PO8: Economy
Object
Preferred Options
Representation ID: 51529
Received: 27/07/2012
Respondent: Jackie Mullen
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51539
Received: 27/07/2012
Respondent: J Schirmer
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51549
Received: 27/07/2012
Respondent: Colin Perry
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51559
Received: 27/07/2012
Respondent: Fiona Miller
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51569
Received: 27/07/2012
Respondent: C Jorgensen
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51579
Received: 27/07/2012
Respondent: Mrs Mary Calderbank
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51589
Received: 27/07/2012
Respondent: Mrs Gillian Crisp
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51599
Received: 27/07/2012
Respondent: Je Bewick
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51619
Received: 27/07/2012
Respondent: Mark Robins
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51629
Received: 27/07/2012
Respondent: Sara Dixon
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51639
Received: 27/07/2012
Respondent: James Toogood
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51649
Received: 27/07/2012
Respondent: Mr Hugh Roberts
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51659
Received: 27/07/2012
Respondent: Mrs Kelly Dix
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51669
Received: 27/07/2012
Respondent: Louise Clarke
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51679
Received: 27/07/2012
Respondent: Barrie Corless
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51689
Received: 27/07/2012
Respondent: David Woolley
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51699
Received: 27/07/2012
Respondent: Colin Wilcox
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51709
Received: 27/07/2012
Respondent: Sue Wilcox
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51719
Received: 27/07/2012
Respondent: Chris Kenny
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51729
Received: 27/07/2012
Respondent: Peter Grady
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51739
Received: 27/07/2012
Respondent: Katie Landreth
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51749
Received: 27/07/2012
Respondent: Hannah Laming
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51759
Received: 27/07/2012
Respondent: David Dixon
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51769
Received: 27/07/2012
Respondent: Mr Clive Blockley
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51779
Received: 27/07/2012
Respondent: James Broad
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51789
Received: 27/07/2012
Respondent: Mr Richard Cooke
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51799
Received: 27/07/2012
Respondent: Chris Coombes
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51809
Received: 27/07/2012
Respondent: Tessa Coombes
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51819
Received: 27/07/2012
Respondent: Mr Phil Green
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Object
Preferred Options
Representation ID: 51829
Received: 27/07/2012
Respondent: Mrs Gill Jaffray
Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details: