RDS 8: Sub Regional Employment Site

Showing comments and forms 1 to 30 of 40

Object

Revised Development Strategy

Representation ID: 52622

Received: 29/06/2013

Respondent: Mr Martin Smith

Representation Summary:

Just up the road, with vast areas of Brownfield sites in Coventry awaiting redevelopment (ex.Peugeot, Ryton, & many empty units in & around Coventry Airport), How can it be justifiable to build on "Greenbelt Land"? - IT IS NOT JUSTIFIABLE, if this is a Sub Regional plan.

Full text:

Just up the road, with vast areas of Brownfield sites in Coventry awaiting redevelopment (ex.Peugeot, Ryton, & many empty units in & around Coventry Airport), How can it be justifiable to build on "Greenbelt Land"? - IT IS NOT JUSTIFIABLE, if this is a Sub Regional plan.

Support

Revised Development Strategy

Representation ID: 52715

Received: 05/07/2013

Respondent: Mrs Trudi Wheat

Representation Summary:

5.6.4
I support the idea of sustainable transport through out the district but once again things like the Kenilworth green way will be affected by HS2 and closed for up to 24 months none of this seems to be considered.

Full text:

5.6.4
I support the idea of sustainable transport through out the district but once again things like the Kenilworth green way will be affected by HS2 and closed for up to 24 months none of this seems to be considered.

Support

Revised Development Strategy

Representation ID: 54297

Received: 29/07/2013

Respondent: Keith Wellsted

Representation Summary:

This seems logical. HOWEVER if this is your main development then housing based to the south of Leamington is totally illogical on sustainability grounds

Full text:

This seems logical. HOWEVER if this is your main development then housing based to the south of Leamington is totally illogical on sustainability grounds

Object

Revised Development Strategy

Representation ID: 55194

Received: 29/07/2013

Respondent: Cllr George Illingworth

Representation Summary:

Objects to Section 5.5 and RD8. Following the decision to call in the Gateway application what is the status of Section 5.5 in the RDS? This makes specific reference to the Gateway, though does state that the planning application has yet to be determined. It is not the purpose of the Local Plan to anticipate or favour specific applications and particularly speculative commercial ones in the Green Belt.

If it is intended that land in the Green Belt should be reallocated for employment or similar uses then it should logically be proposed for removal from the Green Belt and re-designation in the same way as has been done for housing in Kenilworth and Lillington.

This will require detailed justification in the same way with a detailed map showing the exact area involved. Leaving the area in the Green Belt until completion would mean applying Green Belt policies which would ultimately be irrelevant and indicates a lack of conviction. If removal cannot be justified at the start then the site must be unsuitable and to consider it as a strategic sub-regional site makes no sense at all.

Full text:

Dave

Following the decision to call in the Gateway application what is the status of Section 5.5 in the Revised Development Strategy in the Draft Local Plan? This makes specific reference to the Gateway, though does state that the planning application has yet to be determined.

It seems to me that it is no purpose of the Local Plan to anticipate or favour specific applications and particularly speculative commercial ones in the Green Belt. If it is intended that land in the Green Belt should be reallocated for employment or similar uses then it should logically be proposed for removal from the Green Belt and re-designation in the same way as has been done for housing in Kenilworth and Lillington. This will require detailed justification in the same way with a detailed map showing the exact area involved. Leaving the area in the Green Belt until completion would mean applying Green Belt policies which would ultimately be irrelevant and indicates a lack of conviction. If removal cannot be justified at the start then the site must be unsuitable and to consider it as a strategic sub-regional site makes no sense at all.

I therefore OBJECT to Section 5.5 in total and RD8 in particular.

Object

Revised Development Strategy

Representation ID: 55280

Received: 29/07/2013

Respondent: University of Warwick

Agent: Turley

Representation Summary:

Previously made representations on behalf of the University of Warwick to the Preferred Options consultation of May 2012 setting out the exceptional circumstances supporting removal of the University's Central Campus West from the Green Belt.

Subsequently met with officers, and gave a presentation to Kenilworth Town Council in February 2013, which resulted in local councillors broadly supporting the principle of the University coming out of the Green Belt.

Notes that paragraph 1.4 of the RDS states that it does not cover "the full range of topics that will be included in the Local Plan" but the University hopes that this [proposal] will still be considered as part of the Submission version Local Plan.

Expresses concern that the justification to Policy RDS8 (Sub Regional Employment Site) states that the site should remain in the Green Belt until fully developed, suggesting that it might come out of the Green Belt at some point in the future.

Para 5.5.8 of the RDS states that it is not intended that this Local Plan amends Green Belt boundaries in this area, and Para 5.5.10 goes on to say that any proposal would be required to minimise the impact of new buildings on the openness of the Green Belt wherever possible, and to provide appropriate landscaping and planting to screen new development from the countryside.

The RDS wording therefore appears to seek to avoid removing land from the Green Belt to meet future development needs on the premise that allowing development in the Green Belt is meeting the same economic objective.

The University is concerned that a similar stance may be taken - i.e. because outline planning permission has been granted for further expansion of the campus within the Green Belt, this renders its removal from the Green Belt unnecessary.

This is inconsistent with Government policy as set out in the NPPF. Para 83 states that when Local Plans are being reviewed, authorities should consider Green Belt boundaries "having regard to their intended permanence in the long term" and "take account of the need to promote sustainable patterns of development" (para 84) such as those identified through the Local Plan itself.

When defining boundaries, para 85 states that LPAs should "ensure consistency with the Local Plan strategy for meeting identified requirements for sustainable development" and "not include land which it is unnecessary to keep permanently open" and "satisfy themselves that Green Belt boundaries will not need to be altered at the end of the development plan period".

The University is concerned that the approach to Policy RDS8 is inconsistent with the NPPF in terms of the need to ensure long term permanence of Green belt Boundaries, the need to promote sustainable patterns of development, and not to include land in Green Belts which is unnecessary to keep permanently open (Para 83,84 and 85)

Should a similar approach be taken towards the on-going and future development of the University of Warwick, it would also be inconsistent with Government policy. The University's desire is to remove its main campus from the Green Belt in a way consistent with national policy.

Full text:

see attachement

Object

Revised Development Strategy

Representation ID: 55348

Received: 31/07/2013

Respondent: Lisa Reay

Representation Summary:

-The RDS is unsound, unsustainable and undeliverable due to the excessive allocation of employment land and the inclusion of the sub-regional employment site.
-The consultation document identifies a need for 36ha of employment land between 2011-2030 and there already exists 48ha of employment land, therefore this is in fact an excess of employment land already available. Warwick District Council's approach turns a substantiated excess of employment land into a claimed deficit of employment land, resulting in a 66 hectares unsubstantiated need for employment. The misleading claimed defict is then used to try to justify development of new employment land in the open countryside and Green Belt at Thickthorn (8ha), part of the Gateway site (6.5ha) and sites south of Warwick and Whitnash (8ha).
-The RDS also allocates 'Sub-Regional Employment Site'. Despite the RSS being abolished, the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is in direct conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound.
-The Sub Regional Employment Site, demonstrates clear pre-determination of the Gateway application. The development would have a detrimental effect on many existing employment sites throughout the region which provide adequate alternatives meaning the Gateway would be contrary to NPPF policies on urban regeneration and brownfield first.
-The Gateway site is remote from the main areas of unemployment and more should be done cooperating with neighbouring authorities.
-WDC has a low unemployment claimant count of less than 1500 people, therefore in order to fill the 10,200 new jobs it will require people from outside the district to come and take them which will result in inflated house prices.

Full text:

Dear Sirs
I consider the Revised Development Strategy (RDS) is unsound due to the excessive allocation of employment land and the inclusion of the sub-regional employment site which in turn put further strain on the provision of housing within the District. This creates problems rather than solutions and makes the Development Strategy unsustainable and undeliverable.

Within the consultation document it identifies a need for 36ha of employment land for the period 2011 - 2030 and there already exists 48ha of available employment land, therefore there is in fact an excess of employment land already available in Warwick District. The unadjusted numbers show an excess of employment land of 12ha. This excess provides ample contingency.

Warwick District Council's approach turns a substantiated excess of employment land into a claimed deficit of employment land, resulting in a 66 hectares unsubstantiated need for employment. By a combination of land re-allocation and unreasonable 60% contingency it is claimed that "it is reasonable to provide an additional 22.5 hectares of employment land".
The misleading claimed deficit is then used to try to justify development of new employment land in the open countryside and in the Green Belt:
Thickthorn (8ha) between Kenilworth and the A46 and; [Green Belt]
Part of the Gateway site (6.5ha) around Baginton and Coventry Airport; [Green Belt]
And Southern sites (south of Warwick and Whitnash) (8ha) [Greenfield]
The RDS goes on to allocate a "Sub-Regional Employment Site". The Regional Spatial Strategy has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound.

The "Sub-Regional Employment Site" described in the consultation document, which written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application. The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.

It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.
Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC and those neighbouring LPA's should seek to direct employment land allocation where it is most needed. By protecting existing employment land and by making more reasonable assessments of buffers and flexibility, there is ample employment land available without development in the Green Belt.

Instead WDC projections provide space for 10,200 new jobs to be created. Warwick District has a low unemployment claimant count of less than 1,500 people. Therefore, in order to fill these employment places, it will be necessary to import people from outside the District. This in turn results in equally inflated housing requirements in order to accommodate these expected immigrants to the District. Housing numbers in the RDS have risen from 10,800 to 12,300 dwellings where natural growth within the District would require only 5,400. This is not planning for the objectively assessed needs of the District and it is therefore unsound.

The National Planning Policy Framework (NPPF) summarises sustainable development principles including "avoiding coalescence". But the RDS fails to achieve this principle. The so-called Sub-Regional Employment Site would cause coalescence of Coventry and Baginton and the proposed Thickthorn developments would erode significantly the separation between Kenilworth and Leamington. The Core Planning Principles in the NPPF require planning to "take account of the different roles and character of different areas, promoting the vitality of our main urban areas, protecting the Green Belts around them". The false employment land requirements put additional strain on housing numbers are not justified and would irrevocably damage the local environment.

The NPPF requires that Local Plans should meet objectively assessed needs, with sufficient flexibility to adapt to change, unless any adverse impacts would significantly outweigh the benefits, when assessed against the policies taken as a whole, or where specific policies indicate development should be restricted. For example, those policies relating to sites protected under the Birds and Habitats and/or designated as Sites of Special Scientific Interest, land designated as Green Belt, Local Green Space, and Area of Outstanding Natural Beauty. These are commonly referred to as areas of 'development restraint' where the presumption in favour of sustainable development does not apply. The RDS should be completely revised to reflect the actual needs of the District.

Object

Revised Development Strategy

Representation ID: 56435

Received: 29/07/2013

Respondent: CPRE WARWICKSHIRE

Representation Summary:

The Revised Development Strategy goes on to allocate a "Sub-Regional Employment Site" (Policy RDS8). Section 5.5 is based on an extant planning application, presenting claims from the planning application as though they were sufficient justification for the District's development strategy.

The first issue with Section 5.5 is evident in its title: the meaning of 'sub-regional' is not defined. The Regional Spatial Strategy has been abolished but the justification in section 5.5 still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with the the abolition of the RSS and makes the proposed strategy unsound. The long- established economic partnership in the area is CSW - Coventry, Solihull and Warwickshire - but the Revised Development Strategy focuses on the Coventry & Warwickshire City Deal and the CWLEP. In practice, the 'sub-region' is an artificial construct with no proven need.

While Section 5.5 purports to be describing a generic employment site for predominantly B1, B2 and B8 uses, it depends on the justification for the specific uses proposed in the Coventry Gateway application even though this focuses on the Gateway's proposed B1(b) (research and development) sub-class, for example. Policy RDS8 as described when the consultation document was written (before the planning committee considered the Coventry Gateway application in June 2013) is little more than pre-determination of the Coventry Gateway application.

Even if a 'sub-regional' need were justified, no justification is provided for siting it entirely in Warwick District and in the Green Belt. Considering that any 'sub-region' contains at least Coventry, North Warwickshire, Nuneaton & Bedworth, Rugby, Stratford upon Avon and Warwick, what is the justification for locating the 'sub-regional employment site' within Warwick District? Policy RDS8 would either take jobs from areas with greater need (unemployment is considerably higher in Coventry and Rugby, for example) or add further to the excess of employment land in Warwick District. The proposed site location undermines the well-established principle of urban regeneration, fails to recognise the brownfield-first policy (e.g. NPPF section 111) and would be inappropriate development in the Green Belt. Locating a major employment site in a rural area would increase the need to travel, particularly by car. The proposed criteria claimed to justify such a development in the Green Belt depend on policies of the abolished RSS (e.g. Coventry & Nuneaton Regeneration Zone) and vague concepts such as 'sub-regional need'.

The Core Planning Principles in the NPPF require planning to "take account of the different roles and character of different areas, promoting the vitality of our main urban areas, protecting the Green Belts around them". Policy RDS8 fails to meet this requirement. The proposed policy is not justified, it would damage the environment and it should be removed.

Full text:

1.1 We strongly oppose the scale of housing growth that the Development Strategy proposes. The The scale of development and the extent of urbanisation proposed would undermine the pattern of towns and countryside that characterise the District and make it an attractive environment. It would depart from the policies of strict control on urban expansion that have been in place for 40-50 years since the Green Belt was first effective. The effects on the historic inner parts of Warwick and Leamington would be very hamful as these would be surrounded by ever more housing and be subject to heavy traffic volumes generated by the additional development.

1.2 The District cannot retain its character and quality of life unless the housing growth is kept at much lower levels and unless much of this is by windfall development within the urban areas.

1.3 The proposals to impose 100-150 houses on each of five villages, and 70-90 on five others, would in most cases damage their rural character and unbalance their structure.


2. Principles of the Development Strategy

2.1 A main aim of the New Local Plan is to promote growth, and this is based on the Vision of the Council that growth, per se, will increase future prosperity. This fails to recognise the character of Warwick District and the limits to development and expansion of the District's towns if they and their setting are to retain the quality of environment that has been achieved by generally good planning in the last 40 years. There is no demand from the residents of the area for this aim and it has not been subject to public participation as to whether it should be the principle underlying the Plan.

2.2 A motive for significant new development appears to be the Council's belief that the scale of development proposed will increase the income of the council and lead to improved services. Even if this were the case it is not a justification for development which would change the character of the District and undermine the quality of its environment. It is unlikely to have a financial benefit, because of the cost of the additional services that new residents, many inward migrants, would require.

2.3 CPRE is also very concerned that the earlier consultation results appear to have been ignored. The consultation on Options showed most support for a lower level of development in terms of annual housebuilding ('Option 1') than is proposed in the Preferred Option. We believe that the residents of an area should have a significant influence on the way that area develops and changes.

2.4 We seek a commitment to a vision of the district as a rural area containing a number of towns, with major historic centres. The New Local Plan would lead to Warwick District becoming a significant urban sprawl with a rural fringe at risk of development and decline.

2.5 The justification for the scale of housing proposed is not made. The ONS and SHMA figures include a large element of in-migration of population into the area. It is this assumption of in-migration that leads to the high household numbers forecast and the claim that 12,300 houses are required between 2011 and 2028. The Development Strategy fails to show the actual household increase that would result from accurate application of the 2011 Census and trends in migration in most recent years.

2.6 Other representations set out the reasons for a lower housing requirement, 5,300 over the period 2011-2028 or 250 new dwellings per year. This is an achievable and acceptable level of housing provision and should be adopted by the Council. In the most recent recorded period, from 2006/7 to 2010/11, 1,400 dwellings were completed in Warwick District - an average of 280 per annum. The annual housebuilding rate proposed in the Development Strategy has not been achieved in the past and is unrealistic.

2.7 The justification for the high housing numbers is expressed by the Council as being to 'achieve economic growth rates in line with national forecasts' (para 4.1.6). Para 4.1.10 claims that economic growth in the District is linked to providing additional houses. The aim therefore appears to be to encourage in-migration by providing more housing so that more employment is provided in the area to create more 'GVA' (growth).

Not only has this aim of the Development Strategy not been subject to public consultation; it is is wholly contrary to the interests of Warwick District. It is the attractiveness of the District's towns, villages and countryside and the strict control on development that makes it economically successful. The employment growth (much in small businesses and people working from home) has not required new employment land and there has been relatively little rebuilding of existing office accommodation. There is in fact a surplus of employment land and some is not used (see paras 4.5.18-20) while the District already 'has a good range of land within its employment portfolio'. No case has been made for releasing any greenfield land for employment over what is already available.



3. Proposed Locations for Housing Development

3.1 The previous consultation (Preferred Options) proposed 'growth across the District' including on Green Belt, and in villages. The large-scale development of Green Belt north of Leamington has been withdrawn, but Green Belt development at Thickthorn, Kenilworth, at Cubbington, and adjacent to certain villages now 'washed over' by Green Belt is still proposed. The proposals for development in Green Belt at Hampton Magna, Lapworth (Kingswood), Burton Green, and Baginton are strongly opposed.

3.2 The scale of development between Warwick, Warwick Castle Park, Leamington, Whitnash and Bishops Tachbook is unacceptably large. A rural landscape which is not 'urban fringe' but valuable agricultural land would be urbanised. The eastern side of Warwick Castle Park, which past policy has kept rural, would be partly built-up. Harbury Lane should remain the southern boundary of the built-up area of Warwick & Leamington, a function it has performed effectively since the Warwick Technology Park and the housing location known as 'Warwick Gates' were developed under past Plans.

3.3 This major location would not only develop valuable open countryside. It would be car-served development since it would be too far from the town centres for walking, cycling facilities are limited, the railway stations are not near it and bus services in the District have low useage and are not generally attractive. The traffic impact of the development proposed would be so great that Warwick's historic town centre would be heavily congested and polluted by the additional traffic. Routes in and out of central Leamington area already congested at peak hours and condiktions would worsen.

3.4 The proposals for 100-150 houses at each of the non-Green Belt villages - Radford Semele, Bishops Tachbook and Barford - would overwhelm these villages. Smaller numbers may be acceptable over a long period but not development on that scale.

3.5 These housing proposals are not sustainable development, in contrast to the three brownfield site proposals within Leamington Spa which meet sustainability prlnciples.


4. Gypsies and Travellers

4.1 CPRE has commented separately on the Gypsy and Traveller Sites consultation document. We would emphasise the opportunity to co-operate with Coventry City Council to expand provision at Siskin Drive, where the boundary runs through the existing employment areas.


5. Proposals for Employment Land

5.1 In August 2012 we responded to WDC's Preferred Options raising issues including the amount and location of employment land proposed in the emerging plan. Our conclusion on employment land in 2012 was that "no new development of employment land in the Green Belt is justified". The Revised Development Strategy increases our concerns that WDC's emerging plan is unsound.

5.2 Section 3.5 of the Revised Development Strategy (May 2013) summarises sustainable development principles including "avoiding coalescence". But WDC's proposals fail to achieve this principle. The so-called Sub-Regional Employment Site would cause coalescence of Coventry and Baginton and the proposed Thickthorn developments would erode significantly the separation between Kenilworth and Leamington. The proposals are not sustainable.

5.3 There is in fact an excess of employment land already available in Warwick District. The issue of the amount of employment land is mainly caused by WDC's approach to the assessment of Employment Land Requirements. This approach turns a substantiated excess of employment land into a claimed deficit of employment land, resulting in the proposed policy RDS6 which specifies that 22.5 hectares of new employment land should be allocated between 2011 and 2029, mostly in the Green Belt.

5.4 Table 4 shows the detail behind the claimed deficit; this is reproduced below.

The supply demand balance Hectares
Demand
A. Net employment land requirement 2011 - 30 36
B. Margin to provide flexibility of supply 16.5
C. Potential redevelopment of existing employment areas 13.5
D. Total gross employment requirement (demand) 66

Supply
E. Completed employment land since 2011 0.47
F. Current available land supply 48
G. Total gross employment land supply 48.5

H. Balance to be allocated 17.5
(15 to 25)


5.5 Section 4.5.8 then takes the bottom line (Row H 'Balance to be allocated') figure of 17.5ha and increases this figure to 22.5ha in order "to allow for flexibility and the assumptions used in modelling and forecasting". The latter 'buffer' of 5ha overlaps with the Item B 'Margin to provide flexibility of supply' of 16.5ha. This is double counting. Error in modelling/ forecasting can go either way (plus or minus), not just one direction. The claim that "it is reasonable to provide an additional 22.5 hectares of employment land" is entirely unreasonable.

5.6 The established requirement (Item A) is 36ha; against this, 16.5ha 'Margin to provide flexibility of supply' is itself excessive: almost 50% extra on top of the established demand of 36ha in order to provide 'choice'; this seems to be an unjustified excessive amount of flexibility. The environment cannot afford such generous luxury of flexibility. A 10% contingency should be sufficient 3.6ha rather than 16.5ha.

5.7 The final component in the demand side of the table above is Item C 'Potential redevelopment of existing employment areas', amounting to 13.5ha. Although this seems at first sight to be supply rather than demand, more employment land is claimed to be needed because of the unjustified change of use of existing employment land, removing it all from the employment portfolio and allocating it to housing. Sections 4.5.19-4.5.20 (and 4.2.4) describe the proposal to remove 19.5ha of existing employment land and replace it with 13.5ha of new employment land.

5.8 The proposal to take all of this land out of the employment portfolio conflicts with other sections of the consultation document. Section 4.3.9 makes quite clear that some of the 'tired' employment land could be released for housing development. No justification is provided for taking all of the land out of employment use; there seems to be no reason why such employment land should not be redeveloped for continuing employment purposes (if demand is really there). It is extreme to assume that all of this land will be 'lost' to employment uses. It is not acceptable to take brownfield land in urban areas out of the employment portfolio and replace it with greenfield land outside urban areas, much in the Green Belt. The strategy should be to improve effective use of the 19.5ha for continuing employment use.

5.9 Established numbers in the above table show the base demand as 36ha (Item A) and the base supply as 48ha (Item F). The unadjusted numbers show an excess of employment land of 12ha. This excess provides ample flexibility and margin for error. A corrected version of Table 4 is provided below:

Table 4 Revised

The supply demand balance Hectares
Demand
A. Net employment land requirement 2011 - 30 36
B. Margin to provide flexibility of supply 3.6
C. Increased effectiveness of use of existing employment areas 0
D. Total gross employment requirement (demand) 39.6

Supply
E. Completed employment land since 2011 0.47
F. Current available land supply 48
G. Total gross employment land supply 48.5

H. Excess providing even more contingency and flexibility 8.9



5.10 Through double counting, unreasonable buffers and unjustified changes of use, WDC has transformed an excess of employment land of 8.9ha into a misleading claimed deficit of 22.5ha. This cannot be justified. The misleading claimed deficit is then used to try to justify development of new employment land in the Green Belt (section 4.6):
* Thickthorn (8ha) between Kenilworth and the A46;
* Part of the Coventry Gateway site (6.5ha) around Baginton and Coventry Airport.

5.11 By protecting existing employment land and by making more reasonable assessments of buffers and flexibility, there is ample employment land available without development in the Green Belt.

5.12 The Revised Development Strategy goes on to allocate a "Sub-Regional Employment Site" (Policy RDS8). Section 5.5 is based on an extant planning application, presenting claims from the planning application as though they were sufficient justification for the District's development strategy.

5.13 The first issue with Section 5.5 is evident in its title: the meaning of 'sub-regional' is not defined. The Regional Spatial Strategy has been abolished but the justification in section 5.5 still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with the the abolition of the RSS and makes the proposed strategy unsound. The long- established economic partnership in the area is CSW - Coventry, Solihull and Warwickshire - but the Revised Development Strategy focuses on the Coventry & Warwickshire City Deal and the CWLEP. In practice, the 'sub-region' is an artificial construct with no proven need.

5.14 While Section 5.5 purports to be describing a generic employment site for predominantly B1, B2 and B8 uses, it depends on the justification for the specific uses proposed in the Coventry Gateway application even though this focuses on the Gateway's proposed B1(b) (research and development) sub-class, for example. Policy RDS8 as described when the consultation document was written (before the planning committee considered the Coventry Gateway application in June 2013) is little more than pre-determination of the Coventry Gateway application.

5.15 Even if a 'sub-regional' need were justified, no justification is provided for siting it entirely in Warwick District and in the Green Belt. Considering that any 'sub-region' contains at least Coventry, North Warwickshire, Nuneaton & Bedworth, Rugby, Stratford upon Avon and Warwick, what is the justification for locating the 'sub-regional employment site' within Warwick District? Policy RDS8 would either take jobs from areas with greater need (unemployment is considerably higher in Coventry and Rugby, for example) or add further to the excess of employment land in Warwick District. The proposed site location undermines the well-established principle of urban regeneration, fails to recognise the brownfield-first policy (e.g. NPPF section 111) and would be inappropriate development in the Green Belt. Locating a major employment site in a rural area would increase the need to travel, particularly by car. The proposed criteria claimed to justify such a development in the Green Belt depend on policies of the abolished RSS (e.g. Coventry & Nuneaton Regeneration Zone) and vague concepts such as 'sub-regional need'.

5.16 The Core Planning Principles in the NPPF require planning to "take account of the different roles and character of different areas, promoting the vitality of our main urban areas, protecting the Green Belts around them". Policy RDS8 fails to meet this requirement. The proposed policy is not justified, it would damage the environment and it should be removed.

Object

Revised Development Strategy

Representation ID: 56850

Received: 02/08/2013

Respondent: Alan Williams

Representation Summary:

Considers the strategy irrational due to the excessive amount of employment land allocated and the inclusion of the sub-regional employment site. Within this geographic area there is an excessive amount of land already available and that within the logistics sector, many of the existing warehouses are far from being fully utilised. The employment claims within the various reports especially the GL Hearn report on the 'Sub-Regional Employment Site' are spurious at best.

RDS contrary to NPPF policies on urban regeneration and the logical focus on making 'brownfield' sites a priority versus designated greenbelt areas, which is not reflected in the 'Sub-Regional Employment Site'. The RDS fails on many counts to follow the principles of the NPPF policies and should be revised to reflect that actual situation that exists within the local area and provide an accurate reflection of future requirements.

Full text:

Dear Sir,

I wanted to write to you regarding the Revised Development Strategy (RDS). I consider the strategy irrational due to the excessive amount of employment land allocated and the inclusion of the sub-regional employment site.

I am a UK Director of the largest global logistics company, and know that within this geographic area there is an excessive amount of land already available and that within the sector, many of the existing warehouses are far from being fully utilised. Therefore making the employment claims within the various reports especially the GL Hearn report on the 'Sub-Regional Employment Site' spurious at best.

Another objection I have is that this plan is contrary to NPPF policies on Urban Regeneration and the logical focus on making 'brownfield' sites a priority versus designated greenbelt areas, which is not reflected in the 'Sub-Regional Employment Site'. The RDS fails on many counts to follow the principles of the NPPF policies. Therefore I believe that the RDS should be revised to reflect that actual situation that exists within the local area and provide an accurate reflection of future requirements.

Object

Revised Development Strategy

Representation ID: 57786

Received: 29/07/2013

Respondent: Walter Bush

Representation Summary:

Objects to Gateway development, its against the NPPF and has no special circumstances to support its inclusion in the Local plan. It is unsustainable and speculative development of the greenbelt and will ruin the rural character of the parish. There are suitable sites outside the greenbelt. This will not support regeneration within Coventry.

Full text:

see attached

Attachments:

Object

Revised Development Strategy

Representation ID: 57888

Received: 29/07/2013

Respondent: Hazel and Robin Fryer

Representation Summary:

Objects to the Local Plan and in particular the inclusion of the Gateway development around Baginton. The very special circumstances justifying destruction of 300 ha of green belt have not been demonstrated. The RSS which is now defunct cannot be used to justify and support the Gateway. Warwick District has low unemployment so employment should be directed to areas in need in the region or the development will detract from redeveloping brownfield sites. Providing major employment away from population centres is in opposition to the transport strategy and it is not reasonable for Warwick to destroy the greenbelt to accomodate employment for 4900 Coventry residents when there is ample industrial land within there own boundaries.
The Coventry and Nuneaton regeneration zone is well north of the district and other development sites would better address unemployment needs in these areas. The provision of new buildings in the Gateway area could exacerbate these problems. The number of jobs to be provided is unproven, it is evident that there are few occupiers waiting to take up buildings or empty sites around Coventry would have been used. The suggestion that there are no alternatives outside the greenbelt is untrue, there are many unused sites Ansty, Daw Mill colliery etc and the case that these are unsuitable does not stand up to public scrutiny.

Development at Thickthorn is inappropriate and does not have very special circumstances to justify it. Commercial land on such a prominent position can only degrade the visual appearance of the road into Kenilworth. A belt of housing along the A46 is excessive and needs reducing or it will spoil the character of the area and disrupt the narrow adjacent residential roads.
Proposals to locate housing / industry at Gallows Hill is disruptive. The access along the Castle Park will downgrade the character of this historic approach if one side is lined with development.
The influence of external groups such as the CWLEP seem to have unduly influenced the local plan.

Full text:

see-attached

Attachments:

Object

Revised Development Strategy

Representation ID: 58006

Received: 24/07/2013

Respondent: Mrs & Mr Anita & James Barnwell

Representation Summary:

The Gateway is unsustainable and inappropriate development in the Green Belt with no very special circumstances. Support Baginton Parish Councils' request that all references to the Gateway should be removed and amend the projections amended accordingly.

Full text:

Dear Sirs

We wish to lodge our objections to some of the proposals of Warwick District Council in their consultation documents, as they adversely affect our rural village community.

Gateway:
The Gateway is unsustainable and inappropriate development of the Green Belt with no very special circumstances. We support Baginton Parish Councils' request that the Local Plan should remove all references to the Gateway and amend all its projections accordingly.

Housing:
The 70-90 houses proposed for Baginton is unacceptable and disproportionate increase for the village. The Local Plan must not dictate the type of housing development to villages, but rather should take into account village desires under the Localism Act. Outcomes of our Parish Plan and Housing Needs Survey should be used in preference to the proposals in the consultation document, i.e. a maximum of 20 houses.

Gypsy/Traveller Site Options:
* The proposed Gypsy and traveller sites in Baginton (Ref G1010 & G107) are inappropriate development in the Green Belt. The consultation documents identify manor negative effects as to the sites being located on Green Belt land and being adjacent to Coventry airport, the industrial park and in the vicinity of several sewage treatment works, with the associated noise, light and air quality effects.
* The proposed sites are not within easy reach of local facilities such as doctors, schools, hospitals etc. And there is poor public transport provision.. Access from the sites to the village along the grass verges are not suitable for pushchairs, wheelchairs or use by the inform
* There are already tree traveller sites within a few miles of those proposed in Baginton at Siskin Drive, Brandon Lane and Oxford Road. Therefore the proposed sites d not satisfy the Local Plan Strategy of 'distributing development across the district'.
* The proposed site in Stoneleigh Road is on private land, which includes part of the local nursery. It is unacceptable to adversely impact on a rural business by forcing them to give up part of their land for such development, when there are more suitable sites.
* The alternative sites proposed to the south of Warwick district are preferable options to the two proposed in Baginton as they are outside Green Belt, have better access to facilities, would not have an adverse impact on a rural business and would not lead to an over-concentration of sites in one area.

Object

Revised Development Strategy

Representation ID: 58458

Received: 31/07/2013

Respondent: Amey

Representation Summary:

RSS has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound. The site proposal, which was written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application.

The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.

It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.

Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC should seek to direct employment land allocation where it is most needed.

NPPF sets out sustainable development principles including "avoiding coalescence". RDS fails to achieve this principle and the site would cause coalescence of Coventry and Baginton.

Full text:

Dear Sirs,
I consider the Revised Development Strategy (RDS) is unsound due to the excessive allocation of employment land and the inclusion of the sub-regional employment site which in turn put further strain on the provision of housing within the District. This creates problems rather than solutions and makes the Development Strategy unsustainable and undeliverable.
Within the consultation document it identifies a need for 36ha of employment land for the period 2011 - 2030 and there already exists 48ha of available employment land, therefore there is in fact an excess of employment land already available in Warwick District. The unadjusted numbers show an excess of employment land of 12ha. This excess provides ample contingency.
Warwick District Council's approach turns a substantiated excess of employment land into a claimed deficit of employment land, resulting in a 66 hectares unsubstantiated need for employment. By a combination of land re-allocation and unreasonable 60% contingency it is claimed that "it is reasonable to provide an additional 22.5 hectares of employment land".
The misleading claimed deficit is then used to try to justify development of new employment land in the open countryside and in the Green Belt:
* Thickthorn (8ha) between Kenilworth and the A46 and; [Green Belt]
* Part of the Gateway site (6.5ha) around Baginton and Coventry Airport; [Green Belt]
* And Southern sites (south of Warwick and Whitnash) (8ha) [Greenfield]
The RDS goes on to allocate a "Sub-Regional Employment Site". The Regional Spatial Strategy has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound.
The "Sub-Regional Employment Site" described in the consultation document, which written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application. The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.
It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.
Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC and those neighbouring LPA's should seek to direct employment land allocation where it is most needed. By protecting existing employment land and by making more reasonable assessments of buffers and flexibility, there is ample employment land available without development in the Green Belt.
Instead WDC projections provide space for 10,200 new jobs to be created. Warwick District has a low unemployment claimant count of less than 1,500 people. Therefore, in order to fill these employment places, it will be necessary to import people from outside the District. This in turn results in equally inflated housing requirements in order to accommodate these expected immigrants to the District. Housing numbers in the RDS have risen from 10,800 to 12,300 dwellings where natural growth within the District would require only 5,400. This is not planning for the objectively assessed needs of the District and it is therefore unsound.
The National Planning Policy Framework (NPPF) summarises sustainable development principles including "avoiding coalescence". But the RDS fails to achieve this principle. The so-called Sub-Regional Employment Site would cause coalescence of Coventry and Baginton and the proposed Thickthorn developments would erode significantly the separation between Kenilworth and Leamington. The Core Planning Principles in the NPPF require planning to "take account of the different roles and character of different areas, promoting the vitality of our main urban areas, protecting the Green Belts around them". The false employment land requirements put additional strain on housing numbers are not justified and would irrevocably damage the local environment.
The NPPF requires that Local Plans should meet objectively assessed needs, with sufficient flexibility to adapt to change, unless any adverse impacts would significantly outweigh the benefits, when assessed against the policies taken as a whole, or where specific policies indicate development should be restricted. For example, those policies relating to sites protected under the Birds and Habitats and/or designated as Sites of Special Scientific Interest, land designated as Green Belt, Local Green Space, and Area of Outstanding Natural Beauty. These are commonly referred to as areas of 'development restraint' where the presumption in favour of sustainable development does not apply. The RDS should be completely revised to reflect the actual needs of the District.

Object

Revised Development Strategy

Representation ID: 58462

Received: 01/08/2013

Respondent: Mr Antonio Martin-Castano

Representation Summary:

RSS has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound. The site proposal, which was written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application.

The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.

It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.

Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC should seek to direct employment land allocation where it is most needed.

NPPF sets out sustainable development principles including "avoiding coalescence". RDS fails to achieve this principle and the site would cause coalescence of Coventry and Baginton.

Full text:

I consider the Revised Development Strategy (RDS) is unsound due to the excessive allocation of employment land and the inclusion of the sub-regional employment site which in turn put further strain on the provision of housing within the District. This creates problems rather than solutions and makes the Development Strategy unsustainable and undeliverable.
Within the consultation document it identifies a need for 36ha of employment land for the period 2011 - 2030 and there already exists 48ha of available employment land, therefore there is in fact an excess of employment land already available in Warwick District. The unadjusted numbers show an excess of employment land of 12ha. This excess provides ample contingency.
Warwick District Council's approach turns a substantiated excess of employment land into a claimed deficit of employment land, resulting in a 66 hectares unsubstantiated need for employment. By a combination of land re-allocation and unreasonable 60% contingency it is claimed that "it is reasonable to provide an additional 22.5 hectares of employment land".
The misleading claimed deficit is then used to try to justify development of new employment land in the open countryside and in the Green Belt:
* Thickthorn (8ha) between Kenilworth and the A46 and; [Green Belt]
* Part of the Gateway site (6.5ha) around Baginton and Coventry Airport; [Green Belt]
* And Southern sites (south of Warwick and Whitnash) (8ha) [Greenfield]
The RDS goes on to allocate a "Sub-Regional Employment Site". The Regional Spatial Strategy has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound.
The "Sub-Regional Employment Site" described in the consultation document, which written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application. The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.
It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.
Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC and those neighbouring LPA's should seek to direct employment land allocation where it is most needed. By protecting existing employment land and by making more reasonable assessments of buffers and flexibility, there is ample employment land available without development in the Green Belt.
Instead WDC projections provide space for 10,200 new jobs to be created. Warwick District has a low unemployment claimant count of less than 1,500 people. Therefore, in order to fill these employment places, it will be necessary to import people from outside the District. This in turn results in equally inflated housing requirements in order to accommodate these expected immigrants to the District. Housing numbers in the RDS have risen from 10,800 to 12,300 dwellings where natural growth within the District would require only 5,400. This is not planning for the objectively assessed needs of the District and it is therefore unsound.
The National Planning Policy Framework (NPPF) summarises sustainable development principles including "avoiding coalescence". But the RDS fails to achieve this principle. The so-called Sub-Regional Employment Site would cause coalescence of Coventry and Baginton and the proposed Thickthorn developments would erode significantly the separation between Kenilworth and Leamington. The Core Planning Principles in the NPPF require planning to "take account of the different roles and character of different areas, promoting the vitality of our main urban areas, protecting the Green Belts around them". The false employment land requirements put additional strain on housing numbers are not justified and would irrevocably damage the local environment.
The NPPF requires that Local Plans should meet objectively assessed needs, with sufficient flexibility to adapt to change, unless any adverse impacts would significantly outweigh the benefits, when assessed against the policies taken as a whole, or where specific policies indicate development should be restricted. For example, those policies relating to sites protected under the Birds and Habitats and/or designated as Sites of Special Scientific Interest, land designated as Green Belt, Local Green Space, and Area of Outstanding Natural Beauty. These are commonly referred to as areas of 'development restraint' where the presumption in favour of sustainable development does not apply. The RDS should be completely revised to reflect the actual needs of the District.

Object

Revised Development Strategy

Representation ID: 58466

Received: 31/07/2013

Respondent: Sheila Woolf

Representation Summary:

RSS has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound. The site proposal, which was written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application.

The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.

It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.

Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC should seek to direct employment land allocation where it is most needed.

NPPF sets out sustainable development principles including "avoiding coalescence". RDS fails to achieve this principle and the site would cause coalescence of Coventry and Baginton.

Full text:

Dear Sirs
I consider the Revised Development Strategy (RDS) is unsound due to the excessive allocation of employment land and the inclusion of the sub-regional employment site which in turn put further strain on the provision of housing within the District. This creates problems rather than solutions and makes the Development Strategy unsustainable and undeliverable.

Within the consultation document it identifies a need for 36ha of employment land for the period 2011 - 2030 and there already exists 48ha of available employment land, therefore there is in fact an excess of employment land already available in Warwick District. The unadjusted numbers show an excess of employment land of 12ha. This excess provides ample contingency.

Warwick District Council's approach turns a substantiated excess of employment land into a claimed deficit of employment land, resulting in a 66 hectares unsubstantiated need for employment. By a combination of land re-allocation and unreasonable 60% contingency it is claimed that "it is reasonable to provide an additional 22.5 hectares of employment land".

The misleading claimed deficit is then used to try to justify development of new employment land in the open countryside and in the Green Belt:
* Thickthorn (8ha) between Kenilworth and the A46 and; [Green Belt]
* Part of the Gateway site (6.5ha) around Baginton and Coventry Airport; [Green Belt]
* And Southern sites (south of Warwick and Whitnash) (8ha) [Greenfield]
The RDS goes on to allocate a "Sub-Regional Employment Site". The Regional Spatial Strategy has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound.

The "Sub-Regional Employment Site" described in the consultation document, which written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application. The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.

It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.

Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC and those neighbouring LPA's should seek to direct employment land allocation where it is most needed. By protecting existing employment land and by making more reasonable assessments of buffers and flexibility, there is ample employment land available without development in the Green Belt.

Instead WDC projections provide space for 10,200 new jobs to be created. Warwick District has a low unemployment claimant count of less than 1,500 people. Therefore, in order to fill these employment places, it will be necessary to import people from outside the District. This in turn results in equally inflated housing requirements in order to accommodate these expected immigrants to the District. Housing numbers in the RDS have risen from 10,800 to 12,300 dwellings where natural growth within the District would require only 5,400. This is not planning for the objectively assessed needs of the District and it is therefore unsound.

The National Planning Policy Framework (NPPF) summarises sustainable development principles including "avoiding coalescence". But the RDS fails to achieve this principle. The so-called Sub-Regional Employment Site would cause coalescence of Coventry and Baginton and the proposed Thickthorn developments would erode significantly the separation between Kenilworth and Leamington. The Core Planning Principles in the NPPF require planning to "take account of the different roles and character of different areas, promoting the vitality of our main urban areas, protecting the Green Belts around them". The false employment land requirements put additional strain on housing numbers are not justified and would irrevocably damage the local environment.

The NPPF requires that Local Plans should meet objectively assessed needs, with sufficient flexibility to adapt to change, unless any adverse impacts would significantly outweigh the benefits, when assessed against the policies taken as a whole, or where specific policies indicate development should be restricted. For example, those policies relating to sites protected under the Birds and Habitats and/or designated as Sites of Special Scientific Interest, land designated as Green Belt, Local Green Space, and Area of Outstanding Natural Beauty. These are commonly referred to as areas of 'development restraint' where the presumption in favour of sustainable development does not apply. The RDS should be completely revised to reflect the actual needs of the District.

Object

Revised Development Strategy

Representation ID: 58470

Received: 02/08/2013

Respondent: Victoria Fletcher

Representation Summary:

RSS has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound. The site proposal, which was written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application.

The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.

It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.

Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC should seek to direct employment land allocation where it is most needed.

NPPF sets out sustainable development principles including "avoiding coalescence". RDS fails to achieve this principle and the site would cause coalescence of Coventry and Baginton.

Full text:

Dear Sirs,
I consider the Revised Development Strategy (RDS) is unsound due to the excessive allocation of employment land and the inclusion of the sub-regional employment site which in turn put further strain on the provision of housing within the District. This creates problems rather than solutions and makes the Development Strategy unsustainable and undeliverable.
Within the consultation document it identifies a need for 36ha of employment land for the period 2011 - 2030 and there already exists 48ha of available employment land, therefore there is in fact an excess of employment land already available in Warwick District. The unadjusted numbers show an excess of employment land of 12ha. This excess provides ample contingency.
Warwick District Council's approach turns a substantiated excess of employment land into a claimed deficit of employment land, resulting in a 66 hectares unsubstantiated need for employment. By a combination of land re-allocation and unreasonable 60% contingency it is claimed that "it is reasonable to provide an additional 22.5 hectares of employment land".
The misleading claimed deficit is then used to try to justify development of new employment land in the open countryside and in the Green Belt:
* Thickthorn (8ha) between Kenilworth and the A46 and; [Green Belt]
* Part of the Gateway site (6.5ha) around Baginton and Coventry Airport; [Green Belt]
* And Southern sites (south of Warwick and Whitnash) (8ha) [Greenfield]
The RDS goes on to allocate a "Sub-Regional Employment Site". The Regional Spatial Strategy has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound.
The "Sub-Regional Employment Site" described in the consultation document, which written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application. The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.
It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.
Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC and those neighbouring LPA's should seek to direct employment land allocation where it is most needed. By protecting existing employment land and by making more reasonable assessments of buffers and flexibility, there is ample employment land available without development in the Green Belt.
Instead WDC projections provide space for 10,200 new jobs to be created. Warwick District has a low unemployment claimant count of less than 1,500 people. Therefore, in order to fill these employment places, it will be necessary to import people from outside the District. This in turn results in equally inflated housing requirements in order to accommodate these expected immigrants to the District. Housing numbers in the RDS have risen from 10,800 to 12,300 dwellings where natural growth within the District would require only 5,400. This is not planning for the objectively assessed needs of the District and it is therefore unsound.
The National Planning Policy Framework (NPPF) summarises sustainable development principles including "avoiding coalescence". But the RDS fails to achieve this principle. The so-called Sub-Regional Employment Site would cause coalescence of Coventry and Baginton and the proposed Thickthorn developments would erode significantly the separation between Kenilworth and Leamington. The Core Planning Principles in the NPPF require planning to "take account of the different roles and character of different areas, promoting the vitality of our main urban areas, protecting the Green Belts around them". The false employment land requirements put additional strain on housing numbers are not justified and would irrevocably damage the local environment.
The NPPF requires that Local Plans should meet objectively assessed needs, with sufficient flexibility to adapt to change, unless any adverse impacts would significantly outweigh the benefits, when assessed against the policies taken as a whole, or where specific policies indicate development should be restricted. For example, those policies relating to sites protected under the Birds and Habitats and/or designated as Sites of Special Scientific Interest, land designated as Green Belt, Local Green Space, and Area of Outstanding Natural Beauty. These are commonly referred to as areas of 'development restraint' where the presumption in favour of sustainable development does not apply. The RDS should be completely revised to reflect the actual needs of the District.

Object

Revised Development Strategy

Representation ID: 58475

Received: 02/08/2013

Respondent: Rebecca King

Representation Summary:

RSS has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound. The site proposal, which was written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application.

The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.

It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.

Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC should seek to direct employment land allocation where it is most needed.

NPPF sets out sustainable development principles including "avoiding coalescence". RDS fails to achieve this principle and the site would cause coalescence of Coventry and Baginton.

Full text:

Dear Sirs
I consider the Revised Development Strategy (RDS) is unsound due to the excessive allocation of employment land and the inclusion of the sub-regional employment site which in turn put further strain on the provision of housing within the District. This creates problems rather than solutions and makes the Development Strategy unsustainable and undeliverable.
Within the consultation document it identifies a need for 36ha of employment land for the period 2011 - 2030 and there already exists 48ha of available employment land, therefore there is in fact an excess of employment land already available in Warwick District. The unadjusted numbers show an excess of employment land of 12ha. This excess provides ample contingency.
Warwick District Council's approach turns a substantiated excess of employment land into a claimed deficit of employment land, resulting in a 66 hectares unsubstantiated need for employment. By a combination of land re-allocation and unreasonable 60% contingency it is claimed that "it is reasonable to provide an additional 22.5 hectares of employment land".
The misleading claimed deficit is then used to try to justify development of new employment land in the open countryside and in the Green Belt:
* Thickthorn (8ha) between Kenilworth and the A46 and; [Green Belt]
* Part of the Gateway site (6.5ha) around Baginton and Coventry Airport; [Green Belt]
* And Southern sites (south of Warwick and Whitnash) (8ha) [Greenfield]
The RDS goes on to allocate a "Sub-Regional Employment Site". The Regional Spatial Strategy has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound.
The "Sub-Regional Employment Site" described in the consultation document, which written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application. The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.
It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.
Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC and those neighbouring LPA's should seek to direct employment land allocation where it is most needed. By protecting existing employment land and by making more reasonable assessments of buffers and flexibility, there is ample employment land available without development in the Green Belt.
Instead WDC projections provide space for 10,200 new jobs to be created. Warwick District has a low unemployment claimant count of less than 1,500 people. Therefore, in order to fill these employment places, it will be necessary to import people from outside the District. This in turn results in equally inflated housing requirements in order to accommodate these expected immigrants to the District. Housing numbers in the RDS have risen from 10,800 to 12,300 dwellings where natural growth within the District would require only 5,400. This is not planning for the objectively assessed needs of the District and it is therefore unsound.
The National Planning Policy Framework (NPPF) summarises sustainable development principles including "avoiding coalescence". But the RDS fails to achieve this principle. The so-called Sub-Regional Employment Site would cause coalescence of Coventry and Baginton and the proposed Thickthorn developments would erode significantly the separation between Kenilworth and Leamington. The Core Planning Principles in the NPPF require planning to "take account of the different roles and character of different areas, promoting the vitality of our main urban areas, protecting the Green Belts around them". The false employment land requirements put additional strain on housing numbers are not justified and would irrevocably damage the local environment.
The NPPF requires that Local Plans should meet objectively assessed needs, with sufficient flexibility to adapt to change, unless any adverse impacts would significantly outweigh the benefits, when assessed against the policies taken as a whole, or where specific policies indicate development should be restricted. For example, those policies relating to sites protected under the Birds and Habitats and/or designated as Sites of Special Scientific Interest, land designated as Green Belt, Local Green Space, and Area of Outstanding Natural Beauty. These are commonly referred to as areas of 'development restraint' where the presumption in favour of sustainable development does not apply. The RDS should be completely revised to reflect the actual needs of the District.

Object

Revised Development Strategy

Representation ID: 58478

Received: 01/08/2013

Respondent: Diane Francis

Representation Summary:

RSS has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound. The site proposal, which was written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application.

The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.

It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.

Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC should seek to direct employment land allocation where it is most needed.

NPPF sets out sustainable development principles including "avoiding coalescence". RDS fails to achieve this principle and the site would cause coalescence of Coventry and Baginton.

Full text:

I consider the Revised Development Strategy (RDS) to be incorrect because of the excessive allocation of employment land and the inclusion of the sub-regional employment site which in turn put further strain on the provision of housing within the District. This creates problems rather than solutions and makes the Development Strategy unsustainable and undeliverable.

Within the consultation document it identifies a need for 36ha of employment land for the period 2011 - 2030 and there already exists 48ha of available employment land, therefore there is in fact an excess of employment land already available in Warwick District. The unadjusted numbers show an excess of employment land of 12ha. This excess provides ample contingency.

Warwick District Council's approach turns a substantiated excess of employment land into a claimed deficit of employment land, resulting in a 66 hectares unsubstantiated need for employment. By a combination of land re-allocation and unreasonable 60% contingency it is claimed that "it is reasonable to provide an additional 22.5 hectares of employment land".

The misleading claimed deficit is then used to try to justify development of new employment land in the open countryside and in the Green Belt:
* Thickthorn (8ha) between Kenilworth and the A46 and; [Green Belt]
* Part of the Gateway site (6.5ha) around Baginton and Coventry Airport; [Green Belt]
* And Southern sites (south of Warwick and Whitnash) (8ha) [Greenfield]
The RDS goes on to allocate a "Sub-Regional Employment Site". The Regional Spatial Strategy has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound.
The "Sub-Regional Employment Site" described in the consultation document, written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application. The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.

It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.

Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC and those neighbouring LPA's should seek to direct employment land allocation where it is most needed. By protecting existing employment land and by making more reasonable assessments of buffers and flexibility, there is ample employment land available without development in the Green Belt.

Instead WDC projections provide space for 10,200 new jobs to be created. Warwick District has a low unemployment claimant count of less than 1,500 people. Therefore, in order to fill these employment places, it will be necessary to import people from outside the District. This in turn results in equally inflated housing requirements in order to accommodate these expected immigrants to the District. Housing numbers in the RDS have risen from 10,800 to 12,300 dwellings where natural growth within the District would require only 5,400. This is not planning for the objectively assessed needs of the District and it is therefore unsound.

The National Planning Policy Framework (NPPF) summarises sustainable development principles including "avoiding coalescence". But the RDS fails to achieve this principle. The so-called Sub-Regional Employment Site would cause coalescence of Coventry and Baginton and the proposed Thickthorn developments would erode significantly the separation between Kenilworth and Leamington. The Core Planning Principles in the NPPF require planning to "take account of the different roles and character of different areas, promoting the vitality of our main urban areas, protecting the Green Belts around them". The false employment land requirements put additional strain on housing numbers are not justified and would irrevocably damage the local environment.

The NPPF requires that Local Plans should meet objectively assessed needs, with sufficient flexibility to adapt to change, unless any adverse impacts would significantly outweigh the benefits, when assessed against the policies taken as a whole, or where specific policies indicate development should be restricted. For example, those policies relating to sites protected under the Birds and Habitats and/or designated as Sites of Special Scientific Interest, land designated as Green Belt, Local Green Space, and Area of Outstanding Natural Beauty. These are commonly referred to as areas of 'development restraint' where the presumption in favour of sustainable development does not apply. The RDS should be completely revised to reflect the actual needs of the District.

Object

Revised Development Strategy

Representation ID: 58481

Received: 01/08/2013

Respondent: Marianne Puxley

Representation Summary:

RSS has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound. The site proposal, which was written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application.

The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.

It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.

Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC should seek to direct employment land allocation where it is most needed.

NPPF sets out sustainable development principles including "avoiding coalescence". RDS fails to achieve this principle and the site would cause coalescence of Coventry and Baginton.

Full text:

Dear Sirs/Mesdames
I write to express my concern about the rationale of the Revised Development Strategy (RDS).
Within the consultation document it identifies a need for 36ha of employment land for the period 2011 - 2030 and there already exists 48ha of available employment land, therefore there is in fact an excess of employment land already available in Warwick District. The unadjusted numbers show an excess of employment land of 12ha. This excess provides ample contingency.
Warwick District Council's approach turns a substantiated excess of employment land into a claimed deficit of employment land, resulting in a 66 hectares unsubstantiated need for employment. By a combination of land re-allocation and unreasonable 60% contingency it is claimed that "it is reasonable to provide an additional 22.5 hectares of employment land".
The misleading claimed deficit is then used to try to justify development of new employment land in the open countryside and in the Green Belt:
* Thickthorn (8ha) between Kenilworth and the A46 and; [Green Belt]
* Part of the Gateway site (6.5ha) around Baginton and Coventry Airport; [Green Belt]
* And Southern sites (south of Warwick and Whitnash) (8ha) [Greenfield]
The RDS goes on to allocate a "Sub-Regional Employment Site". The Regional Spatial Strategy has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound.
The "Sub-Regional Employment Site" described in the consultation document, which written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application. The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.
It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.
Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC and those neighbouring LPA's should seek to direct employment land allocation where it is most needed. By protecting existing employment land and by making more reasonable assessments of buffers and flexibility, there is ample employment land available without development in the Green Belt.
Instead WDC projections provide space for 10,200 new jobs to be created. Warwick District has a low unemployment claimant count of less than 1,500 people. Therefore, in order to fill these employment places, it will be necessary to import people from outside the District. This in turn results in equally inflated housing requirements in order to accommodate these expected immigrants to the District. Housing numbers in the RDS have risen from 10,800 to 12,300 dwellings where natural growth within the District would require only 5,400. This is not planning for the objectively assessed needs of the District and it is therefore unsound.
The National Planning Policy Framework (NPPF) summarises sustainable development principles including "avoiding coalescence". But the RDS fails to achieve this principle. The so-called Sub-Regional Employment Site would cause coalescence of Coventry and Baginton and the proposed Thickthorn developments would erode significantly the separation between Kenilworth and Leamington. The Core Planning Principles in the NPPF require planning to "take account of the different roles and character of different areas, promoting the vitality of our main urban areas, protecting the Green Belts around them". The false employment land requirements put additional strain on housing numbers are not justified and would irrevocably damage the local environment.
The NPPF requires that Local Plans should meet objectively assessed needs, with sufficient flexibility to adapt to change, unless any adverse impacts would significantly outweigh the benefits, when assessed against the policies taken as a whole, or where specific policies indicate development should be restricted. For example, those policies relating to sites protected under the Birds and Habitats and/or designated as Sites of Special Scientific Interest, land designated as Green Belt, Local Green Space, and Area of Outstanding Natural Beauty. These are commonly referred to as areas of 'development restraint' where the presumption in favour of sustainable development does not apply. The RDS should be completely revised to reflect the actual needs of the District.

Object

Revised Development Strategy

Representation ID: 58483

Received: 01/08/2013

Respondent: Marianne Puxley

Representation Summary:

RSS has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound. The site proposal, which was written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application.

The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.

It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.

Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC should seek to direct employment land allocation where it is most needed.

NPPF sets out sustainable development principles including "avoiding coalescence". RDS fails to achieve this principle and the site would cause coalescence of Coventry and Baginton.

Full text:

Dear Sirs/Mesdames
I write to express my concern about the rationale of the Revised Development Strategy (RDS).
Within the consultation document it identifies a need for 36ha of employment land for the period 2011 - 2030 and there already exists 48ha of available employment land, therefore there is in fact an excess of employment land already available in Warwick District. The unadjusted numbers show an excess of employment land of 12ha. This excess provides ample contingency.
Warwick District Council's approach turns a substantiated excess of employment land into a claimed deficit of employment land, resulting in a 66 hectares unsubstantiated need for employment. By a combination of land re-allocation and unreasonable 60% contingency it is claimed that "it is reasonable to provide an additional 22.5 hectares of employment land".
The misleading claimed deficit is then used to try to justify development of new employment land in the open countryside and in the Green Belt:
* Thickthorn (8ha) between Kenilworth and the A46 and; [Green Belt]
* Part of the Gateway site (6.5ha) around Baginton and Coventry Airport; [Green Belt]
* And Southern sites (south of Warwick and Whitnash) (8ha) [Greenfield]
The RDS goes on to allocate a "Sub-Regional Employment Site". The Regional Spatial Strategy has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound.
The "Sub-Regional Employment Site" described in the consultation document, which written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application. The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.
It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.
Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC and those neighbouring LPA's should seek to direct employment land allocation where it is most needed. By protecting existing employment land and by making more reasonable assessments of buffers and flexibility, there is ample employment land available without development in the Green Belt.
Instead WDC projections provide space for 10,200 new jobs to be created. Warwick District has a low unemployment claimant count of less than 1,500 people. Therefore, in order to fill these employment places, it will be necessary to import people from outside the District. This in turn results in equally inflated housing requirements in order to accommodate these expected immigrants to the District. Housing numbers in the RDS have risen from 10,800 to 12,300 dwellings where natural growth within the District would require only 5,400. This is not planning for the objectively assessed needs of the District and it is therefore unsound.
The National Planning Policy Framework (NPPF) summarises sustainable development principles including "avoiding coalescence". But the RDS fails to achieve this principle. The so-called Sub-Regional Employment Site would cause coalescence of Coventry and Baginton and the proposed Thickthorn developments would erode significantly the separation between Kenilworth and Leamington. The Core Planning Principles in the NPPF require planning to "take account of the different roles and character of different areas, promoting the vitality of our main urban areas, protecting the Green Belts around them". The false employment land requirements put additional strain on housing numbers are not justified and would irrevocably damage the local environment.
The NPPF requires that Local Plans should meet objectively assessed needs, with sufficient flexibility to adapt to change, unless any adverse impacts would significantly outweigh the benefits, when assessed against the policies taken as a whole, or where specific policies indicate development should be restricted. For example, those policies relating to sites protected under the Birds and Habitats and/or designated as Sites of Special Scientific Interest, land designated as Green Belt, Local Green Space, and Area of Outstanding Natural Beauty. These are commonly referred to as areas of 'development restraint' where the presumption in favour of sustainable development does not apply. The RDS should be completely revised to reflect the actual needs of the District.

Object

Revised Development Strategy

Representation ID: 58485

Received: 01/08/2013

Respondent: Lucy Hughes

Representation Summary:

RSS has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound. The site proposal, which was written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application.

The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.

It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.

Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC should seek to direct employment land allocation where it is most needed.

NPPF sets out sustainable development principles including "avoiding coalescence". RDS fails to achieve this principle and the site would cause coalescence of Coventry and Baginton.

Full text:

Dear Sirs
I consider the Revised Development Strategy (RDS) is unsound due to the excessive allocation of employment land and the inclusion of the sub-regional employment site which in turn put further strain on the provision of housing within the District. This creates problems rather than solutions and makes the Development Strategy unsustainable and undeliverable.
Within the consultation document it identifies a need for 36ha of employment land for the period 2011 - 2030 and there already exists 48ha of available employment land, therefore there is in fact an excess of employment land already available in Warwick District. The unadjusted numbers show an excess of employment land of 12ha. This excess provides ample contingency.
Warwick District Council's approach turns a substantiated excess of employment land into a claimed deficit of employment land, resulting in a 66 hectares unsubstantiated need for employment. By a combination of land re-allocation and unreasonable 60% contingency it is claimed that "it is reasonable to provide an additional 22.5 hectares of employment land".
The misleading claimed deficit is then used to try to justify development of new employment land in the open countryside and in the Green Belt:
* Thickthorn (8ha) between Kenilworth and the A46 and; [Green Belt]
* Part of the Gateway site (6.5ha) around Baginton and Coventry Airport; [Green Belt]
* And Southern sites (south of Warwick and Whitnash) (8ha) [Greenfield]
The RDS goes on to allocate a "Sub-Regional Employment Site". The Regional Spatial Strategy has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound.
The "Sub-Regional Employment Site" described in the consultation document, which written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application. The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.
It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.
Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC and those neighbouring LPA's should seek to direct employment land allocation where it is most needed. By protecting existing employment land and by making more reasonable assessments of buffers and flexibility, there is ample employment land available without development in the Green Belt.
Instead WDC projections provide space for 10,200 new jobs to be created. Warwick District has a low unemployment claimant count of less than 1,500 people. Therefore, in order to fill these employment places, it will be necessary to import people from outside the District. This in turn results in equally inflated housing requirements in order to accommodate these expected immigrants to the District. Housing numbers in the RDS have risen from 10,800 to 12,300 dwellings where natural growth within the District would require only 5,400. This is not planning for the objectively assessed needs of the District and it is therefore unsound.
The National Planning Policy Framework (NPPF) summarises sustainable development principles including "avoiding coalescence". But the RDS fails to achieve this principle. The so-called Sub-Regional Employment Site would cause coalescence of Coventry and Baginton and the proposed Thickthorn developments would erode significantly the separation between Kenilworth and Leamington. The Core Planning Principles in the NPPF require planning to "take account of the different roles and character of different areas, promoting the vitality of our main urban areas, protecting the Green Belts around them". The false employment land requirements put additional strain on housing numbers are not justified and would irrevocably damage the local environment.
The NPPF requires that Local Plans should meet objectively assessed needs, with sufficient flexibility to adapt to change, unless any adverse impacts would significantly outweigh the benefits, when assessed against the policies taken as a whole, or where specific policies indicate development should be restricted. For example, those policies relating to sites protected under the Birds and Habitats and/or designated as Sites of Special Scientific Interest, land designated as Green Belt, Local Green Space, and Area of Outstanding Natural Beauty. These are commonly referred to as areas of 'development restraint' where the presumption in favour of sustainable development does not apply. The RDS should be completely revised to reflect the actual needs of the District.

