PO18: Flooding & Water
Support
Preferred Options
Representation ID: 51422
Received: 27/07/2012
Respondent: Matt Bourne
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51432
Received: 27/07/2012
Respondent: Rachel Sparkes
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51442
Received: 27/07/2012
Respondent: Simon Cartwright
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51452
Received: 27/07/2012
Respondent: Sam Davies
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51462
Received: 27/07/2012
Respondent: Mr Roland Crisp
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51472
Received: 27/07/2012
Respondent: D W Rogers
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51482
Received: 27/07/2012
Respondent: mr tim landreth
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51492
Received: 27/07/2012
Respondent: James Robins
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51502
Received: 27/07/2012
Respondent: Charley May
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51512
Received: 27/07/2012
Respondent: Peter Jackson
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51522
Received: 27/07/2012
Respondent: Katie Bard
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51532
Received: 27/07/2012
Respondent: Jackie Mullen
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51542
Received: 27/07/2012
Respondent: J Schirmer
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51552
Received: 27/07/2012
Respondent: Colin Perry
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51562
Received: 27/07/2012
Respondent: Fiona Miller
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51572
Received: 27/07/2012
Respondent: C Jorgensen
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51582
Received: 27/07/2012
Respondent: Mrs Mary Calderbank
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51592
Received: 27/07/2012
Respondent: Mrs Gillian Crisp
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51602
Received: 27/07/2012
Respondent: Je Bewick
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51622
Received: 27/07/2012
Respondent: Mark Robins
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51632
Received: 27/07/2012
Respondent: Sara Dixon
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51642
Received: 27/07/2012
Respondent: James Toogood
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51652
Received: 27/07/2012
Respondent: Mr Hugh Roberts
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51662
Received: 27/07/2012
Respondent: Mrs Kelly Dix
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51672
Received: 27/07/2012
Respondent: Louise Clarke
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51682
Received: 27/07/2012
Respondent: Barrie Corless
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51692
Received: 27/07/2012
Respondent: David Woolley
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51702
Received: 27/07/2012
Respondent: Colin Wilcox
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51712
Received: 27/07/2012
Respondent: Sue Wilcox
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Support
Preferred Options
Representation ID: 51722
Received: 27/07/2012
Respondent: Chris Kenny
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details: