

Representation Summary:

proportionate expansion of Southam; but no nearby rail links

Yes

Preferred Options 2025

Representation ID: 99433

Received: 06/03/2025

Respondent: Mr Peter Tibbles

Representation Summary:

Appears to be have mediocre service by existing Road Network, Transportation hubs, Healthcare facilities and Education establishments, but with some improvements in capacity and provision, might be suitable

Other

Preferred Options 2025

Representation ID: 99453

Received: 06/03/2025

Respondent: Ms Gillian Padgham

Representation Summary:

The overall intention is to maintain the South of Southam as the main industrial and larger employment area with the central environment focused on services and retail with a tendency to smaller businesses and community. Southam has absorbed a larger number of houses already and the town has grown without the appropriate increase in services or infrastructure, so although I broadly agree with some of the sites in Southam being put forward, I do not agree with all of the sites in group SG12. I will comment on them individually in the HELAA results section.

No

Preferred Options 2025

Representation ID: 99527

Received: 06/03/2025

Respondent: Stratford upon Avon District Council

Representation Summary:

Has already experienced disproportionate growth without corresponding improvements in infrastructure. No rail and no arterial road network. A cycle network to connect it with other local villages within a 4mile radius would be beneficial to Southam's viability.

No

Preferred Options 2025

Representation ID: 99609

Received: 06/03/2025

Respondent: Mrs Jo Thomas

Representation Summary:

Infrastructure not commensurate with suggested building development

Yes

Preferred Options 2025

Representation ID: 99686

Received: 06/03/2025

Respondent: Miss Sabrina Hasnaoui

Representation Summary:

Support expansion of Southam. Meets sustainability criteria due to amenities already being in place, schools, gps and other local facilities. Non green belt land development.