BASE HEADER

Do you broadly support the proposals in the How to Have Your Say chapter? If you have any additional points to raise with regards to this chapter please include them here.

Yn dangos sylwadau a ffurflenni 211 i 240 o 327

No

Preferred Options 2025

ID sylw: 98362

Derbyniwyd: 06/03/2025

Ymatebydd: Mrs Susan Hague

Crynodeb o'r Gynrychiolaeth:

I understand the district must respond to the rise in population but the housing amount of 54,000 is unnecessarily excessive and unreasonable. I do not know why this allocation has not been appealed or challenged.

Other

Preferred Options 2025

ID sylw: 98556

Derbyniwyd: 06/03/2025

Ymatebydd: Mr Peter Tibbles

Crynodeb o'r Gynrychiolaeth:

The location and accessibility of some of the sites are many miles from proposed development sites and often limited to working hours. This limits the ability of local residents to attend and understand the proposals, particularly those with limited mobility and those who can't access online services

Yes

Preferred Options 2025

ID sylw: 98621

Derbyniwyd: 06/03/2025

Ymatebydd: Stratford upon Avon District Council

Crynodeb o'r Gynrychiolaeth:

This chapter could have benefited from some better infographics, that contain a useful summary of what is being consulted, working with a plain text is not the most impactful way to engage with the user.

No

Preferred Options 2025

ID sylw: 98718

Derbyniwyd: 06/03/2025

Ymatebydd: Old Milverton and Blackdown Parish Council

Crynodeb o'r Gynrychiolaeth:

Although carefully structured, it is very long, and to understand it fully it is necessary to read many more documents than just the 187 pages of the consultation paper itself. The number of supporting documents and the level of detail are too onerous for members of the public and other non-specialists (e.g. town and parish councillors) to be able to digest fully. The process therefore appears skewed towards planning professionals who are i) conversant with the terminology/issues and ii) have teams of people and resources to dedicate to it. OMBJPC feels that this should be acknowledged when considering the responses.

No

Preferred Options 2025

ID sylw: 98731

Derbyniwyd: 06/03/2025

Ymatebydd: Makestone Strategic Land - Ashow

Asiant : Mr Jack Barnes

Crynodeb o'r Gynrychiolaeth:

The Plan needs to demonstrate specific, deliverable sites for five years following the intended date of adoption (anticipated to be 2028-2033). The Plan needs to allocate specific deliverable sites to accord with paragraph 72 of the National Planning Policy Framework. Proposed changes required to ensure soundness: identify and allocate small and medium scale sites as part of the draft plan. One such site is Makestone Strategic Land’s site at Ashow (2024 Housing and Employment Land Availability Assessment [HELAA] ref. 193.

Yes

Preferred Options 2025

ID sylw: 98785

Derbyniwyd: 06/03/2025

Ymatebydd: Philip Sykes

Crynodeb o'r Gynrychiolaeth:

It needs to be made crystal clear what is the nature of Call for Sites. Whilst is is commendable in terms of openness, every time is causes fear and panic and sensational headlines in the local press. To some extent there is real danger of it causing a self-fulfilling prophesy. Also sites that have been previously been subject to planning permission refusal should NOT be included where factors leading to a refusal remain unchanged.

Yes

Preferred Options 2025

ID sylw: 98787

Derbyniwyd: 06/03/2025

Ymatebydd: Mr Douglas Gordon

Crynodeb o'r Gynrychiolaeth:

None

No

Preferred Options 2025

ID sylw: 98813

Derbyniwyd: 06/03/2025

Ymatebydd: (1) AG Family Trust 2024 & (2) N. Holdsworth

Asiant : The Tyler Parkes Partnership Ltd

Crynodeb o'r Gynrychiolaeth:

* A single local plan should be produced, rather than a 2-part plan, to provide certainty.
* There is no timescale for Part 2.
* Support for the 25 year time horizon but, given the lengthy timescale for new settlements to come forward.
* It is highly unlikely that any significant contribution will be forthcoming from a new settlement for at least 10 years.
* Our clients’ land could contribute to the Districts’ housing requirements in the short term.

Other

Preferred Options 2025

ID sylw: 98872

Derbyniwyd: 06/03/2025

Ymatebydd: Mrs Jacqueline West

Crynodeb o'r Gynrychiolaeth:

(1) Absence of POSTAL notification to all residents
(2) Sheer volume of information
(3) Short duration of consulation for new areas such as F2 and F3
is unfair to a portion of the population, the elderly (or whom more in rural areas) and those who do not use digital communications, the time poor, less determined & less literate general public.

No

Preferred Options 2025

ID sylw: 98964

Derbyniwyd: 06/03/2025

Ymatebydd: Tania White

Crynodeb o'r Gynrychiolaeth:

I think Warwickshire seems to be taking more than its fair share of housing allocation. I agree that a degree of new housing needs to take place but transport links need to be sustainable. The quality of housing needs to be addressed too as there are too many housing estates where properties are cheek by jowl. Careful consideration needs to be given to quality of life.

No

Preferred Options 2025

ID sylw: 99203

Derbyniwyd: 06/03/2025

Ymatebydd: Mr Chris Kershaw

Crynodeb o'r Gynrychiolaeth:

The proposals
- are out of scale with the local environment and will adversely impact Bearley and surrounding villages
-will exceed the capacity of the local infrastructure ie roads ,sewage ,education, and health .
- sites selected partly due to the ownership structure which makes site assembly easier than other shortlisted sites
-area suffers from excessive flooding and will mean that this will be exacerbated.
The promise of new facilities to support the development will inevitably be diluted (as with other large scale schemes ) as the developers renegotiate their provision as development costs rise and viability suffers

Other

Preferred Options 2025

ID sylw: 99233

Derbyniwyd: 06/03/2025

Ymatebydd: Mrs Elaine Atter

Crynodeb o'r Gynrychiolaeth:

Infrastructure is the key issue. Please address the current and potential infrastructure problems before agreeing to the building of more properties.

No

Preferred Options 2025

ID sylw: 99380

Derbyniwyd: 06/03/2025

Ymatebydd: Mrs Diane Wilson

Crynodeb o'r Gynrychiolaeth:

See my previous comments

Yes

Preferred Options 2025

ID sylw: 99467

Derbyniwyd: 06/03/2025

Ymatebydd: Stratford upon Avon District Council

Crynodeb o'r Gynrychiolaeth:

NA

No

Preferred Options 2025

ID sylw: 99544

Derbyniwyd: 06/03/2025

Ymatebydd: Mr jasvir paddan

Crynodeb o'r Gynrychiolaeth:

Extra services will need to be provided, extra shops, parks schools roads to be improved in the area

No

Preferred Options 2025

ID sylw: 99570

Derbyniwyd: 06/03/2025

Ymatebydd: Mr Simon Hopkins

Crynodeb o'r Gynrychiolaeth:

This is a complete destruction of south Warwickshire, more and more housing with no thought to either the current residents nor the impact upon the natural world.
Infrastructure is creeking at its seams, roads are at times grid locked, rail services have not been considered.

Other

Preferred Options 2025

ID sylw: 99611

Derbyniwyd: 06/03/2025

Ymatebydd: Ms Sue Bedford

Crynodeb o'r Gynrychiolaeth:

N/A

No

Preferred Options 2025

ID sylw: 99633

Derbyniwyd: 06/03/2025

Ymatebydd: Mr Richard Stone -Johnston

Crynodeb o'r Gynrychiolaeth:

Green Belt analysis:
The green belt review included as technical evidence is flawed. LSP7 and LSP8 make strong contributions to the greenbelt.

No

Preferred Options 2025

ID sylw: 99656

Derbyniwyd: 06/03/2025

Ymatebydd: Ms Pamela Phillips

Crynodeb o'r Gynrychiolaeth:

I strongly oppose the building of homes near Wilmcote and Bearley.

No

Preferred Options 2025

ID sylw: 99670

Derbyniwyd: 06/03/2025

Ymatebydd: Mr Richard Stone -Johnston

Crynodeb o'r Gynrychiolaeth:

SG05 - Land East of Lillington

Green Belt Analysis

a. Green Belt review included as technical evidence is flawed - LSP7 and LSP8 make strong contributions to the green belt.
b. Sites LSP7 and LSP8 protect the separation between Lillington / Leamington and Cubbington Village - If SG05 is allowed to proceed, Cubbington will lose it village identity and be completely subsumed as a suburb of Leamington.
c. As per the findings of the last local plan inspection, this is one of the key purposes for Green Belt and as such it should be protected.

Yes

Preferred Options 2025

ID sylw: 99715

Derbyniwyd: 06/03/2025

Ymatebydd: Ms Rachel Shakespeare

Crynodeb o'r Gynrychiolaeth:

I am writing to object to the proposal of the G1 site. I live in Northend. The GP surgery in Fenny Compton is already extremely busy, the primary school (also in Fenny) is over subscribed. There is no secondary school. There are no major roads. The area is known to flood multiple times a year. Surely there are better more suited sites. There isn't the required infrastructure and this site seems completely inappropriate.

No

Preferred Options 2025

ID sylw: 99804

Derbyniwyd: 06/03/2025

Ymatebydd: Mr Peter Delve

Crynodeb o'r Gynrychiolaeth:

x

No

Preferred Options 2025

ID sylw: 99836

Derbyniwyd: 06/03/2025

Ymatebydd: Mrs Charlotte Coates

Crynodeb o'r Gynrychiolaeth:

I am writing to express my strong objection to the proposed local area housing plan. This development threatens to overwhelm Shipstons infrastructure, significantly increase traffic congestion, and strain public services such as schools and stretched healthcare facilities. Moreover, the plan poses a risk to our local environment, harming our limited green spaces and building on land prone to flooding. The development poses a threat to the unique character and essence of our Shipston will be irrevocably altered. I urge you to reconsider the plan and engage in meaningful dialogue with residents to find a more sustainable and community-friendly solution.

Yes

Preferred Options 2025

ID sylw: 99851

Derbyniwyd: 06/03/2025

Ymatebydd: Stratford District Council Green Group

Crynodeb o'r Gynrychiolaeth:

It would be good to be able to submit

No

Preferred Options 2025

ID sylw: 99936

Derbyniwyd: 06/03/2025

Ymatebydd: Ben Coates

Crynodeb o'r Gynrychiolaeth:

New developments already overwhelm existing infrastructure in the town, especially drainage, that any further development would be unacceptable and had the potential to erode the town “feeling” residents value so highly

No

Preferred Options 2025

ID sylw: 99948

Derbyniwyd: 06/03/2025

Ymatebydd: Mrs Karen Collins

Crynodeb o'r Gynrychiolaeth:

I object to the release of the Greenbelt adjacent to North Leamington site SG06 and specifically LS02 as it fails to meet the following requirements - Conditions to build on the Green Belt & Sustainable neighborhood criteria.

Yes

Preferred Options 2025

ID sylw: 100037

Derbyniwyd: 06/03/2025

Ymatebydd: Mrs Liz Smith

Crynodeb o'r Gynrychiolaeth:

All the new building that has so far taken place in Shipston has definitely not taken into consideration Infrastructure. The town cannot support more housing unless improvements are made to the schools, doctors, roads, drainage to name a few. Where will people work?

No

Preferred Options 2025

ID sylw: 100279

Derbyniwyd: 06/03/2025

Ymatebydd: Mr Howard Lucas

Crynodeb o'r Gynrychiolaeth:

Whilst I fully understand & accept the need for additional housing, I'm saying no to the development of area SG19, primarily because the overall global infrastructure south of the river to support the size of development proposed doesn't currently exist.

No

Preferred Options 2025

ID sylw: 100544

Derbyniwyd: 07/03/2025

Ymatebydd: Mr Joe Rukin

Crynodeb o'r Gynrychiolaeth:

I do not know if this call for sites is something totally new that is not represented on the map, or the stuff that is hidden when people go onto the interactive map. It is unbelievable that you have a map which doesn't include this, or maybe the previous call for sites. The consultation seems to have been deliberately designed to create confusion around the current and previous call to sites. It's almost as it you are deliberately hiding sites in the call for sites from the consultation.

No

Preferred Options 2025

ID sylw: 100564

Derbyniwyd: 07/03/2025

Ymatebydd: Mrs Amanda Massey

Crynodeb o'r Gynrychiolaeth:

N/A