Showing comments and forms 151 to 180 of 1594

Object

Publication Draft

Representation ID: 4414

Received: 25/09/2009

Respondent: M I Clement

Representation Summary:

Current flooding situation will worsen when development increases run-off and prevents absorbtion.
Finham has limited facilities for shopping, healthcare, education, recreational and cultural activities and would be unable to service a large estate.
Public transport sparce and not always reliable. Roads carry heavy traffic at peak times and severe congestion would result from neighbouring development. Restricted access may need to be considered.

Object

Publication Draft

Representation ID: 4418

Received: 25/09/2009

Respondent: Richard Sparkes

Representation Summary:

Where are impact studies for
Traffic
Schooling
Access
Drainage and Sewerage?
When were WCC and Severn Trent consulted? If not, then public consultation is a farce and should be stopped

Object

Publication Draft

Representation ID: 4420

Received: 25/09/2009

Respondent: G M Langston

Representation Summary:

Lack of robustness during planning process - infrastructure, traffic congestion.
No explanation of proposed demographic - Whitnash schools unable to accommodate more children.
Quantative assessments of traffic density undertaken when schools were on holiday - asked to defer this until normal term time - has this been done?
Any informal response to question as to whether sewage treatment works at Longbridge could cope with extra demand?
Associated strategy to develop new business requested - is such a strategy live and financed and how do two strategies dovetail?

Object

Publication Draft

Representation ID: 4426

Received: 29/09/2009

Respondent: J & P Foley

Representation Summary:

More traffic on Harbury Lane - busy and hard to cross now.
More schools, medical centres would be needed.
Strain on public services - public transport, ambulances, fire service, police. Talk of closing some of depots, so how will they cope with more people.
The bridges in Warwick will not be able to cope with extra traffic.
More jobs - not enough for people living here.

Object

Publication Draft

Representation ID: 4431

Received: 25/09/2009

Respondent: Robert Johnson

Representation Summary:

Bringing such a large number of houses to the area south of Warwick Gates will cause problems:
Infrastructure - roads are congested at rush hour in south Leamington - 8,000 more cars will make situation worse.
Emergency services will not be able to cope with increase - have they been consulted?
Increased pollution - breathing problems and listed building cleaning.

Object

Publication Draft

Representation ID: 4439

Received: 25/09/2009

Respondent: JD & CL Mackenzie

Representation Summary:

Object to 4,200 new homes near Harbury Lane, Europa Way and Whitnash
Lack of infrastructure - busy roads, local hospitals, doctor's surgeries, local schools

Support

Publication Draft

Representation ID: 4442

Received: 24/09/2009

Respondent: Andrea Telford

Representation Summary:

Support

Object

Publication Draft

Representation ID: 4463

Received: 25/09/2009

Respondent: Mick & Sandra Coulson

Representation Summary:

Object to development of over 4,000 houses between Warwick Gates and Bishops Tachbrook.
Would overload the area - traffic congestion already a nightmare.
Pressure on schools, doctor's surgeries.

Object

Publication Draft

Representation ID: 4467

Received: 25/09/2009

Respondent: Mr Edward Norris

Representation Summary:

Object to site at Kings Hill
Surrounding area is not able to cope with increase in housing or traffic.

Object

Publication Draft

Representation ID: 4471

Received: 25/09/2009

Respondent: Malkit Ram

Representation Summary:

Object to Kings Hill site:
Inevitable increase in traffic pollution and congestion in surrounding Coventry area.
Scale and effect it will have on schools, shops, GP surgeries and public transport.

Object

Publication Draft

Representation ID: 4476

Received: 18/09/2009

Respondent: Hazel Hier

Representation Summary:

Kings Hill site:
Roads and traffic - chaos if each house has just one extra car.

Comment

Publication Draft

Representation ID: 4482

Received: 23/09/2009

Respondent: Brian Hier

Representation Summary:

Object to Kings Hill site
Need for detailed survey of infrastructure.

Object

Publication Draft

Representation ID: 4484

Received: 24/09/2009

Respondent: Miss P Luckett

Representation Summary:

Object to Kings Hill site:
Schools are already oversubscribed and further demand for pupil places would create problems for all schools in catchment area.
Additional traffic in already congested roads coming into city and requiring access to A45, A46 and Kenilworth Road.

Object

Publication Draft

Representation ID: 4491

Received: 24/09/2009

Respondent: Declan Mee

Representation Summary:

Object to Kings Hill site:
Could not cope with increase in traffic or local services - schools, shops, GP surgery, dental surgery and public transport. Clearly raises road safety issues.

Object

Publication Draft

Representation ID: 4494

Received: 24/09/2009

Respondent: Declan Mee

Representation Summary:

Unbalanced and unhealthy allocation of majority of housing to Coventry, compared to Solihull and Warwick as agreed by sub regional forum. Absurd that Coventry has to build 33,000 houses when Birmingham, a much bigger city has to build 50,000.

Object

Publication Draft

Representation ID: 4496

Received: 30/09/2009

Respondent: Mrs D Matthews

Representation Summary:

Increase in traffic and danger for children going to school. Always a traffic jam along Stoneleigh Road as there is always congestion at bottom of St Martins Road leading to A45. More houses would increase traffic and pollution having effect on health, especially of children.

Object

Publication Draft

Representation ID: 4503

Received: 25/09/2009

Respondent: Mrs E R Matthews

Representation Summary:

Object to housing sites south of Whitnash:
Lack of school spaces and water supply. Infrastructure problems - schools, bridges, access roads, flooding and lack of forethought and awareness of contemporary urban housing and transport developments in and beyond UK.
Need for genuinely affordable housing for existing local population.
Already too much new housing in wrongly designed, laid out and priced areas.

Object

Publication Draft

Representation ID: 4512

Received: 25/09/2009

Respondent: A K McArthur

Representation Summary:

Object to Plan 5:
Infrastructure - allowing developers to implement reasonable infrastructure' appeared to prevail.
Traffic density assessments were carried out during school holidays - requested deferral until term time. Was this implemented?
Capacity of Longbridge sewage treatment works to cope with increase?

Object

Publication Draft

Representation ID: 4516

Received: 30/09/2009

Respondent: Julie and Ronald Hyde and Miles

Representation Summary:

Impact on local roads and parking.
Kenilworth only has auxillary police station which may not be adequate. Fire Station also likely to close.
Warwick hospital's capacity stretched with new developments at Hatton Park, Warwick Gates and adj. A46 at Warwick. Doctors and dentists and local schools of concern.
Need facility of cricket ground and rugby club in the town.

Object

Publication Draft

Representation ID: 4540

Received: 19/09/2009

Respondent: Ms Alison Cox

Representation Summary:

Infrastructure: pressure on schools, hospitals, utility services. Europa Way and Myton Road extremely congested at peak times. Traffic modelling took place during school holiday period when traffic low. Parking at Leamington station limited and not planned to expand. Flooding of homes from field run-off which will be exacerbated by more houses.

Object

Publication Draft

Representation ID: 4550

Received: 22/09/2009

Respondent: Southern Windy Arbour Area Residents' Association

Representation Summary:

Increase use of 'Section 106' Agreements, levy on extension of existing accommodation to improve infrastructure - precedent is Isle of Purbeck.

Object

Publication Draft

Representation ID: 4568

Received: 22/09/2009

Respondent: Mr Peter Lomax

Representation Summary:

Object to Kings Hill site:
Area couldn't cope with increase in traffic, specifically St Martins Road which can become log-jammed with stationary traffic.
Accidents on A45 will become more frequent with vehicles attempting to get onto the island.
School times increase traffic and parking on roads where residents also park causing congestion and risk taking.
What facilities are proposed? - parks, community centre, library, safe cycle routes?

Object

Publication Draft

Representation ID: 4613

Received: 18/09/2009

Respondent: Mrs Sheila Verrier

Representation Summary:

Further land and outlay needed for schools, sports fields and other leisure facilities, shops, churches, car parking including park and ride, and utilities such as sewerage and flood prevention.
How much consultation taken place with Severn Trent for eg. Flooding problems twice in 12 years when expected once in a lifetime.
Travel implications with additional 8,000 more vehicles and detrimental to air quality in towns. No travel impact survey done. Serious effect on M40 junctions and town centres of Warwick and Leamington in both directions. Bridges over and under rivers and canals and railway lines will inevitably be worse. Impact on public transport services as well as emergency vehicles. Those living in towns will be trapped by increased gridlock and historic buildings will be suject to greater traffic damage and air pollution.

Support

Publication Draft

Representation ID: 4615

Received: 23/09/2009

Respondent: Mr S Morris

Representation Summary:

support

Object

Publication Draft

Representation ID: 4623

Received: 30/09/2009

Respondent: MR Dan Saxton

Representation Summary:

Access - Traffic currently unbearable with slow moving traffic on A45 at peak times.
Almost all roads in and out of Finham small or rural with parked cars lining one side and congested further at school times.

Object

Publication Draft

Representation ID: 4647

Received: 23/09/2009

Respondent: Mrs Lisa Blundell

Representation Summary:

Object to Kings Hill site:
Roads are already dangerously busy and grid-locked during peak times and development would make worse.
Insufficient facilities and services to accommodate extremely large number of people would inhabit new houses, such as schools, shops, doctors, dentists and public transport.

Object

Publication Draft

Representation ID: 4654

Received: 23/09/2009

Respondent: Mrs J Rock

Representation Summary:

Traffic congestion which would hugely increase with more children attending schools. How would councils cope with reduced budgets, improving infrastructure?

Object

Publication Draft

Representation ID: 4674

Received: 01/10/2009

Respondent: Mrs C Gribbon

Representation Summary:

Object to housing figure and the development of land south of Warwick, concentrating most of the development into small area.
Road,rail links - sites cannot be considered viable without new rail link from Kenilworth for north Leamington/Kenilworth area, alleviating traffic through Warwick and Leamington town centres. Preferred option would increase traffic along Tachbrook Road to Leamington station which does not have parking capacity.
All major routes from Bishops Tachbrook/Whitnash/Warwick Gates to Leamington and Warwick and motorway are heavily congested in south of town - will impact on local residents and tourism, contravening the strategic objective.
Schools already oversubscribed and Warwick hospital needs to expand. Developments on north of the town would have access to expanded, improved services at teaching hospitals in Coventry.
Survey of infrastructure yet to be carried out. Potential increase of 8000 cars in area with severe effects on carbon emissions.
Planning to build on know flood plain seems ludicrous.

Object

Publication Draft

Representation ID: 4682

Received: 23/09/2009

Respondent: Mrs Jennifer Miremadi

Representation Summary:

Surprised local amentiies considered sufficient support for increased population.

Object

Publication Draft

Representation ID: 4689

Received: 02/10/2009

Respondent: E Holroyde

Representation Summary:

Object to 10000 new homes in Warwick District:
Such a number of houses, especially those sited away from town centres in green belt would need increase in infrastructure, water, gas, electricity, schools, doctors and hospitals. Plan is silent on how this will be achieved.