Object

Revised Development Strategy

Representation ID: 58488

Received: 01/08/2013

Respondent: Mr Tony Francis

Representation Summary:

RSS has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound. The site proposal, which was written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application.

The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.

It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.

Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC should seek to direct employment land allocation where it is most needed.

NPPF sets out sustainable development principles including "avoiding coalescence". RDS fails to achieve this principle and the site would cause coalescence of Coventry and Baginton.

Full text:

I consider the Revised Development Strategy (RDS) is unsound due to the excessive allocation of employment land and the inclusion of the sub-regional employment site which in turn put further strain on the provision of housing within the District. This creates problems rather than solutions and makes the Development Strategy unsustainable and undeliverable.


Within the consultation document it identifies a need for 36ha of employment land for the period 2011 - 2030 and there already exists 48ha of available employment land, therefore there is in fact an excess of employment land already available in Warwick District. The unadjusted numbers show an excess of employment land of 12ha. This excess provides ample contingency.


Warwick District Council's approach turns a substantiated excess of employment land into a claimed deficit of employment land, resulting in a
66 hectares unsubstantiated need for employment. By a combination of land re-allocation and unreasonable 60% contingency it is claimed that "it is reasonable to provide an additional 22.5 hectares of employment land".


The misleading claimed deficit is then used to try to justify development of new employment land in the open countryside and in the Green Belt:
Thickthorn (8ha) between Kenilworth and the A46 and; [Green Belt]
Part of the Gateway site (6.5ha) around Baginton and Coventry
Airport; [Green Belt]
And Southern sites (south of Warwick and Whitnash) (8ha) [Greenfield]


The RDS goes on to allocate a "Sub-Regional Employment Site". The Regional Spatial Strategy has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound.


The "Sub-Regional Employment Site" described in the consultation document, which written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application. The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.


It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.


Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment.
Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC and those neighbouring LPA's should seek to direct employment land allocation where it is most needed.
By protecting existing employment land and by making more reasonable assessments of buffers and flexibility, there is ample employment land available without development in the Green Belt.


Instead WDC projections provide space for 10,200 new jobs to be created.
Warwick District has a low unemployment claimant count of less than 1,500 people. Therefore, in order to fill these employment places, it will be necessary to import people from outside the District. This in turn results in equally inflated housing requirements in order to accommodate these expected immigrants to the District. Housing numbers in the RDS have risen from 10,800 to 12,300 dwellings where natural growth within the District would require only 5,400. This is not planning for the objectively assessed needs of the District and it is therefore unsound.


The National Planning Policy Framework (NPPF) summarises sustainable development principles including "avoiding coalescence". But the RDS fails to achieve this principle. The so-called Sub-Regional Employment Site would cause coalescence of Coventry and Baginton and the proposed Thickthorn developments would erode significantly the separation between Kenilworth and Leamington. The Core Planning Principles in the NPPF require planning to "take account of the different roles and character of different areas, promoting the vitality of our main urban areas, protecting the Green Belts around them". The false employment land requirements put additional strain on housing numbers are not justified and would irrevocably damage the local environment.


The NPPF requires that Local Plans should meet objectively assessed needs, with sufficient flexibility to adapt to change, unless any adverse impacts would significantly outweigh the benefits, when assessed against the policies taken as a whole, or where specific policies indicate development should be restricted. For example, those policies relating to sites protected under the Birds and Habitats and/or designated as Sites of Special Scientific Interest, land designated as Green Belt, Local Green Space, and Area of Outstanding Natural Beauty. These are commonly referred to as areas of 'development restraint' where the presumption in favour of sustainable development does not apply. The RDS should be completely revised to reflect the actual needs of the District.

Object

Revised Development Strategy

Representation ID: 58491

Received: 01/08/2013

Respondent: D I Franklin

Representation Summary:

RSS has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound. The site proposal, which was written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application.

The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.

It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.

Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC should seek to direct employment land allocation where it is most needed.

NPPF sets out sustainable development principles including "avoiding coalescence". RDS fails to achieve this principle and the site would cause coalescence of Coventry and Baginton.

Full text:

Dear Sirs
I consider the Revised Development Strategy (RDS) is unsound due to the excessive allocation of employment land and the inclusion of the sub-regional employment site which in turn put further strain on the provision of housing within the District. This creates problems rather than solutions and makes the Development Strategy unsustainable and undeliverable.
Within the consultation document it identifies a need for 36ha of employment land for the period 2011 - 2030 and there already exists 48ha of available employment land, therefore there is in fact an excess of employment land already available in Warwick District. The unadjusted numbers show an excess of employment land of 12ha. This excess provides ample contingency.
Warwick District Council's approach turns a substantiated excess of employment land into a claimed deficit of employment land, resulting in a 66 hectares unsubstantiated need for employment. By a combination of land re-allocation and unreasonable 60% contingency it is claimed that "it is reasonable to provide an additional 22.5 hectares of employment land".
The misleading claimed deficit is then used to try to justify development of new employment land in the open countryside and in the Green Belt:
* Thickthorn (8ha) between Kenilworth and the A46 and; [Green Belt]
* Part of the Gateway site (6.5ha) around Baginton and Coventry Airport; [Green Belt]
* And Southern sites (south of Warwick and Whitnash) (8ha) [Greenfield]
The RDS goes on to allocate a "Sub-Regional Employment Site". The Regional Spatial Strategy has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound.
The "Sub-Regional Employment Site" described in the consultation document, which written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application. The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.
It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.
Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC and those neighbouring LPA's should seek to direct employment land allocation where it is most needed. By protecting existing employment land and by making more reasonable assessments of buffers and flexibility, there is ample employment land available without development in the Green Belt.
Instead WDC projections provide space for 10,200 new jobs to be created. Warwick District has a low unemployment claimant count of less than 1,500 people. Therefore, in order to fill these employment places, it will be necessary to import people from outside the District. This in turn results in equally inflated housing requirements in order to accommodate these expected immigrants to the District. Housing numbers in the RDS have risen from 10,800 to 12,300 dwellings where natural growth within the District would require only 5,400. This is not planning for the objectively assessed needs of the District and it is therefore unsound.
The National Planning Policy Framework (NPPF) summarises sustainable development principles including "avoiding coalescence". But the RDS fails to achieve this principle. The so-called Sub-Regional Employment Site would cause coalescence of Coventry and Baginton and the proposed Thickthorn developments would erode significantly the separation between Kenilworth and Leamington. The Core Planning Principles in the NPPF require planning to "take account of the different roles and character of different areas, promoting the vitality of our main urban areas, protecting the Green Belts around them". The false employment land requirements put additional strain on housing numbersare not justified and would irrevocably damage the local environment.
The NPPF requires that Local Plans should meet objectively assessed needs, with sufficient flexibility to adapt to change, unless any adverse impacts would significantly outweigh the benefits, when assessed against the policies taken as a whole, or where specific policies indicate development should be restricted. For example, those policies relating to sites protected under the Birds and Habitats and/or designated as Sites of Special Scientific Interest, land designated as Green Belt, Local Green Space, and Area of Outstanding Natural Beauty. These are commonly referred to as areas of 'development restraint' where the presumption in favour of sustainable development does not apply. The RDS should be completely revised to reflect the actual needs of the District.

Object

Revised Development Strategy

Representation ID: 58494

Received: 01/08/2013

Respondent: David Ellis

Representation Summary:

RSS has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound. The site proposal, which was written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application.

The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.

It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.

Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC should seek to direct employment land allocation where it is most needed.

NPPF sets out sustainable development principles including "avoiding coalescence". RDS fails to achieve this principle and the site would cause coalescence of Coventry and Baginton.

Full text:

Dear Sirs
I consider the Revised Development Strategy (RDS) is unsound due to the excessive allocation of employment land and the inclusion of the sub-regional employment site which in turn put further strain on the provision of housing within the District. This creates problems rather than solutions and makes the Development Strategy unsustainable and undeliverable.
Within the consultation document it identifies a need for 36ha of employment land for the period 2011 - 2030 and there already exists 48ha of available employment land, therefore there is in fact an excess of employment land already available in Warwick District. The unadjusted numbers show an excess of employment land of 12ha. This excess provides ample contingency.
Warwick District Council's approach turns a substantiated excess of employment land into a claimed deficit of employment land, resulting in a 66 hectares unsubstantiated need for employment. By a combination of land re-allocation and unreasonable 60% contingency it is claimed that "it is reasonable to provide an additional 22.5 hectares of employment land".
The misleading claimed deficit is then used to try to justify development of new employment land in the open countryside and in the Green Belt:
* Thickthorn (8ha) between Kenilworth and the A46 and; [Green Belt]
* Part of the Gateway site (6.5ha) around Baginton and Coventry Airport; [Green Belt]
* And Southern sites (south of Warwick and Whitnash) (8ha) [Greenfield]
The RDS goes on to allocate a "Sub-Regional Employment Site". The Regional Spatial Strategy has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound.
The "Sub-Regional Employment Site" described in the consultation document, which written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application. The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.
It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.
Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC and those neighbouring LPA's should seek to direct employment land allocation where it is most needed. By protecting existing employment land and by making more reasonable assessments of buffers and flexibility, there is ample employment land available without development in the Green Belt.
Instead WDC projections provide space for 10,200 new jobs to be created. Warwick District has a low unemployment claimant count of less than 1,500 people. Therefore, in order to fill these employment places, it will be necessary to import people from outside the District. This in turn results in equally inflated housing requirements in order to accommodate these expected immigrants to the District. Housing numbers in the RDS have risen from 10,800 to 12,300 dwellings where natural growth within the District would require only 5,400. This is not planning for the objectively assessed needs of the District and it is therefore unsound.
The National Planning Policy Framework (NPPF) summarises sustainable development principles including "avoiding coalescence". But the RDS fails to achieve this principle. The so-called Sub-Regional Employment Site would cause coalescence of Coventry and Baginton and the proposed Thickthorn developments would erode significantly the separation between Kenilworth and Leamington. The Core Planning Principles in the NPPF require planning to "take account of the different roles and character of different areas, promoting the vitality of our main urban areas, protecting the Green Belts around them". The false employment land requirements put additional strain on housing numbers are not justified and would irrevocably damage the local environment.
The NPPF requires that Local Plans should meet objectively assessed needs, with sufficient flexibility to adapt to change, unless any adverse impacts would significantly outweigh the benefits, when assessed against the policies taken as a whole, or where specific policies indicate development should be restricted. For example, those policies relating to sites protected under the Birds and Habitats and/or designated as Sites of Special Scientific Interest, land designated as Green Belt, Local Green Space, and Area of Outstanding Natural Beauty. These are commonly referred to as areas of 'development restraint' where the presumption in favour of sustainable development does not apply. The RDS should be completely revised to reflect the actual needs of the District.

Object

Revised Development Strategy

Representation ID: 58497

Received: 01/08/2013

Respondent: Don Thomas

Representation Summary:

RSS has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound. The site proposal, which was written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application.

The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.

It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.

Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC should seek to direct employment land allocation where it is most needed.

NPPF sets out sustainable development principles including "avoiding coalescence". RDS fails to achieve this principle and the site would cause coalescence of Coventry and Baginton.

Full text:

Dear Sirs
I consider the Revised Development Strategy (RDS) is unsound due to the excessive allocation of employment land and the inclusion of the sub-regional employment site which in turn put further strain on the provision of housing within the District. This creates problems rather than solutions and makes the Development Strategy unsustainable and undeliverable.
Within the consultation document it identifies a need for 36ha of employment land for the period 2011 - 2030 and there already exists 48ha of available employment land, therefore there is in fact an excess of employment land already available in Warwick District. The unadjusted numbers show an excess of employment land of 12ha. This excess provides ample contingency.
Warwick District Council's approach turns a substantiated excess of employment land into a claimed deficit of employment land, resulting in a 66 hectares unsubstantiated need for employment. By a combination of land re-allocation and unreasonable 60% contingency it is claimed that "it is reasonable to provide an additional 22.5 hectares of employment land".
The misleading claimed deficit is then used to try to justify development of new employment land in the open countryside and in the Green Belt:
* Thickthorn (8ha) between Kenilworth and the A46 and; [Green Belt]
* Part of the Gateway site (6.5ha) around Baginton and Coventry Airport; [Green Belt]
* And Southern sites (south of Warwick and Whitnash) (8ha) [Greenfield]
The RDS goes on to allocate a "Sub-Regional Employment Site". The Regional Spatial Strategy has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound.
The "Sub-Regional Employment Site" described in the consultation document, which written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application. The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.
It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.
Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC and those neighbouring LPA's should seek to direct employment land allocation where it is most needed. By protecting existing employment land and by making more reasonable assessments of buffers and flexibility, there is ample employment land available without development in the Green Belt.
Instead WDC projections provide space for 10,200 new jobs to be created. Warwick District has a low unemployment claimant count of less than 1,500 people. Therefore, in order to fill these employment places, it will be necessary to import people from outside the District. This in turn results in equally inflated housing requirements in order to accommodate these expected immigrants to the District. Housing numbers in the RDS have risen from 10,800 to 12,300 dwellings where natural growth within the District would require only 5,400. This is not planning for the objectively assessed needs of the District and it is therefore unsound.
The National Planning Policy Framework (NPPF) summarises sustainable development principles including "avoiding coalescence". But the RDS fails to achieve this principle. The so-called Sub-Regional Employment Site would cause coalescence of Coventry and Baginton and the proposed Thickthorn developments would erode significantly the separation between Kenilworth and Leamington. The Core Planning Principles in the NPPF require planning to "take account of the different roles and character of different areas, promoting the vitality of our main urban areas, protecting the Green Belts around them". The false employment land requirements put additional strain on housing numbers are not justified and would irrevocably damage the local environment.
The NPPF requires that Local Plans should meet objectively assessed needs, with sufficient flexibility to adapt to change, unless any adverse impacts would significantly outweigh the benefits, when assessed against the policies taken as a whole, or where specific policies indicate development should be restricted. For example, those policies relating to sites protected under the Birds and Habitats and/or designated as Sites of Special Scientific Interest, land designated as Green Belt, Local Green Space, and Area of Outstanding Natural Beauty. These are commonly referred to as areas of 'development restraint' where the presumption in favour of sustainable development does not apply. The RDS should be completely revised to reflect the actual needs of the District.

Object

Revised Development Strategy

Representation ID: 58500

Received: 01/08/2013

Respondent: Duncan Sibley

Representation Summary:

RSS has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound. The site proposal, which was written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application.

The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.

It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.

Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC should seek to direct employment land allocation where it is most needed.

NPPF sets out sustainable development principles including "avoiding coalescence". RDS fails to achieve this principle and the site would cause coalescence of Coventry and Baginton.

Full text:

Dear Sirs
I consider the Revised Development Strategy (RDS) is unsound due to the excessive allocation of employment land and the inclusion of the sub-regional employment site which in turn put further strain on the provision of housing within the District. This creates problems rather than solutions and makes the Development Strategy unsustainable and undeliverable.
Within the consultation document it identifies a need for 36ha of employment land for the period 2011 - 2030 and there already exists 48ha of available employment land, therefore there is in fact an excess of employment land already available in Warwick District. The unadjusted numbers show an excess of employment land of 12ha. This excess provides ample contingency.
Warwick District Council's approach turns a substantiated excess of employment land into a claimed deficit of employment land, resulting in a 66 hectares unsubstantiated need for employment. By a combination of land re-allocation and unreasonable 60% contingency it is claimed that "it is reasonable to provide an additional 22.5 hectares of employment land".
The misleading claimed deficit is then used to try to justify development of new employment land in the open countryside and in the Green Belt:
*    Thickthorn (8ha) between Kenilworth and the A46 and; [Green Belt]
*    Part of the Gateway site (6.5ha) around Baginton and Coventry Airport; [Green Belt]
*    And Southern sites (south of Warwick and Whitnash) (8ha) [Greenfield]
The RDS goes on to allocate a "Sub-Regional Employment Site". The Regional Spatial Strategy has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound.
The "Sub-Regional Employment Site" described in the consultation document, which written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application. The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.
It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.
Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC and those neighbouring LPA's should seek to direct employment land allocation where it is most needed. By protecting existing employment land and by making more reasonable assessments of buffers and flexibility, there is ample employment land available without development in the Green Belt.
Instead WDC projections provide space for 10,200 new jobs to be created. Warwick District has a low unemployment claimant count of less than 1,500 people. Therefore, in order to fill these employment places, it will be necessary to import people from outside the District. This in turn results in equally inflated housing requirements in order to accommodate these expected immigrants to the District. Housing numbers in the RDS have risen from 10,800 to 12,300 dwellings where natural growth within the District would require only 5,400. This is not planning for the objectively assessed needs of the District and it is therefore unsound.
The National Planning Policy Framework (NPPF) summarises sustainable development principles including "avoiding coalescence". But the RDS fails to achieve this principle. The so-called Sub-Regional Employment Site would cause coalescence of Coventry and Baginton and the proposed Thickthorn developments would erode significantly the separation between Kenilworth and Leamington. The Core Planning Principles in the NPPF require planning to "take account of the different roles and character of different areas, promoting the vitality of our main urban areas, protecting the Green Belts around them". The false employment land requirements put additional strain on housing numbers are not justified and would irrevocably damage the local environment.
The NPPF requires that Local Plans should meet objectively assessed needs, with sufficient flexibility to adapt to change, unless any adverse impacts would significantly outweigh the benefits, when assessed against the policies taken as a whole, or where specific policies indicate development should be restricted. For example, those policies relating to sites protected under the Birds and Habitats and/or designated as Sites of Special Scientific Interest, land designated as Green Belt, Local Green Space, and Area of Outstanding Natural Beauty. These are commonly referred to as areas of 'development restraint' where the presumption in favour of sustainable development does not apply. The RDS should be completely revised to reflect the actual needs of the District.

Object

Revised Development Strategy

Representation ID: 58505

Received: 01/08/2013

Respondent: Anne Ellis

Representation Summary:

RSS has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound. The site proposal, which was written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application.

The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.

It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.

Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC should seek to direct employment land allocation where it is most needed.

NPPF sets out sustainable development principles including "avoiding coalescence". RDS fails to achieve this principle and the site would cause coalescence of Coventry and Baginton.

Full text:

I consider the Revised Development Strategy (RDS) is unsound due to the excessive allocation of employment land and the inclusion of the sub-regional employment site which in turn put further strain on the provision of housing within the District. This creates problems rather than solutions and makes the Development Strategy unsustainable and undeliverable.
Within the consultation document it identifies a need for 36ha of employment land for the period 2011 - 2030 and there already exists 48ha of available employment land, therefore there is in fact an excess of employment land already available in Warwick District. The unadjusted numbers show an excess of employment land of 12ha. This excess provides ample contingency.
Warwick District Council's approach turns a substantiated excess of employment land into a claimed deficit of employment land, resulting in a 66 hectares unsubstantiated need for employment. By a combination of land re-allocation and unreasonable 60% contingency it is claimed that "it is reasonable to provide an additional 22.5 hectares of employment land".
The misleading claimed deficit is then used to try to justify development of new employment land in the open countryside and in the Green Belt:
* Thickthorn (8ha) between Kenilworth and the A46 and; [Green Belt]
* Part of the Gateway site (6.5ha) around Baginton and Coventry Airport; [Green Belt]
* And Southern sites (south of Warwick and Whitnash) (8ha) [Greenfield]
The RDS goes on to allocate a "Sub-Regional Employment Site". The Regional Spatial Strategy has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound.
The "Sub-Regional Employment Site" described in the consultation document, which written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application. The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.
It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.
Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC and those neighbouring LPA's should seek to direct employment land allocation where it is most needed. By protecting existing employment land and by making more reasonable assessments of buffers and flexibility, there is ample employment land available without development in the Green Belt.
Instead WDC projections provide space for 10,200 new jobs to be created. Warwick District has a low unemployment claimant count of less than 1,500 people. Therefore, in order to fill these employment places, it will be necessary to import people from outside the District. This in turn results in equally inflated housing requirements in order to accommodate these expected immigrants to the District. Housing numbers in the RDS have risen from 10,800 to 12,300 dwellings where natural growth within the District would require only 5,400. This is not planning for the objectively assessed needs of the District and it is therefore unsound.
The National Planning Policy Framework (NPPF) summarises sustainable development principles including "avoiding coalescence". But the RDS fails to achieve this principle. The so-called Sub-Regional Employment Site would cause coalescence of Coventry and Baginton and the proposed Thickthorn developments would erode significantly the separation between Kenilworth and Leamington. The Core Planning Principles in the NPPF require planning to "take account of the different roles and character of different areas, promoting the vitality of our main urban areas, protecting the Green Belts around them". The false employment land requirements put additional strain on housing numbers are not justified and would irrevocably damage the local environment.
The NPPF requires that Local Plans should meet objectively assessed needs, with sufficient flexibility to adapt to change, unless any adverse impacts would significantly outweigh the benefits, when assessed against the policies taken as a whole, or where specific policies indicate development should be restricted. For example, those policies relating to sites protected under the Birds and Habitats and/or designated as Sites of Special Scientific Interest, land designated as Green Belt, Local Green Space, and Area of Outstanding Natural Beauty. These are commonly referred to as areas of 'development restraint' where the presumption in favour of sustainable development does not apply. The RDS should be completely revised to reflect the actual needs of the District.

Object

Revised Development Strategy

Representation ID: 58508

Received: 01/08/2013

Respondent: Ms Celia Baly

Representation Summary:

RSS has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound. The site proposal, which was written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application.

The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.

It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.

Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC should seek to direct employment land allocation where it is most needed.

NPPF sets out sustainable development principles including "avoiding coalescence". RDS fails to achieve this principle and the site would cause coalescence of Coventry and Baginton.

Full text:

I consider the Revised Development Strategy (RDS) is unsound due to the excessive allocation of employment land and the inclusion of the sub-regional employment site which in turn put further strain on the provision of housing within the District. This creates problems rather than solutions and makes the Development Strategy unsustainable and undeliverable.
Within the consultation document it identifies a need for 36ha of employment land for the period 2011 - 2030 and there already exists 48ha of available employment land, therefore there is in fact an excess of employment land already available in Warwick District. The unadjusted numbers show an excess of employment land of 12ha. This excess provides ample contingency.
Warwick District Council's approach turns a substantiated excess of employment land into a claimed deficit of employment land, resulting in a 66 hectares unsubstantiated need for employment. By a combination of land re-allocation and unreasonable 60% contingency it is claimed that "it is reasonable to provide an additional 22.5 hectares of employment land".
The misleading claimed deficit is then used to try to justify development of new employment land in the open countryside and in the Green Belt:
* Thickthorn (8ha) between Kenilworth and the A46 and; [Green Belt]
* Part of the Gateway site (6.5ha) around Baginton and Coventry Airport; [Green Belt]
* And Southern sites (south of Warwick and Whitnash) (8ha) [Greenfield]
The RDS goes on to allocate a "Sub-Regional Employment Site". The Regional Spatial Strategy has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound.
The "Sub-Regional Employment Site" described in the consultation document, which written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application. The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.
It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.
Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC and those neighbouring LPA's should seek to direct employment land allocation where it is most needed. By protecting existing employment land and by making more reasonable assessments of buffers and flexibility, there is ample employment land available without development in the Green Belt.
Instead WDC projections provide space for 10,200 new jobs to be created. Warwick District has a low unemployment claimant count of less than 1,500 people. Therefore, in order to fill these employment places, it will be necessary to import people from outside the District. This in turn results in equally inflated housing requirements in order to accommodate these expected immigrants to the District. Housing numbers in the RDS have risen from 10,800 to 12,300 dwellings where natural growth within the District would require only 5,400. This is not planning for the objectively assessed needs of the District and it is therefore unsound.
The National Planning Policy Framework (NPPF) summarises sustainable development principles including "avoiding coalescence". But the RDS fails to achieve this principle. The so-called Sub-Regional Employment Site would cause coalescence of Coventry and Baginton and the proposed Thickthorn developments would erode significantly the separation between Kenilworth and Leamington. The Core Planning Principles in the NPPF require planning to "take account of the different roles and character of different areas, promoting the vitality of our main urban areas, protecting the Green Belts around them". The false employment land requirements put additional strain on housing numbers are not justified and would irrevocably damage the local environment.
The NPPF requires that Local Plans should meet objectively assessed needs, with sufficient flexibility to adapt to change, unless any adverse impacts would significantly outweigh the benefits, when assessed against the policies taken as a whole, or where specific policies indicate development should be restricted. For example, those policies relating to sites protected under the Birds and Habitats and/or designated as Sites of Special Scientific Interest, land designated as Green Belt, Local Green Space, and Area of Outstanding Natural Beauty. These are commonly referred to as areas of 'development restraint' where the presumption in favour of sustainable development does not apply. The RDS should be completely revised to reflect the actual needs of the District.

Object

Revised Development Strategy

Representation ID: 58511

Received: 31/07/2013

Respondent: Mrs Margaret Wallis

Representation Summary:

RSS has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound. The site proposal, which was written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application.

The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.

It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.

Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC should seek to direct employment land allocation where it is most needed.

NPPF sets out sustainable development principles including "avoiding coalescence". RDS fails to achieve this principle and the site would cause coalescence of Coventry and Baginton.

Full text:

Dear Sirs
I consider the Revised Development Strategy (RDS) is unsound due to the excessive allocation of employment land and the inclusion of the sub-regional employment site which in turn puts further strain on the provision of housing within the District. This creates problems rather than solutions and makes the Development Strategy unsustainable and undeliverable.
Within the consultation document it identifies a need for 36ha of employment land for the period 2011 - 2030. 48ha of available employment land already exists so there is in fact an excess of employment land already available in Warwick District. The unadjusted numbers show an excess of employment land of 12ha. This excess provides ample contingency.
Warwick District Council's approach turns a substantiated excess of employment land into a claimed deficit of employment land, resulting in a 66 hectares unsubstantiated need for employment. By a combination of land re-allocation and unreasonable 60% contingency it is claimed that "it is reasonable to provide an additional 22.5 hectares of employment land".
The misleading claimed deficit is then used to try to justify development of new employment land in the open countryside and in the Green Belt:
* Thickthorn (8ha) between Kenilworth and the A46 and; [Green Belt]
* Part of the Gateway site (6.5ha) around Baginton and Coventry Airport; [Green Belt]
* And Southern sites (south of Warwick and Whitnash) (8ha) [Greenfield]
The RDS goes on to allocate a "Sub-Regional Employment Site". The Regional Spatial Strategy has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound.
The "Sub-Regional Employment Site" described in the consultation document, which written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application. The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.
It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.
Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC and those neighbouring LPA's should seek to direct employment land allocation where it is most needed. By protecting existing employment land and by making more reasonable assessments of buffers and flexibility, there is ample employment land available without development in the Green Belt.
Instead WDC projections provide space for 10,200 new jobs to be created. Warwick District has a low unemployment claimant count of less than 1,500 people. Therefore, in order to fill these employment places, it will be necessary to import people from outside the District. This in turn results in equally inflated housing requirements in order to accommodate these expected immigrants to the District. Housing numbers in the RDS have risen from 10,800 to 12,300 dwellings where natural growth within the District would require only 5,400. This is not planning for the objectively assessed needs of the District and it is therefore unsound. Additionally, there are huge implications for existing infrastruscture as well as schools, access to GPs etc., as well as housing.
The National Planning Policy Framework (NPPF) summarises sustainable development principles including "avoiding coalescence". But the RDS fails to achieve this principle. The so-called Sub-Regional Employment Site would cause coalescence of Coventry and Baginton and the proposed Thickthorn developments would erode significantly the separation between Kenilworth and Leamington. The Core Planning Principles in the NPPF require planning to "take account of the different roles and character of different areas, promoting the vitality of our main urban areas, protecting the Green Belts around them". The false employment land requirements put additional strain on housing numbers are not justified and would irrevocably damage the local environment.
The NPPF requires that Local Plans should meet objectively assessed needs, with sufficient flexibility to adapt to change, unless any adverse impacts would significantly outweigh the benefits, when assessed against the policies taken as a whole, or where specific policies indicate development should be restricted. For example, those policies relating to sites protected under the Birds and Habitats and/or designated as Sites of Special Scientific Interest, land designated as Green Belt, Local Green Space, and Area of Outstanding Natural Beauty. These are commonly referred to as areas of 'development restraint' where the presumption in favour of sustainable development does not apply.
All the above points mean that the RDS should be completely revised in order to reflect the actual needs of the District.

Object

Revised Development Strategy

Representation ID: 58514

Received: 02/08/2013

Respondent: Archy Muir

Representation Summary:

RSS has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound. The site proposal, which was written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application.

The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.

It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.

Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC should seek to direct employment land allocation where it is most needed.

NPPF sets out sustainable development principles including "avoiding coalescence". RDS fails to achieve this principle and the site would cause coalescence of Coventry and Baginton.

Full text:

I consider the Revised Development Strategy (RDS) unsound due to the excessive allocation of employment land and the inclusion of the sub-regional employment site which in turn put further strain on the provision of housing within the District. This creates problems rather than solutions and makes the Development Strategy unsustainable and undeliverable.
Within the consultation document it identifies a need for 36ha of employment land for the period 2011 - 2030 and there already exists 48ha of available employment land, therefore there is in fact an excess of employment land already available in Warwick District. The unadjusted numbers show an excess of employment land of 12ha. This excess provides ample contingency.
Warwick District Council's approach turns a substantiated excess of employment land into a claimed deficit of employment land, resulting in a 66 hectares unsubstantiated need for employment. By a combination of land re-allocation and unreasonable 60% contingency it is claimed that "it is reasonable to provide an additional 22.5 hectares of employment land".
The misleading claimed deficit is then used to try to justify development of new employment land in the open countryside and in the Green Belt:
* Thickthorn (8ha) between Kenilworth and the A46 and; [Green Belt]
* Part of the Gateway site (6.5ha) around Baginton and Coventry Airport; [Green Belt]
* And Southern sites (south of Warwick and Whitnash) (8ha) [Greenfield]
The RDS goes on to allocate a "Sub-Regional Employment Site". The Regional Spatial Strategy has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound.
The "Sub-Regional Employment Site" described in the consultation document, which written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application. The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.
It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.
Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC and those neighbouring LPA's should seek to direct employment land allocation where it is most needed. By protecting existing employment land and by making more reasonable assessments of buffers and flexibility, there is ample employment land available without development in the Green Belt.
Instead WDC projections provide space for 10,200 new jobs to be created. Warwick District has a low unemployment claimant count of less than 1,500 people. Therefore, in order to fill these employment places, it will be necessary to import people from outside the District. This in turn results in equally inflated housing requirements in order to accommodate these expected immigrants to the District. Housing numbers in the RDS have risen from 10,800 to 12,300 dwellings where natural growth within the District would require only 5,400. This is not planning for the objectively assessed needs of the District and it is therefore unsound.
The National Planning Policy Framework (NPPF) summarises sustainable development principles including "avoiding coalescence". But the RDS fails to achieve this principle. The so-called Sub-Regional Employment Site would cause coalescence of Coventry and Baginton and the proposed Thickthorn developments would erode significantly the separation between Kenilworth and Leamington. The Core Planning Principles in the NPPF require planning to "take account of the different roles and character of different areas, promoting the vitality of our main urban areas, protecting the Green Belts around them". The false employment land requirements put additional strain on housing numbers are not justified and would irrevocably damage the local environment.
The NPPF requires that Local Plans should meet objectively assessed needs, with sufficient flexibility to adapt to change, unless any adverse impacts would significantly outweigh the benefits, when assessed against the policies taken as a whole, or where specific policies indicate development should be restricted. For example, those policies relating to sites protected under the Birds and Habitats and/or designated as Sites of Special Scientific Interest, land designated as Green Belt, Local Green Space, and Area of Outstanding Natural Beauty. These are commonly referred to as areas of 'development restraint' where the presumption in favour of sustainable development does not apply. The RDS should be completely revised to reflect the actual needs of the District.

Object

Revised Development Strategy

Representation ID: 58517

Received: 02/08/2013

Respondent: Kirsty Muir

Representation Summary:

RSS has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound. The site proposal, which was written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application.

The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.

It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.

Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC should seek to direct employment land allocation where it is most needed.

NPPF sets out sustainable development principles including "avoiding coalescence". RDS fails to achieve this principle and the site would cause coalescence of Coventry and Baginton.

Full text:

I consider the Revised Development Strategy (RDS) unsound due to the excessive allocation of employment land and the inclusion of the sub-regional employment site which in turn put further strain on the provision of housing within the District. This creates problems rather than solutions and makes the Development Strategy unsustainable and undeliverable.
Within the consultation document it identifies a need for 36ha of employment land for the period 2011 - 2030 and there already exists 48ha of available employment land, therefore there is in fact an excess of employment land already available in Warwick District. The unadjusted numbers show an excess of employment land of 12ha. This excess provides ample contingency.
Warwick District Council's approach turns a substantiated excess of employment land into a claimed deficit of employment land, resulting in a 66 hectares unsubstantiated need for employment. By a combination of land re-allocation and unreasonable 60% contingency it is claimed that "it is reasonable to provide an additional 22.5 hectares of employment land".
The misleading claimed deficit is then used to try to justify development of new employment land in the open countryside and in the Green Belt:
* Thickthorn (8ha) between Kenilworth and the A46 and; [Green Belt]
* Part of the Gateway site (6.5ha) around Baginton and Coventry Airport; [Green Belt]
* And Southern sites (south of Warwick and Whitnash) (8ha) [Greenfield]
The RDS goes on to allocate a "Sub-Regional Employment Site". The Regional Spatial Strategy has been abolished but the justification still relies on its policies such as the Coventry & Warwickshire Regeneration Zone. This is directly in conflict with Government policy on the abolition of the RSS and makes the proposed strategy unsound.
The "Sub-Regional Employment Site" described in the consultation document, which written before the planning application for Gateway was considered in June 2013, demonstrates clear pre-determination of that application. The development would have a detrimental effect on many existing employment sites throughout the region that remain largely undeveloped. These provide perfectly adequate alternatives and the Gateway would undermine their redevelopment. This would be contrary to NPPF policies on urban regeneration and "brownfield first" another reason why the Strategy is unsound.
It was estimated by GL Hearn that around 8,200 jobs might be created by the development around Coventry airport of which 6,000 might be new jobs. Of the total, it is estimated that 1,200 jobs will be taken by people living in Warwick District, the remainder from elsewhere.
Warwick District has low unemployment and by contrast, Coventry, North Warwickshire, Rugby, Nuneaton and Bedworth have high unemployment. Therefore, the Gateway site is clearly remote from the main areas of unemployment. In considering employment need and in cooperation with neighbouring Local Planning Authorities WDC and those neighbouring LPA's should seek to direct employment land allocation where it is most needed. By protecting existing employment land and by making more reasonable assessments of buffers and flexibility, there is ample employment land available without development in the Green Belt.
Instead WDC projections provide space for 10,200 new jobs to be created. Warwick District has a low unemployment claimant count of less than 1,500 people. Therefore, in order to fill these employment places, it will be necessary to import people from outside the District. This in turn results in equally inflated housing requirements in order to accommodate these expected immigrants to the District. Housing numbers in the RDS have risen from 10,800 to 12,300 dwellings where natural growth within the District would require only 5,400. This is not planning for the objectively assessed needs of the District and it is therefore unsound.
The National Planning Policy Framework (NPPF) summarises sustainable development principles including "avoiding coalescence". But the RDS fails to achieve this principle. The so-called Sub-Regional Employment Site would cause coalescence of Coventry and Baginton and the proposed Thickthorn developments would erode significantly the separation between Kenilworth and Leamington. The Core Planning Principles in the NPPF require planning to "take account of the different roles and character of different areas, promoting the vitality of our main urban areas, protecting the Green Belts around them". The false employment land requirements put additional strain on housing numbers are not justified and would irrevocably damage the local environment.
The NPPF requires that Local Plans should meet objectively assessed needs, with sufficient flexibility to adapt to change, unless any adverse impacts would significantly outweigh the benefits, when assessed against the policies taken as a whole, or where specific policies indicate development should be restricted. For example, those policies relating to sites protected under the Birds and Habitats and/or designated as Sites of Special Scientific Interest, land designated as Green Belt, Local Green Space, and Area of Outstanding Natural Beauty. These are commonly referred to as areas of 'development restraint' where the presumption in favour of sustainable development does not apply. The RDS should be completely revised to reflect the actual needs of the District.